wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

tle123123123123

Total questions: 49

Worksheet time: 16mins

Name
Class
Date
1.

1. Prepare objectives/ goals in making

the project.

2. List down materials, tools and

equipment, with their quantity and

cost.

3. Prepare a sketch of the project to be

used as a guide

4. Procedures or guidelines in the

execution of the project will follow

based on the sketch to be provided.

5. A set of criteria for evaluating the

project should be evolved so that an

objective judgement of the finished

product can be done.

a)

OBJECTIVES

b)

PLANNING THE PROJECT

c)

NAME OF THE PROJECT

d)

MATERIALS NEEDED

2.

Aim or goal to happen of a certain project

a)

Procedure

b)

Project quality

c)

Objectives

d)

Tools and materials

3.

It Gives the idea what the project is all about

a)

Tools and Materoials

b)

Design of the project

c)

Name of the project

d)

Objectives

4.

Process of outlining or creating a project

a)

objectives

b)

project risk

c)

Design of the project

d)

procedure

5.

used to put things together

a)

Objectives

b)

Project plan

c)

tools and materials

d)

Materials needed

6.

An accomplishing step by step followed in a regular order

a)

procedure

b)

objectives

c)

name of the project

d)

communication

7.

referred to the construction of work

a)

Tools and materials

b)

Objectives

c)

Crochet

d)

Materials needed

8.

Basic need of every project

a)

Design of the project

b)

Tools and materials

c)

objectives

d)

Materials needed

9.

process to establish the required structure

of a project with the use of time and to

execute the chart plan as a basis for the

progress of the specified project

a)

PLANNING THE PROJECT

b)

OBJECTIVES

c)

PLANNING THE PROJECT

d)

PROJECT PLAN

10.

definining the roles and

responsibilities of an individual

or participants participated of

a specified project to determine

the cost and deadline of a

certain project.

a)

Project Schedule

b)

Project Resources

c)

Project Charter Scope

d)

Project Budget & Cost

e)

Project Quality

11.

listing of activities like deliveries

of a project when should the

plan started and finished to

indicate the duration of the

time, the needed resources

must be utilize with in a

period of time

a)

Project Quality

b)

Project Resources

c)

Project Budget & Cost

d)

Project Schedule

e)

Project Charter Scope

12.

producing people, supplies

and other equipment as

required, to execute

materials that the project

will successful

a)

Project Budget & Cost

b)

Project Resources

c)

Project Risk

d)

Project Quality

e)

Project communication

13.

most important element in doing a project wherein it shows the total amount or cost of the needed material, labor, and other associated finances procured of the project

a)

Project communication

b)

Project schedule

c)

Project Quality

d)

Project Risk

e)

Project budget and cost

14.

product or service that has

been done, that will satisfy

the need and suit to the

requirement

a)

Project Quality

b)

Project Charter Scope

c)

Project Risk

d)

Project Resources

e)

Project communication

15.

positive and negative

results that may occur in

a certain project

a)

Project Resources

b)

Project Budget & Cost

c)

Project Risk

d)

Project communication

e)

imissyou

16.

the best way of exchanging

ideas, methods and information

that will establish and utilize

good leadership

a)

Project Schedule

b)

Project Quality

c)

Project communication

d)

Project Charter Scope

e)

Project Risk

17.

The very first step when crocheting. -Starting to work on crocheting something.

a)

Double crochet(Dc)

b)

Beginning(Beg)

c)

Chains(Ch/s)

d)

Finished Object(FO)

18.

A basic crochet stitch in which yarn is pulled with the crochet hook through a loop on the hook to form a continuous strand of interlocking single loops.

Used to begin a row of crochet to 'lift' the work up to the next level. Different stitches require a different number of crochet chains.

a)

Finished Object(FO)

b)

Chains(Ch/s)

c)

Double crochet(Dc)

d)

Increase(Inc)

19.

 A taller stitch than single crochet. It is formed by a "yarn over," which is wrapping yarn from back to front before placing the hook in the stitch.

a)

Finished Object(FO)

b)

Place Marker(PM)

c)

Increase(Inc)

d)

Double crochet(Dc)

20.

