1.

Which of the following might cause a project to fail?

a)

Poor planning

b)

Poor logo design

c)

Poor quality coffee

d)

Poor dress sense

2.

Poor communications are what to a project?

a)

A benefit

b)

A bonus

c)

A risk

d)

An advantage

3.

To help manage time a project team could create a what?

a)

Schedule

b)

Memo

c)

Minutes

d)

Report

4.

In this phase where you develop the strategy, implementation and risk management.

a)

Concept

b)

Initiation or planning

c)

Closeout

5.

The project scope focuses on

a)

"What" of the project

b)

"Which" of the project

c)

"How" of the project

d)

"When" of the project

6.

A MILESTONE is...

a)

A key date in the project when certain tasks need to be finished

b)

The final date by which everything needs to be complete

c)

The point in time when you started the project

d)

Something used to grind flour

7.

How can you obtain information from a client? [tick all that apply]

a)

A discussion with the client

b)

A written project brief

c)

Analysing a script

d)

A project specification

8.

Role of contractor are ;


i) To built and complete the construction based on contract.

ii) To comply with the local authorities regulation.

iii) Own and finance the project.

iv) to bear all the carried out and completed work at the site.

a)

i, ii and iii

b)

i, ii and iv

c)

i and iv

d)

iii and iv

9.

The process where project deliverables and project work are subdivided into smaller and smaller pieces is called __________________.

a)

collect requirements

b)

define scope

c)

plan scope management

d)

create WBS

10.

A Gantt chart represents project schedule information in an easy-to-read, graphical format. Which of these is not a component of this type of Gantt chart?

a)

activities

b)

budget data

c)

start and end dates

d)

durations

11.

Network Planning Method are useful for

a)

Small and simple project

b)

high capacity and large project

c)

Complex and small project

d)

Complex and large project

12.

List all THREE Project Scheduling Techniques

4 lines
13.

Elements of Project Management (TICK ALL POSSIBLE ANSWERS)

a)

Project teams

b)

Project Manager (PM)

c)

PRESIDENT

d)

Project management systems

14.

Four Steps to Network Planning Method (TICK ALL POSSIBLE ANSWER)

a)

describing

b)

estimating

c)

diagramming

d)

monitoring

e)

controlling

15.

Advantages and disadvantages of Gantt Chart

4 lines