1.

The contractor has the right to terminate the contract or suspend work if there is suspension of work for ___ days through no fault of the contractor.

a)

90 days

b)

30 days

c)

60 days

d)

120 days

2.

You had a residential project for a Client. After the construction, you found out that the Client used your design for another project without your consent. What will you do?

a)

Inform the Mayor

b)

File a case with the PRC

c)

File a case in court

d)

Forgive and forget.

3.

This area of practice recommends the systematic process of ensuring that a building/structure's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.

a)

Building Systems Design

b)

Building Testing and Commissioning

c)

Facilities Maintenance Support

d)

Security Evaluation and Planning

4.

A roman house with a central patio.

a)

Atrium House

b)

Thalamus

c)

Domus

d)

Villa

5.

That part of the building foundation which forms the permanent

retaining wall of the structure below grade is a

a)

foundation course

b)

grade beam

c)

foundation wall

6.

A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as

a)

post and beam

b)

western framing

c)

space framing

d)

balloon framing

7.

Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine is

a)

tryolean finish

b)

trowel finish

c)

broom stripped finish

8.

The Filipino term for horizontal stud is

a)

Pabalagbag

b)

Tahilan

c)

pilareta

9.

The Filipino term for riser

a)

Muldura

b)

takip silipan

c)

planehuelda

10.

The Filipino term for collar plate is

a)

Guililan

b)

Hardinera

c)

sinturon

11.

The amount to be paid for every delay in the contract time

a)

penalty

b)

Liquidated Damages

c)

fine

d)

Surcharge

12.

The ____ ethically can order a “change” during construction anytime

a)

Architect

b)

Consultant

c)

Contractor

d)

Owner

13.

PD ____ institutionalized the profession of Environmental Planning

a)

PD 3008

b)

PD 1308

c)

PD 1380

d)

PD 1300

14.

An act of God such as earthquakes, typhoons, etc. which human prudence cannot foresee or prevent

a)

Miracle

b)

Natural Phenomenon

c)

All of the above

d)

Force Majeure

15.

PD 223 specifies the function of the Board of Architecture to Supervise & ____

a)

Regulate

b)

Monitor

c)

Secure

d)

Legalize

16.

A pit for the reception or detention for sewage

a)

Septic Vault

b)

Privy

c)

Catch Basin

d)

Cesspool

17.

An outhouse or structure used for the deposition of excrement

a)

Septic Vault

b)

Privy

c)

Catch Basin

d)

Cesspool

18.

A stream of high-velocity temperature-controlled air which is directed downward, across an opening

a)

Air Curtain

b)

Air Diffuser

c)

Air Handling Unit

d)

Air Chamber

19.

An admixture which is used to speed up the initial set of concrete

a)

Hardeners

b)

Dispersal agents

c)

Retarders

d)

Accelerators

20.

Is a traditional building material, easily worked, has durability and beauty has great ability to absorb shocks from sudden load. It is rust and corrosion proof.

a)

Wood

b)

Plastic

c)

Rubber

d)

Glass

21.

A method of drying limber where it is strip-piled at a slope on a solid foundation. This allows air to circulate around every place while the sloping allows water to run off quickly

a)

Pressure drying

b)

Kiln Drying

c)

Piled Drying

d)

Air-drying

22.

It is made by bonding together thin layers of wood in a way that the grain of each layer is at right angles to the grain of each adjacent layer.

a)

Building boards

b)

Plywood

c)

Hardboard

d)

Corkboard

23.

In masonry, a joint or interstice between stones, to be filled with mortar or cement.

a)

Datum

b)

Plywood

c)

Expansion joint

d)

Joint Filler

24.

A plane extended in a direction other than its intrinsic direction. Conceptually it has three dimensions: length, width and depth.

a)

Surface

b)

Volume

c)

Shape

d)

Form

25.

Defined geometrically as a line that is divided such that the lesser portion is to the greater as the greater is to be the whole.

a)

Golden section

b)

Proportion

c)

Anthropometrics

d)

Form

26.

Is the attribute that most clearly distinguishes a form from its environment

a)

Texture

b)

Form

c)

Color

d)

Shape

27.

Vaulting compartment into six parts known as

a)

terpatite

b)

sixtite

c)

tripartite

d)

tripartite

28.

The most important of the distinctive characteristics of mature Spanish Romanesque architecture

a)

church bldgs

b)

Christianity

c)

diaconicon

d)

diaconicon

29.

These constituted the barriers to migration since the earliest periods of civilization (mountains; deserts; seas…)

a)

Climatic

b)

Topography

c)

Geology

d)

Geography

30.

Primary shapes that can be extended or rotated to generate volume whose forms are distinct, regular and easily recognizable

a)

Irregular forms

b)

Additive transformation

c)

Platonic solids

d)

Subtractive forms