ARC MOCK UP 1

Total questions: 34

Worksheet time: 17mins

Name
Class
Date
1.

The maximum imprisonment as penalty to architect found guilty of malpractice under RA 9266 is

a)

10 years

b)

 6 years

c)

3 months

d)

6 months

2.

The MINIMUM imprisonment as penalty to architect found guilty of malpractice under RA 9266 is

a)

6 Years

b)

8 Years

c)

3 months

d)

6 months

3.

What is NOT an architect’s responsibility in relation to the people?

A. He shall promote the interest of his/her professional organization.

a)

He shall promote the interest of his/her professional organization.

b)

He shall use every possible means including paid advertisement to promote his services. 

c)

He shall strive to improve the environment and the life and habitat.

d)

He shall respect and help serve the systems of values and natural, historic and cultural heritage of the community.

4.

What is NOT an architect’s responsibility in relation to his/her client?

a)

He shall guarantee every estimate and cost of work for the project.

b)

He shall advise his/her client against proceeding whose practicability may be questionable. 

c)

He shall explain to his/her client from the very beginning the exact nature and scope of his/her services.

d)

He shall introduce to his prospective client the services he/she is competent to perform.

5.

What is NOT an architect’s responsibility in relation to the contractor?

a)

He shall reject bribes or commissions from the contractor.

b)

He shall give reasonable full support to the contractor by furnishing clear, definite and consistent information in all pertinent contract documents.

c)

He shall knowingly call upon the contractor to correct or remedy oversights or errors subject to variation cost.

d)

He shall promptly inspect works completed and issue Certificate of Payment.

6.

What is the document or standard form of agreement that defines the scope of work and amount of contract among others in a construction job?

a)

Specialty Service Contract

b)

Contract Documents Agreement

c)

Service Agreement

d)

Owner-Contractor Agreement

7.

What is the document that describes and defines the design, materials to be used and the standards of workmanship in construction?

a)

Materials Schedule

b)

Specification

c)

General Conditions

d)

Conditions of Contract

8.

The common term for the drawings submitted to the OBO after the construction completion of a project is

a)

Detailed Plans

b)

As-built plans 

c)

Completion drawings

d)

Building plans

9.

What is the permit to be secured after the construction of a project and before the project owner can move-in?

a)

Habitation

b)

Moving-In

c)

Mobilization

d)

Occupancy

10.

What is issued by the OBO at a time electrical works are substantially completed?

a)

Certificate of Electrical Inspection 

b)

Complete Electrical Installation

c)

Certified Electric Institution

d)

Certificate of Emergency Inspection

11.

Deadline on payment of Professional Tax Receipt (PTR) is

a)

 April

b)

 June

c)

 March

d)

January 

12.

The most common renewal of business permit is done in the month of

a)

January

b)

 June

c)

April

d)

February 

13.

The first step in renewal of business license is securing _____ permit renewal.

a)

sanitary

b)

health

c)

barangay

d)

mayor’s

14.

When is the deadline of filing the income tax return?

a)

May 15

b)

March 15

c)

June 15

d)

April 15

15.

What is the general percentage rate of VAT in the Philippines?

a)

10

b)

15

c)

20

d)

12

16.

What is the waterproofing method that is very common which is semi-flexible or rigid and NOT exposed to weathering or sunlight?

a)

Injection Grout

b)

Polyurethane

c)

Cementitious

d)

EPDM Membrane

17.

What is the waterproofing method which is a flexible asphalt layer?

a)

Cementitious

b)

Torch Seal

c)

 Bituminous

d)

EPDM Membrane

18.

What is the waterproofing method which is synthetic rubber single layer flexible membrane

a)

Polyurethane Membrane

b)

Bituminous Membrane

c)

Self- Adhesive

d)

EPDM Membrane

19.

What is the most common percentage per day of delay, of the contract price, the sum of

liquidated damages due to failure of the contractor to complete the project on time?

a)

10%

b)

1/10 of 1% 

c)

5%

d)

1%

20.

Whenever class of material is specified by trade name or by catalog references, substitution can be allowed with the approval of the _____.

a)

architect of record 

b)

construction manager

c)

owner

d)

building official

21.

The allowable maximum TGFA for basic residential 2 without firewall and inside lot is _____ of TLA.

a)

3 x 60% 

b)

5 x 70%

c)

3 x 70%

d)

5 x 60%

22.

The allowable maximum TGFA for basic residential 2 firewall and corner lot is ____ of TLA.

a)

5 x 60%

b)

5 x 60%

c)

3 x 70% 

d)

3 x 60%

23.

The allowable maximum TGFA for basin residential 2 without firewall and through lot is _______ of TLA.

a)

3 x 60%

b)

3 x 70%

c)

5 x 70%

d)

5 x 60%

24.

The allowable maximum TGFA for basic residential 2 without firewall and corner through lot is______ of TLA.

a)

3 x 60%

b)

5 X 70%

c)

5 x 60%

d)

3 x 70%

25.

Mixing concrete should be undertaken within _____ minutes after the cement has been added to the aggregates

a)

40

b)

 35

c)

30

d)

45

26.

To maintain concrete consistency, the slump shall be from _____ and shall be determined in accordance to ASTM C143.

a)

10mm to 40mm

b)

50mm to 100mm

c)

10mm to 40mm

d)

30mm to 50mm

27.

Concrete shall be conveyed from the mixer to the forms as rapidly and as practicable by proper methods. At any point in the conveying, the free vertical drop of the concrete shall not exceed _____ millimeters.

a)

95

b)

1200

c)

910

d)

1000

28.

All concrete shall be compacted with high frequency mechanical vibrating equipment supplemented by hand spading and tamping except for concrete slabs of ______ millimeters or less in depth.

a)

150

b)

100

c)

250

d)

200

29.

In general, concrete constructions are located _____ of the spans of slabs.

a)

At one quarter

b)

At one third

c)

Near the middle

d)

At the end

30.

Once an architect is duly registered, membership to the United Architects of the Philippines is_____.

a)

Required

b)

Automatic

c)

discretionary

d)

optional

31.

What is required of agencies or organizations who secure the service of a foreign professional authorized by the law to practice in the Philippines?

a)

Secure a special permit from PRC and DOLE 

b)

Secure work visa from the Bureau of Immigration

c)

Apply a work visa from the Department of Foreign Affairs

d)

Registration of the person with SEC

32.

What is required of architects before performing any service otherwise they shall be guilty of misdemeanour ?

a)

Research and information gathering

b)

Research and information gathering

c)

Written contract agreement

d)

Feasibility studies and interview

33.

What is the maximum length of imprisonment for people convicted and found guilty of violating any provisions of RA 9266?

a)

6 years 

b)

2 years 

c)

10 years 

d)

5 years 

34.

What is the legal provision that shall be incorporated in all contract documents and other instruments of service prepared by all architects?

a)

Current and valid Professional Tax Receipt

b)

Ownership of plans and specifications

c)

Signature and seal of the architect

d)

Valid Certificate of Registration and Professional Id Card