A spot in the crochet pattern that you will need to keep track of.

a)

Repeat(Rep)

b)

Double Treble(Dtr)

c)

Place Marker(PM)

d)

Reverse(Rev)

21.

Usually done over a specific number of stitches and a specific number of rows.

a)

Half Treble(Htr)

b)

Double Treble(Dtr)

c)

Repeat(Rep)

d)

Reverse(Rev)

22.

It is same as a regular single crochet.

The only difference is that you work it in the next stitch to the right instead of to the left.

a)

Reverse(Rev)

b)

Half Treble(Htr)

c)

Loop(Lp)

d)

Double Treble(Dtr)

23.

A longer version of the post stitch is. employs three yarn overs rather than one before entering the cloth, using the same general principle as the double crochet.

a)

Double Treble(Dtr)

b)

Half Treble(Htr)

c)

Decrease(Dec)

d)

Loop(Lp)

24.

are stitches that are the next height up to a double crochet stitch.

a)

Loop(Lp)

b)

Front Loop(Flo)

c)

Half Treble(Htr)

d)

Decrease(Dec)

25.

By holding your tension finger in various positions, you may adjust the size of your loop. For a smaller loop, get closer to the task for a larger loop, get farther away.

a)

Decrease(Dec)

b)

Loop(Lp)

c)

Front Loop(Flo)

d)

Slip Stitch(Sl St)

26.

makes the current row or round that you are working on shorter than the one previous to it.

a)

Front Loop(Flo)

b)

Back Loop(Blo)

c)

Decrease(Dec)

d)

Slip Stitch(Sl St)

27.

has very little height.

It is used to join stitches that are worked in rounds such as a granny square.

It is also used to travel to another part of a row without producing any visible stitches (such as indenting an armhole on a sweater).

a)

Slip Stitch(Sl St)

b)

Back Loop(Blo)

c)

Front Loop(Flo)

d)

Half Double Crochet(Hdc)

28.

is the part of the "v" that is closest to you. It's at the front of the stitch, relative to you. To work into the FLO, begin your stitch as usual. Then, insert your hook under the portion of the "v" that is closest to you. Push the hook out through the middle of the "v".

a)

Half Double Crochet(Hdc)

b)

Front Loop(Flo)

c)

Single Crochet Together(Sc2tog)

d)

Back Loop(Blo)

29.

The part of the V farther away from you on the opposite side is the back loop. Typically, when you crochet you insert your hook under both the front and back loops of the V.

a)

Half Double Crochet(Hdc)

b)

Back Loop(Blo)

c)

Single Crochet Together(Sc2tog)

d)

Front Loop(Flo)

30.

is the halfway point between a single crochet (sc) and double crochet stitch (dc). Compared to a sc stitch, it requires a yarn over before you insert the hook into a stitch, and requires you to pull the final yarn over through all 3 loops on the hook.

a)

Half Double Crochet(Hdc)

b)

Half Double Two Together(Hdc2tog)

c)

Invisible Decrease(Inv dec)

d)

Single Crochet Together(Sc2tog)

31.

To use single crochet to join two stitches together.

It is a way to decrease (make the item smaller.) Insert hook into stitch and draw up a loop. Insert hook into next stitch and draw up a loop.

a)

Invisible Decrease(Inv dec)

b)

Double Crochet Together(Dc2tog)

c)

Half Double Two Together(Hdc2tog)

d)

Single Crochet Together(Sc2tog)

32.

is an alternative method of decreasing which will make your decrease stitch look much like the other stitches in the row, resulting in a smoother and more even crochet fabric.

a)

Invisible Decrease(Inv dec)

b)

Half Double Two Together(Hdc2tog)

c)

Double Crochet Together(Dc2tog)

d)

Rounds(Rnds)

33.

is a half double crochet decrease method that helps you decrease the amount of stitches from your pattern.

a)

Half Double Two Together(Hdc2tog)

b)

Main color(Mc)

c)

Rounds(Rnds)

d)

Double Crochet Together(Dc2tog)

34.

