Floor Systems

Total questions: 27

Worksheet time: 14mins

Name
Class
Date
1.

For a building project, the types and quality of materials, methods of construction, and location of the

structure are included in the?

a)

foundation plan

b)

detail drawings

c)

section views

d)

specifications

2.

Which of the following would not be shown on a floor plan?

a)

Interior walls

b)

Stairways

c)

Footings

d)

Window locations

3.

Which of the following drawings show the location of floor openings for stairways?

a)

Foundation plan

b)

Floor plan

c)

Elevation drawing

d)

Plot plan

4.

When constructing wall panels for a platform-framed structure, the wall panels?

a)

are built in position

b)

are always placed using a crane

c)

are all framed before the first panel is raised

d)

are assembled on the subfloor

5.

After raising a wall panel for a platform frame, the panel should first be fastened to the?

a)

top plate

b)

foundation

c)

ceiling joist

d)

subfloor

6.

The type of construction where each floor of a structure is built as an individual unit is?

a)

braced framing

b)

balloon framing

c)

platform framing

d)

post-and-beam framing

7.

Sill plates are normally made from?

a)

1 × 4 lumber

b)

2 × 4 lumber

c)

2 × 8 lumber

d)

2 × 10 lumber

8.

Building codes require any components in contact with the ground, masonry, or concrete, such as sill plates,

to be?

a)

made from treated lumber

b)

coated with a fungicide

c)

placed on top of termite shields

d)

unseasoned lumber

9.

For a given size, the type of support with the most strength is the?

a)

built-up girder

b)

glulam girder

c)

solid lumber girder

d)

steel I-beam

10.

A rule of thumb for constructing girder pockets is that the pocket should be at least 1" wider than the girder

and the girder must have a bearing on the wall of at least?

a)

2"

b)

4"

c)

5"

d)

8"

11.

Which of the following is not an advantage of the metal web floor truss?

a)

They are more widely used than wood web trusses.

b)

They provide larger openings for HVAC ductwork.

c)

They can span greater distance for same truss depth.

d)

They are stronger than comparable lengths of lumber.

12.

Before starting to install sill plates?

a)

apply a layer of insulation

b)

check the foundation for squareness

c)

get approval from the architect

d)

make sure the foundation is level

13.

Why is the first floor usually framed before the foundation is backfilled?

a)

To provide a safe work platform

b)

To make sure the structure is level

c)

To help the foundation withstand lateral pressure

d)

To help control settling of the foundation

14.

The level of the building's floors and walls will be affected if the sill plate is?

a)

too thick

b)

not level

c)

not plumb

d)

warped or bowed

15.

To check for level of a sill plate, which tool is not typically recommended?

a)

An 8' carpenter's level

b)

A transit

c)

A builder's level

d)

A plumb bob

16.

When nailing a rim joist to the sill plate, use?

a)

8d nails at 8" OC

b)

16d nails at 18" OC

c)

8d nails at 6" OC

d)

16d nails at 12" OC

17.

When installing a built-up beam, the joints should be positioned?

a)

directly over support columns

b)

as close to the span midpoint as possible

c)

midway between support columns

d)

at eight-foot intervals

18.

When installing a joist, end-nail it to the header joist and toenail it to the?

a)

subfloor

b)

top plate

c)

sill plate

d)

bottom plate

19.

In which of the following situations would double floor joists not be needed?

a)

Under floor openings for stairs

b)

Under loadbearing interior walls running perpendicular to the joists

c)

Under heavy objects like whirlpool tubs

d)

Under loadbearing interior walls running parallel to the joists

20.

The two header joists and the two end joists form the?

a)

floor deck

b)

rim joist

c)

box frame

d)

perimeter unit

21.

When framing a floor opening, the short pieces installed parallel to the common joists are called?

a)

trimmers

b)

tail joists

c)

purlins

d)

header joists

22.

The bottom ends of cross-bridging are not nailed in place until?

a)

the subfloor is installed

b)

wall framing is erected

c)

the building is closed in

d)

approved by the inspector

23.

When installing 4' × 8' subfloor panels, how far should you measure in from one side of the rim joist?

a)

2'

b)

4'

c)

6'

d)

8'

24.

Decks or porches that are extending over an foundation wall, and are unsupported beyond the wall, are

called?

a)

suspended

b)

reflected

c)

cantilevered

d)

projected

25.

The document listing the types and dimensions of materials needed for a job is called the?

a)

punch list

b)

specifications

c)

inventory list

d)

materials requisition

26.

Long pans or dome pans are used to form voids on the underside of slabs in?

a)

pretensioned slab floor

b)

precast concrete floor systems

c)

suspended slab systems

d)

concrete joist systems

27.

Modular panel and pedestal (access floor) systems are used?

a)

to improve sanitation in hospitals and nursing homes

b)

where a large amount of cabling is required

c)

where flooring may need to be changed periodically

d)

to shorten the project completion time