wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Domestic Hot Water 6035-02 | Part 1

Total questions: 36

Worksheet time: 18mins

Name
Class
Date
1.

The difference between 'direct' and 'indirect' hot water systems is:

a)

Direct system comes straight from the CWSC

b)

Indirect systems only feeds the kitchen sink

c)

Direct system does not have a heat exchanger coil within the cylinder

d)

Indirect systems have no need for an F&E cistern

2.

Define 'back siphonage'.

a)

When the pressure at the supply end of the water main drops suddenly causing a vacuum

b)

When the mains water is shut off due to repairs causing a backwards flow

c)

When the pressure drops within the cylinder causing a circulation within one pipe

d)

When the pressure is higher from the cold supply than the hot supply

3.

What does WRAS stand for?

a)

Water Regulations Application Service

b)

Water Regulations Advisory Scheme

c)

Water Regulations Arbitration Site

d)

Water Regulations Advisory Service

4.

What supplies the primary circuit with water?

a)

Feed & Expansion cistern

b)

Mains water

c)

Cold water storage cistern

d)

None of the above

5.

If the coil in the cylinder fails, what course of action should be taken?

a)

Replace the coil

b)

Replace the boiler

c)

Replace the cylinder

d)

Replace the F&E cistern

6.

What is another term for "one-pipe circulation"?

a)

Parasitic circulation

b)

Anti-circulation

c)

Backwards circulation

d)

Primatic circulation

7.

If the pipework sizing is too small it will?

a)

Effect pressure

b)

Effect flow rates

c)

Improve flow rates

d)

None of the above

8.

What is the purpose of this proprietary fitting?

a)

To allow the connection between copper pipe and lead pipe

b)

To allows the connection between LCS pipe and copper pipe

c)

To allows the connection between lead pipe and lead pipe

d)

To allow the connection between waste pipe and lead pipe

9.

Which of the following could be installed to prevent water hammer?

a)

Double check valve

b)

Lever arm service valve

c)

Equilibrium valve

d)

Portsmouth valve

10.

What is the component shown?

a)

Twin impellor pump

b)

Base heat exchanger

c)

Negative head pump

d)

Thermostatic pump valve

11.

Before a soundness test can begin, what should be visually checked?

a)

Soldered joints made

b)

Clips are in place

c)

Compression joints tightened

d)

All of the above

12.

What must all immersion heaters installed today include? (select 2)

a)

Cut-off device

b)

Reset button

c)

Temperature reader

d)

A pump

13.

What is the need of a primary flow and return on an indirect system?

a)

To circulate unused hot water to the outlets

b)

To supply water from the CWSC to the cylinder and back again

c)

To help water flow with the force of gravity

d)

To supple a source of heat to the hot water cylinder

14.

STATEMENT: According to BS6700, the capacity of the CWSC should be at least the same capacity of the hot water cylinder it is feeding. 

a)

True

b)

False

15.

What is known as 'negative head'?

a)

Operates under natural flow of water

b)

Operates under a charge

16.

What would happen if debris was to build-up within a valve?

a)

Pass water when closed

b)

Break up limescale

c)

Easier to tighten/loosen

d)

None of the above

17.

What would the height of the open vent over the CWSC be if the systems height is 7m? (150mm + 40mm per metre of system height)

a)

390mm

b)

190mm

c)

430mm

d)

280mm

18.

What air gap is used on a kitchen sink to separate the spill over level of the appliance and the outlet point of the tap?

a)

AUK3

b)

AUK2

c)

AUK1

d)

AG

19.

Which of the following is NOT an indication of a cylinder stat failure?

a)

Steam in loft area

b)

Frozen pipework

c)

Open vent discharging

d)

Dangerously hot water temperatures

20.

What is the allowance for 'pressure drop' during a rigid pipe soundness test upon inspection?

a)

No drop allowed

b)

Maximum of 1 bar

c)

Minimum of 0.2 bar

d)

Test bucket should be on 0.0 bar on inspection

21.

A system only has one CWSC in the loft area and fills both the primary and secondary waters through the same pipe is known as?

a)

Single feed system

b)

Double feed system

c)

Primary fed system

d)

F&E feed system

22.

What temperature does the boiler heat the primary water to?

a)

55°C

b)

65°C

c)

75°C

d)

85°C

23.

What valve should be installed on the cold feed pipe?

a)

Service valve

b)

Fullway gate valve

c)

Stop valve

d)

Low pressure stop valve

24.

What is the total time of test for plastic pipework test A?

a)

45 minutes

b)

60 minutes/1 hour

c)

105 minutes/1 hour 45 minutes

d)

120 minutes/2 hours

25.

What would happen if the cylinder stat was to fail to close?

a)

Temperature of water continues to increase

b)

Back-up cylinder stat would close

c)

The system would be without hot water

d)

Loss in pressure

26.

What type of isolation does an instantaneous electric shower have?

a)

Double capacitor rod

b)

Single pole switch

c)

Optocoupler

d)

Double pole switch

27.

What building regulation covers hot water?

a)

Part B

b)

Part h

c)

Part V

d)

Part G

28.

What does F&E stands for?

a)

Flow & evaporation

b)

Force & elevation

c)

Feed & expansion

d)

Front & exit

29.

Which of the following is NOT a type of hot water cylinder?

a)

Coiled

b)

Non-coiled

c)

Chambered

d)

Half-coiled

30.

What wattage is an immersion heater rated at?

a)

2kW

b)

2.2kW

c)

2.8kW

d)

3kW

31.

Building regulations Part L require water to take no longer than how long to heat up?

a)

10 minutes

b)

18 minutes

c)

25 minutes

d)

30 minutes

32.

Which of the following is NOT considered a disadvantage of having a direct system?

a)

Risk of rusty water

b)

Risk of scale build-up

c)

Lack of temperature control

d)

Rapid heat-up time

33.

What is the purpose of having a open vent on the system?

a)

Allow air in and out of the system

b)

Allow the plumber to see the water levels

c)

Prevents expansion and contraction

d)

Prevents the system overheating

34.

Which cylinder has no heat exchanger (coil) inside it?

a)

Direct

b)

Indirect

c)

Multi-coiled

d)

Single coiled

35.

After a new system or section of pipework is installed, what needs to be removed from the pipes?

a)

Chlorine

b)

Debris

c)

Limescale

d)

Lead

36.

What is this valve?

a)

Blending valve

b)

3-port zone valve

c)

Motorised gate valve

d)

Adjustable chrome tee