SPP Doc. 202 Regular Design Service

Total questions: 25

Worksheet time: 25mins

Name
Class
Date
1.

Scope of regular design service were the Architect consults with owner to ascertain the conceptual framework and related requirements.

The Architect also reviews and refines space requirements and translates them into an architectural program.

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

2.

Scope of regular design service were the Architect evaluates program, schedule, budget, project site and proposes methods of project deliveries.

Prepares initial line drawings representing design studies leading to a recommended solution, including a general description of the project.

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

3.

Scope of regular design service were the Architect creates documents consisting of plans, elevations, sections and other drawings.

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

4.

Scope of regular design service were the Architect gives a complete contract documents for the architectural, structural, electrical, plumbing, sanitary mechanical etc.

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

5.

How many sets of contract documents does the Architect needs to give on a project in total?

a)

6 Sets

b)

5 Sets

c)

1 Sets

d)

7 Sets

6.

Manner of providing services with a single contract between the Architect and owner, and sub-consultancy contracts between Architect and other professionals working with the Architect.

a)

Percentage of Project Construction Cost

b)

Detailed Architectural and Engineering Design Services

c)

Detailed Architectural Design Services

d)

Unit Cost Method

7.

Manner of providing services with the Architect and the engineering and allied professionals executing separate contracts with the owner.

a)

Percentage of Project Construction Cost

b)

Detailed Architectural and Engineering Design Services

c)

Detailed Architectural Design Services

d)

Unit Cost Method

8.

Which is not a method of compensation for a regular design service of an Architect?

a)

Time Based Method

b)

Percentage-based fee

c)

Lump Sum or Fixed Fee

d)

All of them are included

9.

Which is not classified as a group 1 building?

a)

Public Markets

b)

Service Garages

c)

Manufacturing/Industrial Plants

d)

Publishing Plants

10.

Which is not classified as a group 2 building?

a)

Park

b)

Hotels

c)

Private Clubs

d)

Supermarket

11.

Which is not classified as a group 3 building?

a)

Mortuaries

b)

Breweries

c)

Telecommunication Buildings

d)

Bowlodromes

12.

Recommended professional fee for DAEDS for P2m PCC of a bakery building

a)

Cannot be determined because it depends on how complex the design is

b)

P100,000

c)

P120,000

d)

P80,000

13.

Recommended professional fee percentage for a group 2 building? (DAEDS)

a)

3% of PCC

b)

7% of PCC

c)

5% of PCC

d)

6% of PCC

14.

Recommended professional fee percentage for a group 4 building? (DADS)

a)

12% of PCC

b)

7% of PCC

c)

10% of PCC

d)

6% of PCC

15.

What is group 5 classification of building in regular design service?

a)

Repetitive Construction

b)

Single Family Dwellings

c)

Monumental Buildings

d)

High Complex Buildings

16.

What is the RPF when the plan/design and related contract documents are re-used for the construction of similar buildings without amending the drawing and specifications?

a)

* 1st Building - 100% of RPF

* 2nd Building - 75% of RPF

* 3rd Building - 60% of RPF

* 4th & above Building - 55% of RPF

b)

* 1st Building - 100% of RPF

* 2nd Building - 50% of RPF

* 3rd Building - 40% of RPF

* 4th & above Building - 30% of RPF

c)

* 1st Building - 100% of RPF

* 2nd Building - 95% of RPF

* 3rd Building - 50% of RPF

* 4th & above Building - 40% of RPF

d)

* 1st Building - 100% of RPF

* 2nd Building - 75% of RPF

* 3rd Building - 50% of RPF

* 4th & above Building - 25% of RPF

17.

Recommended RPF for projects involving extensive details such as designs for built-in components or elements, built-in equipment, special fittings, architectural interiors, SDP etc.

a)

7.5% of PCC

b)

12% of PCC

c)

15% of PCC

d)

10% of PCC

18.

What is group 9 for regular design service of an Architect?

a)

Extensive Detailing

b)

Repetitive Construction

c)

Renovations

d)

Advice/Consultation/Witness

19.

Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession, the chargable RPF shall not be less than _____ per hour

a)

P 2,500

b)

P 1,000

c)

P 5,000

d)

P500

20.

Where the Architect is rendering services as an expert witness, the Architect's fee shall not be less than _____ per appearance regardless as to whether the scheduled hearing took place of not.

a)

P 2,500

b)

P 1,000

c)

P 5,000

d)

P500

21.

Means cost of the completed building to the owner, including the structure, plumbing/sanitary and electrical fixtures, mechanical equipment elevators, escalators etc. indicated in the plans, designs, drawings and specifications prepared by the Architect and his consultants.

a)

Project Total Cost

b)

Project Construction Cost

c)

Project development Cost

d)

Professional Fee

22.

Shall include cost of the construction as well as all professional fees, permits, clearances and utilities and cost of acquiring the project site/lot etc.

a)

Project Total Cost

b)

Project Construction Cost

c)

Project development Cost

d)

Professional Fees

23.

Which is not a group 4 classification in regular design service?

a)

Single detached House

b)

Row House

c)

Duplex

d)

Dormitory

24.

Which of the following is included in group 5 classification in regular design service?

a)

Fair Building

b)

Mortuary

c)

Marina

d)

Gymnasium

25.

What phase of regular design service is when the Architect prepares change order, gathers and turns over to the owner written guarantees required of the contractor and sub contractors

a)

In your Face

b)

Bidding and Negotiation Phase

c)

Construction Phase

d)

Design Development Phase