Taking what were two double crochet stitches and turning them into just one double crochet stitch.

a)

Half Double Crochet(Hdc)

b)

Double Crochet Together(Dc2tog)

c)

Rounds(Rnds)

d)

Half Double Two Together(Hdc2tog)

35.

is simply a circle of stitches

a)

Main color(Mc)

b)

Front Post Single Crochet(Fpsc)

c)

Contrasting Color(Cc)

d)

Rounds(Rnds)

36.

It is a part of a process of crochet wherein we are choosing what specific color do we use in order to complete our product.

a)

Contrasting Color(Cc)

b)

Skip(Sk)

c)

Front Post Single Crochet(Fpsc)

d)

Main color(Mc)

37.

Like main color (Mc) It is also a process of combining two or more colors together so that our project or product will be colorful.

a)

Front Post Single Crochet(Fpsc)

b)

Skip(Sk)

c)

Contrasting Color(Cc)

d)

Main color(Mc)

38.

the stitch is worked into the row below, around the post of the lower stitch.

This creates a subtly textured fabric.

a)

Space/s(Sp/s)

b)

Skip(Sk)

c)

Single Crochet(Sc)

d)

Front Post Single Crochet(Fpsc)

39.

areas in a row of stitches where the needle and thread have not made a complete and consistent stitch pattern, creating a bald spot

a)

Single Crochet(Sc)

b)

Stitch/es(St/s)

c)

Space/s(Sp/s)

d)

Skip(Sk)

40.

Any one of a number of stitches made by pulling a loop of yarn through another loop with a crochet needle.

a)

Stitch/es(St/s)

b)

Single Crochet(Sc)

c)

Right Side(Rs)

d)

Space/s(Sp/s)

41.

means you will crochet into the space between stitches. Ch-sp means, when crocheting a chain, you will skip a stitch and work into the next.

a)

Space/s(Sp/s)

b)

Stitch/es(St/s)

c)

Right Side(Rs)

d)

Skip(Sk)

42.

Any one of a number of stitches made by pulling a loop of yarn through another loop with a crochet needle.

a)

Treble Crochet(Tr)

b)

Space/s(Sp/s)

c)

Stitch/es(St/s)

d)

Wrong Side(Ws)

43.

The part of the stitch that is facing you as you work is called the

a)

Back Post Single Crochet(Bpsc)

b)

Wrong Side(Ws)

c)

Right Side(Rs)

d)

Slip Stitch

44.

The part of the stitch that is not facing you as you work is called the

a)

Right Side(Rs)

b)

Wrong Side(Ws)

c)

Slip Stitch

d)

Treble Crochet(Tr)

45.

(sometimes called triple crochet) is taller than a double crochet and is made by working two yarn overs at the start of the stitch, instead of one yarn over as for double crochet.

a)

Back Post Single Crochet(Bpsc)

b)

Treble Crochet(Tr)

c)

Slip

d)

Front Post Double Crochet(Fpdc)

46.

A covert stitch that used sew-folded edges (like hems) that is created by

alternately running the needle within the fold and picking up 

A few threads from the fabric's body.

a)

Front Post Double Crochet(Fpdc)

b)

Treble Crochet(Tr)

c)

Back Post Single Crochet(Bpsc)

d)

Slip Stitch

47.

As order to vary the texture of a piece, front and back post single crochet

a)

Front Post Single Crochet(Fpsc)

b)

Front Post Double Crochet(Fpdc)

c)

Back Post Double Crochet(Bpdc)

d)

Back Post Single Crochet(Bpsc)

48.

It is created by working into the line below, which causes the fabric to draw up and out on the right side and create a bump. It's a method utilized in basketweaves, cables, ribbing, and mimicked stitches.

a)

Back Post Double Crochet(Bpdc)

b)

Stitch/es(St/s)

c)

Back Post Single Crochet(Bpsc)

d)

Front Post Double Crochet(Fpdc)

49.

It is created by working into the line below, which causes the fabric to draw up and out on the right side and create a bum p. It's a method utilized in basketweaves, cables, ribbing, and mimicked stitches.

a)

Slip Stitch

b)

Front Post Double Crochet(Fpdc)

c)

Back Post Double Crochet(Bpdc)

d)

Wrong Side(Ws)