1.
1. There are three (3) importance of Critical Equipment Strategy in the power plant. Please choose the incorrect answer.
a)
To maximize availability and reliability
b)
To minimize total maintenance cost
c)
To increase energy efficiency
d)
To create robustness of the equipment and reduce risk of failure
2.
2. What is AMPG?
a)
Asset Management Program Guideline
b)
Asset Major Planned Guideline
c)
Asset Maintenance Philosophy Guideline
d)
Asset Management Philosophy Guideline
3.
3. The system prioritization assessment shall be carried out for each system before proceed with the Critical Equipment Assessment. What are the components of the System Prioritization?
a)
Consequence (X) Probability
b)
Criticality (X) Consequence
c)
Probability (X) Criticality
d)
Effect (X) Probability
4.

4. How to improve detectability towards the equipment failure?

i. Time / Usage based monitoring

ii. Standardized repair procedure

iii. Condition based monitoring

iv. Regular inspection

a)

i, ii and iv

b)

i, ii & iii

c)

i, iii & iv

d)

ii, iii and iv

5.
5. What is the process involved in Asset Lifecycle Management Process? Please choose the correct step.
a)
Acquire Asset -Operation & Maintenance
b)
Acquire Asset - Operation & Maintenance - Replace/Dispose
c)
Operation & Maintenance - Replace/Dispose
d)
Operation & Maintenance - Acquire Asset - Replace/Dispose
6.

6. Below are the preventive maintenance strategies EXCEPT

a)
Condition-based maintenance
b)
Usage-based maintenance
c)
Breakdown maintenance
d)
Time-based maintenance
7.
7. What type of maintenance strategy approach is appropriate for a short repair or changes in time?
a)
Breakdown maintenance
b)
Time-based maintenance
c)
Condition-based maintenance
d)
Usage-based maintenance
8.

8. For Usage Based Maintenance (UBM) these are the prerequisites to run this strategy except

a)

MTBF information

b)

Regular inspection

c)

Real usage information

d)

Advanced planning system for maintenance action when near the change time

9.

9. What are the advantages of the Condition Based Maintenance (CBM)?

a)

High usage of real life-time

b)

Least unexpected breakdown

c)

Planning very easy (spare part,repair time, etc.)

d)

Minimizing downtime

10.

10. What are disadvantages of Break Down Maintenance (BDM)?

a)

Not predictable

b)

Special equipment for diagnosis

c)

Spare part must be available all the time

d)

Early failure faults and symptoms detection