NEW
Font size
WorksheetsABM - Q1
Total questions: 15
Worksheet time: 8mins
Q 1. What is a "carbon footprint"?
Total amount of CO2 emitted by a machine
Total amount of CO2 emitted by an individual
Total amount of CO2 emitted by a company
All of the above
Q 3. Which of these is not a source of increase in carbon footprint?
Energy production
b. Deforestation
c. Cycling
Sports cars
What is this?
It is a dump truck.
It is a bulldozer.
It is a crane.
It is a forklift.
What is this called?
A wheelmaster
A rollbarrow
A wheelbarrow
A pushwheel
Architect vs. Civil Engineer
There is no difference.
The architect is for buildings and the Civil Engineer is for heavy constructions (as roads, bridges ect)
The architect is the one who creates plans of a building, while a civil engineer implements these plans, completing the constructions.
A civil engineer has to deal with more aesthetics
than physics. Physics and functionality are for an architect.
Cement is made from ______
Iron ore
Limestone
Soil
Which of the following materials are used to make concrete?
Sand, clay, shingle, water
Cement, water, aggregate, sand
Cement, shingle, water, stone
Cement, clay, gypsum, water
Where is a DPC placed?
Laid on the foundation
In the floor screed
In the cavity of a wall construction
In the course of brick or block
Taj Mahal is made up of _______.
Yellow Marble
Makrana Marble
Abu Black Marble
Rajnagar Marble
The standard size of masonary bricks is
20cm × 10cm × 10cm
18cm × 8cm × 8cm
19cm × 9cm × 9cm
21cm × 11cm × 11cm
What is this material? (ELL)
clay
mud
brick
wood
Gypsum consists of
H2S and CO2
CaSO4 and H2O
Lime and H2O
CO2 and Calcium
Initial setting time of ordinary Portland cement is
10 hours
30 minutes
60 minutes
90 minutes
One of the following is an igneous rock
Slate
Marble
Sand stone
Basalt
Good quality stones absorb water less than __%
5
10
15
20
