RVTI Review PDI DC Electrical Systems

Total questions: 11

Worksheet time: 10mins

Name
Class
Date
1.

During the first step in performing PDI on electrical systems, safe work practices include which of the following? (Choose all that apply.)

a)

safety glasses

b)

footwear

c)

gloves

d)

no loose jewelry

2.

Place the steps for the simple series battery bank in the correct order.

a)

configure batteries on test bench

b)

interconnect batteries

c)

connect distribution system to the battery bank

d)

record voltage

e)

record amperage

1)
2)
3)
4)
5)
3.

Place the steps for the series/parallel battery bank in the correct order.

a)

configure batteries on test bench

b)

connect two sets of 6V batteries in a series

c)

connect each set of 6V batteries in parallel

d)

connect distribution system to the battery bank

e)

record voltage, then amperage

1)
2)
3)
4)
5)
4.

Place the steps for a parallel battery bank in the correct order.

a)

configure batteries on test bench

b)

connect two 12V batteries in parallel

c)

connect distribution system to the battery bank

d)

record voltage

e)

record amperage

1)
2)
3)
4)
5)
5.

When connecting the distribution system to the battery bank, connect the batteries...

a)

positive to positive, negative to negative

b)

positive to negative, negative to positive

c)

in parallel

d)

in series

6.

Match the following requirements for creating battery banks.

a)

simple series

1.

no requirement

b)

series/parallel

2.

two sets of 6V batteries

c)

parallel

3.

two 12V batteries

7.

When constructing a battery bank, the first step is always...

a)

tightening connections

b)

to configure batteries on a test bench

c)

checking the connections

d)

to configure batteries on a test bench, with batteries oriented positive and negative

8.

The first step for Power Converter PDI is to...

a)

plug the coach into AC power source

b)

plug the coach into DC power source

c)

verify there is a power source

d)

measure DC voltage

9.

After measuring DC voltage at the converter and at the battery, you notice there is a voltage drop. Your next step is...

a)

contacting a Level 2 technician

b)

Documenting

c)

Unplugging the coach from the power source

d)

Rechecking

10.

When completing the Alternator PDI, measure DC voltage at the...

a)

coach battery bank

b)

chassis battery bank

c)

converter

d)

charge controller output

11.

After assembling documentation for the Solar PDI, you should...

a)

inspect mounting brackets for rust

b)

measure output voltage at charge controller output

c)

inspect mounting brackets for proper installation

d)

measure output voltage at the battery bank