NEW
Font size
WorksheetsSAMPLE 1 ALE 2018
Total questions: 25
Worksheet time: 2mins
Who signs and seals as-built plans which are required for obtaining a certificate of occupancy?
Contractor
Civil Engineer
Architect
Structural Engineer
For a bldg permit to be legitimate it should be
Sealed
Signed
Notarized
Checked
What is the material for ceiling that absorbs sound?
Acoustical Ceiling
Gypsum board
Fiber board
Ficem board
Part of building foot print
open terrace
carport
paved patio
garden
What kind of concrete finish is this?
Stucco finish
Broom Finish
Brush Finish
Anay Finish
A basis for direct selection of architects
invitation
interview
verification
recommendation
Who is the Architect with the saying “Form Follows Function”?
Louis Sullivan
Louis Khan
Robert Venturi
Le Corbusier
It is "an enclosed overhanging balcony"; "a gallery which protects the rooms from the heat of the sun"
Ventanilla
Volada
Valance
Ventana
Vernacular term for cabinet hinge
Palitada
Suban
Espolon
Lastilyas
Where should you put the heat roofing material?
Under the rafter
Over the rafter
On the ceiling
Not applicable
If the airconditioning equipment is to be located on upper floors, what should be the best recommendation to reduce sound transmission?
Use concrete pad
Use vibration isolators
Use rubber matting
Use carpet
What is not a grounds for suspension of work by the Contractor?
If the Architect should fail to act upon the Request for Payment within fifteen days after it is presented in accordance with the General Conditions of the Contract
If the Owner should fail to pay the Contractor any sum within 30 days after its award by arbitration
If an order of any court or other public authority caused the work to be stopped or suspended for a period of 90 days through no act or fault of the contractor or his employees
If the Owner should fail to act upon the Request for Payment or Certificate of Payment within fourteen days after its certification by the Architect
Who is the Architect with the saying “Function influence but does not dictate form”?
Eero Saarinen
Frank Lloyd Wright
Ludwig Meis Van De Rohe
Eliel Saarinen
Who is the Architect with the saying “Less is more”?
Eero Saarinen
Frank Lloyd Wright
Ludwig Meis Van De Rohe
Eliel Saarinen
Who is the Architect with the saying “Cube within a cube” and “The house is a machine for living in”?
Le Corbusier
Frank Lloyd Wright
Robert Venturi
Louis Khan
Designer of the UAP Headquarters
L. Locsin
T. Vasquez
R. Sac
P. Antonio
Which of the following is a good lighting device for the waiting area of a Bus Terminal if it has an open ceiling?
Industrial high bays
Pendant incandescent
Surface mounted troffer lighting
Suspended CFL with housing
Wallpaper is most useful to a designer in creating
Texture
Scale
Color
Line
Solve for the floor area and the CHB used:
25mtr X 30mtr
750sq.m & 9,750 pcs
750sq.m & 58 pcs
55sq.m & 715 pcs
None of the above
Identify the Kind of slab used
Square slab
Boxed Slab
Waffle Slab
Uniformed slab
Identify the type of construction used
Clear span construction
Space frame construction
Steel lightweight construction
Geodesic steel construction
Identify the type of construction used
Geodesic steel construction
Space frame construction
Clear span construction
Steel lightweight construction
Beam that project beyond one or both its support?
Cantilever beam
Overhanging beam
Continues beam
Intermediate beam
You decided to have architectural firm a sole proprietorship, to what commission you should registered?
Mayor's office
DTI
SEC
GPPB
A sole proprietorship, a partnership, a corporation or an association registered with proper government agencies, especially the DTI, SEC and the PRC
Professional Firm
Architectural Corporation
Architectural Firm
Allied Technical
