wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Emergency Preparedness & Response

Total questions: 20

Worksheet time: 6mins

Name
Class
Date
1.

When do we activate Emergency Management Plan (EMP)?

a)

When the incident is declared as “Green” coded

b)

When the incident is declared as "Amber" coded

c)

When the incident is declared as "Red" coded

2.

What is the ISO Standard for Business Continuity Management System?

a)

ISO 23301

b)

ISO 27001

c)

ISO 22301

d)

ISO 9001

3.

Who is involve in Incident Management Plan (IMP)?

a)

Chief Operating Officer, Head of ERT

b)

Floor Manager

c)

Head of Division, Security Officer, Fire Fighter, First Aider & Business Continuity Coordinator

d)

Emergency Response Team (ERT)

e)

BCM Secretariat, Crisis Management Team (CMT), Recovery Team (RT).

4.

An event, which endangers or threatens to endanger life, property or infrastructure, and which requires a significant and coordinated urgent response is the definition of?

a)

Incident

b)

Emergency

c)

Crisis

d)

Disaster

5.

During code "Red", who will activate the call tree?

a)

Head of ERT

b)

Head of Division

c)

COO

d)

Floor Manager

6.

Who is the first person should you call after you see an incident?

a)

Head of ERT

b)

Head of Division

c)

COO

d)

Floor Manager

7.

The list below are Pos Digicert First Aiders, except

a)

Muhamad Hafidz Othman

b)

Nor Idayu Abd Rahim

c)

Nur Elyanie Md Taib

d)

Nurul Farhan Ab Aziz

8.

Emergency Preparedness and Response is important because a/an ​​ (a)   will escalate to a/an ​ (b)   if not being handled properly.

Choose from the below words
emergency
crisis
incident
event
9.

Event that might be, or could lead to, an operational interruption, loss, emergency or crisis

a)

Consequences

b)

Hazard

c)

Incident

d)

Disaster

10.

Define Maximum Tolerable Period of Disruption (MTPD)

a)

Maximum the data lost within a period of time before significant harms occur to the company from the disruptive event to the last back-up

b)

The maximum time the company can survive without critical business functions before its impact is deemed unacceptable

c)

Period of time that the critical business functions can be down without causing any significant damage to the company

d)

Maximum tolerable period of time for system or data of operation are verified and restored

11.

Strategic and tactical capability of the organization to plan for and respond to incidents and business disruptions in order to continue business operations at an acceptable predefined level

a)

Business Continuity

b)

Strategic Planning

c)

Risk Management

d)

Live Drill

12.

If you are currently in Level 3 and see an incident, what is the first thing you need to do?

a)

Inform Head of ERT

b)

Inform Level 3 Security Officer

c)

Try to solve the incident by yourself

d)

Inform Level 3 Floor Manager

13.

1. Assist Floor Manager during evacuation in an emergency and guide staff to the Assembly area

2. Do roll-call/ headcount to ensure all staff are accounted for.

3. As a point of contact for Bomba

Who is he/she?

a)

First Aider

b)

Security Officer

c)

Fire Fighter

d)

Floor Manager

14.

During an Emergency that require evacuation, where are Pos Digicert Assembly Areas?

a)

In front of Block 8, Star Sentral & LHDN assembly area

b)

In front of Block 8, Star Sentral & Cyberjaya Park and Ride

c)

Cyberjaya Park & Ride & Level 3A garden area

d)

LHDN assembly area & Level 3A garden area

15.

Based on the image, this event is under category Crisis

a)

True

b)

False

16.

When responding to the incident of Level 1, what is the actions for Head of ERT?

a)

Not required to inform the Head of ERT

b)

Head of ERT will be informed but not convened

c)

Head of ERT will activates Emergency Management Plan

17.

In line with Pos Digicert requirements for BCM commit rule, effort should be placed on the which priorities

a)

Safety of people

b)

Security of premises

c)

Internal and external communication

d)

All of the Above

18.

During Emergency, when should Head of ERT calls external parties such as Bomba and Police?

a)

Amber Level 1

b)

Amber Level 2

c)

Red Level 1

d)

Red Level 2

19.

What is BCM?

a)

Business Compliance Management

b)

Business Continuity Manager

c)

Business Contingency Management

d)

Business Continuity Management

20.

What are the objectives of Call Tree exercise?

i. To ensure that all staff are well-informed in a structured and prompt manner in the event of disaster.

ii. To ensure that the overall call time taken is within the stipulated time.

iii. To convey all the instructions of business continuity plan to all staff.

a)

i and ii

b)

ii and iii

c)

i and iii

d)

All of the above