wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Data Down Cases

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Power Failure means:

a)

Power led not existed

b)

Power led not working

c)

Power led not working or working with red color

2.

If CST has Power Failure which of the following you will do with CST:

a)

Check with another CPE and not necessary it's original adapter

b)

Change the power led in CPE

c)

Check with another CPE with it's original adapter

3.

If CST called us and informed that he has cut cable you will follow normal troubleshoot in ticket maker:

a)

TRUE

b)

FALSE

4.

If customer's line in ASSIA no provisioned that means:

a)

CST is not supported by ASSIA

b)

CST supported by ASSIA

c)

ASSIA is down

5.

If CST has Data and Voice Down case after connect from main wall outlet problem solved you will:

a)

Create TT for internal wiring

b)

Inform CST with solvent

c)

Inform CST to change splitter

6.

If we run SELT and customer's line connected with exchange you will measure distance with:

a)

10 meters

b)

150 meters

c)

50 meters

7.

If power led is down and CST uses original adapter next step will be:

a)

Escalate to IU

b)

Try in another wall-plug

c)

Direct CST to CSO

8.

If CST has Data Down case and when you checked SELT you found that CST is not supported by ASSIA you will:

a)

Escalate to IU 

b)

Inform CST to call us again as system down

c)

Check connection type

9.

SLA for internal wiring TT:

a)

2 hours

b)

1 day

c)

1 hour

10.

If CPE restarted automatically and Power LED turned off while CPE restarted you will consider it as :

a)

Power Failure

b)

Physical Instability

c)

No problem