Which of the following does NOT belong to composition of a Temporary Facility?
Signage
Warehouse
Bankhouse
Worker's Canteen
Refers to the number of worker, lesser the worker when construction is almost finished.
Quantity
Quality
Queue
Quail
The architect as a project manager is compensated what percentage of the project cost?
2%-5%
1%-1.5%
2.5%
7%
Prepares the Shop drawings
Architect
Engineer
Contractor
Batman
Price given by the contractor, sub-contractor, supplier and the like.
Specifications
Bid documents
Quotations
NOTA
An outline specification enumerating the type of materials to be used?
Specifications
Schedule of materials and finishes
Construction drawings
Pre-feasibility studies
______ is a right enforceable against specific property to secure payment of obligation.
Ownership
Liens
Decree
Payment
The _____ are printed documents stipulating the procedural & administrative aspects of the contract
The Specifications
The Memorandum of Agreement
The General Conditions
The contract
Architects employed by the government are not allowed to engage in the _____ practice of architecture.
Regular
Private
Traditional
Mandated
Architect Peter Parker gave Mr. Tony Stark (contractor) his instructions and explained the construction drawings, hence, doing his duty as per Code of Ethics.
Some time later, there are changes of materials due to the availability of stocks in the market. Mr. Juan didn't see any specified material replacement.
The material to be installed will:
only be Stark's discretion since he was assigned for that job
only after the approval Architect Parker
with the Owner's consent only
only if the cost is comparatively lower
It includes labor, materials, & other equipment necessary to construction.
ESTIMATE
WORK
BIDDING
PROPOSAL
Means furnish and install
Install
Provide
Work
Furnish
98% of construction completion is ____ completion?
Full
Substantial
Near
Partial
Normally, an Architect is paid of percentage of construction cost method, another method of compensation is:
SALARY
WAGES
NOTA
In which phase are diagrammatic layouts of construction systems prepared?
Pre-design
Design development
Architectural Programming
Space Planning
It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc.?
Pre-design
Design development
Architectural Programming
Space Planning
Maximum imprisonment in violation of IRR of RA 9266
5 YEARS
10 YEARS
6 MONTHS
6 YEARS
RECLUSION PERPETUA
What is the fine in every day delay in construction?
Max of 10% contact price
1/10 of 1% of the contact price per day of delay
1/10 of the contact price per day of delay
1% of the contact price per day of delay
A newly passer architect and registered with board shall be _____ to become a member of the integrated and accredited professional organization of architects?
Automatic
Required
Compulsary
Obligated
In a PERT CPM _____ is a starting node to two or more activities
Concurrent node
Merge node
Simultaneous node
Burst Node
Which is not included in the Building Contract?
Liquidated Damages
Performance & Payment Bonds
Cost Records
Payments
AOTA
Wraps up the whole range of architectural services
Design-build
Post-Construction
Comprehensive
Pre-design
The architect of a housing project was given Php 300,000.00 for the first unit he designed. How much will he receive for the 10th housing unit?
Php 300,000
Php 420,000
Php 480,000
Php 500,000
It is the instructions that supplement or modify drawings, specs, & general conditions of the contracts
Special Provisions
Supplementary Specs
Instruction to Bidders
Written Notice
Within how many months shall be the release of Retention from date if final payment?
3 mos
4 mos
6 mos
2 mos
The value of extra work or change in construction plans by the owner
25% of PCC
Actual direct cost + 10% for profit, overhead and tax
Actual direct cost + 2% for profit, overhead and tax
Actual direct cost + 50% for profit, overhead and tax
Can an architect be a contractor at the same time?
YES
NO
DEPENDS ON THE GRAVITY OF THE EARTH
TAYLOR SWIFT
Project duration is computed _____ from the receipt date of the NTP
Periodically
Annually
Immediately
CPM stands for?
Critical Path Method
Cost Path Method
Construction Pattern Method
____ pays for the As-built plans of the project.