wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

ABM - Q1

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Q 1. What is a "carbon footprint"?

a)

 Total amount of CO2 emitted by a machine

b)

Total amount of CO2 emitted by an individual

c)

Total amount of CO2 emitted by a company

d)

All of the above

2.

Q 3. Which of these is not a source of increase in carbon footprint?

a)

Energy production

b)

b. Deforestation

c)

c. Cycling

d)

 Sports cars

3.

What is this?

a)

It is a dump truck.

b)

It is a bulldozer.

c)

It is a crane.

d)

It is a forklift.

4.

What is this called?

a)

A wheelmaster

b)

A rollbarrow

c)

A wheelbarrow

d)

A pushwheel

5.

Architect vs. Civil Engineer

a)

There is no difference.

b)

The architect is for buildings and the Civil Engineer is for heavy constructions (as roads, bridges ect)

c)

The architect is the one who creates plans of a building, while a civil engineer implements these plans, completing the constructions.

d)

A civil engineer has to deal with more aesthetics

than physics. Physics and functionality are for an architect.

6.

Cement is made from ______

a)

Iron ore

b)

Limestone

c)

Soil

7.

Which of the following materials are used to make concrete?

a)

Sand, clay, shingle, water

b)

Cement, water, aggregate, sand

c)

Cement, shingle, water, stone

d)

Cement, clay, gypsum, water

8.

Where is a DPC placed?

a)

Laid on the foundation

b)

In the floor screed

c)

In the cavity of a wall construction

d)

In the course of brick or block

9.

Taj Mahal is made up of _______.

a)

Yellow Marble

b)

Makrana Marble

c)

Abu Black Marble

d)

Rajnagar Marble

10.

The standard size of masonary bricks is

a)

20cm × 10cm × 10cm20cm\ \times\ 10cm\ \times\ 10cm

b)

18cm × 8cm × 8cm18cm\ \times\ 8cm\ \times\ 8cm

c)

19cm × 9cm × 9cm19cm\ \times\ 9cm\ \times\ 9cm

d)

21cm × 11cm × 11cm21cm\ \times\ 11cm\ \times\ 11cm

11.

What is this material? (ELL)

a)

clay

b)

mud

c)

brick

d)

wood

12.

Gypsum consists of

a)

H2S and CO2H_2S\ and\ CO_2

b)

CaSO4 and H2OCaSO_4\ and\ H_2O

c)

Lime and H2OLime\ and\ H_2O

d)

CO2 and CalciumCO_{2\ }and\ Calcium

13.

Initial setting time of ordinary Portland cement is

a)

10 hours

b)

30 minutes

c)

60 minutes

d)

90 minutes

14.

One of the following is an igneous rock

a)

Slate

b)

Marble

c)

Sand stone

d)

Basalt

15.

Good quality stones absorb water less than __%

a)

5

b)

10

c)

15

d)

20