PROF PRAC 1

Total questions: 30

Worksheet time: 17mins

Name
Class
Date
1.

Which of the following does NOT belong to composition of a Temporary Facility?

a)

Signage

b)

Warehouse

c)

Bankhouse

d)

Worker's Canteen

2.

Refers to the number of worker, lesser the worker when construction is almost finished.

a)

Quantity

b)

Quality

c)

Queue

d)

Quail

3.

The architect as a project manager is compensated what percentage of the project cost?

a)

2%-5%

b)

1%-1.5%

c)

2.5%

d)

7%

4.

Prepares the Shop drawings

a)

Architect

b)

Engineer

c)

Contractor

d)

Batman

5.

Price given by the contractor, sub-contractor, supplier and the like.

a)

Specifications

b)

Bid documents

c)

Quotations

d)

NOTA

6.

An outline specification enumerating the type of materials to be used?

a)

Specifications

b)

Schedule of materials and finishes

c)

Construction drawings

d)

Pre-feasibility studies

7.

______ is a right enforceable against specific property to secure payment of obligation.

a)

Ownership

b)

Liens

c)

Decree

d)

Payment

8.

The _____ are printed documents stipulating the procedural & administrative aspects of the contract

a)

The Specifications

b)

The Memorandum of Agreement

c)

The General Conditions

d)

The contract

9.

Architects employed by the government are not allowed to engage in the _____ practice of architecture.

a)

Regular

b)

Private

c)

Traditional

d)

Mandated

10.

Architect Peter Parker gave Mr. Tony Stark (contractor) his instructions and explained the construction drawings, hence, doing his duty as per Code of Ethics.

Some time later, there are changes of materials due to the availability of stocks in the market. Mr. Juan didn't see any specified material replacement.

The material to be installed will:

a)

only be Stark's discretion since he was assigned for that job

b)

only after the approval Architect Parker

c)

with the Owner's consent only

d)

only if the cost is comparatively lower

11.

It includes labor, materials, & other equipment necessary to construction.

a)

ESTIMATE

b)

WORK

c)

BIDDING

d)

PROPOSAL

12.

Means furnish and install

a)

Install

b)

Provide

c)

Work

d)

Furnish

13.

98% of construction completion is ____ completion?

a)

Full

b)

Substantial

c)

Near

d)

Partial

14.

Normally, an Architect is paid of percentage of construction cost method, another method of compensation is:

a)

SALARY

b)

WAGES

c)

NOTA

15.

In which phase are diagrammatic layouts of construction systems prepared?

a)

Pre-design

b)

Design development

c)

Architectural Programming

d)

Space Planning

16.

It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.?

a)

Pre-design

b)

Design development

c)

Architectural Programming

d)

Space Planning

17.

Maximum imprisonment in violation of IRR of RA 9266

a)

5 YEARS

b)

10 YEARS

c)

6 MONTHS

d)

6 YEARS

e)

RECLUSION PERPETUA

18.

What is the fine in every day delay in construction?

a)

Max of 10% contact price

b)

1/10 of 1% of the contact price per day of delay

c)

1/10 of the contact price per day of delay

d)

1% of the contact price per day of delay

19.

A newly passer architect and registered with board shall be _____ to become a member of the integrated and accredited professional organization of architects?

a)

Automatic

b)

Required

c)

Compulsary

d)

Obligated

20.

In a PERT CPM _____ is a starting node to two or more activities

a)

Concurrent node

b)

Merge node

c)

Simultaneous node

d)

Burst Node

21.

Which is not included in the Building Contract?

a)

Liquidated Damages

b)

Performance & Payment Bonds

c)

Cost Records

d)

Payments

e)

AOTA

22.

Wraps up the whole range of architectural services

a)

Design-build

b)

Post-Construction

c)

Comprehensive

d)

Pre-design

23.

The architect of a housing project was given Php 300,000.00 for the first unit he designed. How much will he receive for the 10th housing unit?

a)

Php 300,000

b)

Php 420,000

c)

Php 480,000

d)

Php 500,000

24.

It is the instructions that supplement or modify drawings, specs, & general conditions of the contracts

a)

Special Provisions

b)

Supplementary Specs

c)

Instruction to Bidders

d)

Written Notice

25.

Within how many months shall be the release of Retention from date if final payment?

a)

3 mos

b)

4 mos

c)

6 mos

d)

2 mos

26.

The value of extra work or change in construction plans by the owner

a)

25% of PCC

b)

Actual direct cost + 10% for profit, overhead and tax

c)

Actual direct cost + 2% for profit, overhead and tax

d)

Actual direct cost + 50% for profit, overhead and tax

27.

Can an architect be a contractor at the same time?

a)

YES

b)

NO

c)

DEPENDS ON THE GRAVITY OF THE EARTH

d)

TAYLOR SWIFT

28.

Project duration is computed _____ from the receipt date of the NTP

a)

Periodically

b)

Annually

c)

Immediately

29.

CPM stands for?

a)

Critical Path Method

b)

Cost Path Method

c)

Construction Pattern Method

30.

____ pays for the As-built plans of the project.

a)

Owner

b)

Contractor

c)

Architect

d)

Kara Mia