BQS601 INTRODUCTION

Total questions: 17

Worksheet time: 10mins

Name
Class
Date
1.

Sum provided for work or services to be executed by a Nominated Sub Contractor.

The statement above is

a)

Provisional Sum

b)

Prime Cost Sum

c)

Preliminaries Sum

d)

Drain Sump

2.

When there is Nominated Supplier, the Main Contractor may received

a)

Profit and Attendance

b)

Profit Only

c)

Attendance Only

d)

None of the above

3.

When there is Provisional Sum, the Main Contractor may received

a)

Profit and Attendance

b)

Profit Only

c)

Attendance Only

d)

None of the above

4.

Prime Cost sum is the money allocated for

a)

Main Contractor

b)

Nominated Sub Contractor

c)

Sub Conctractor

d)

Consultant

5.

The Description show contract for

a)

Provisional Sum

b)

Preliminaries

c)

Prime Cost Sum

6.

The picture shows description for

a)

Provisional Sum

b)

Prime Cost Sum

c)

Preliminaries Sum

7.

Below are example of items under Preliminaries Sum EXCEPT

a)

hoarding

b)

site office

c)

insurance

d)

site transportation

e)

fire fighting installation

8.

Below are the THREE components of Surface Water Drainage EXCEPT

a)

Sump

b)

Channel

c)

Culvert

d)

Manhole

9.

Based on V.5 SMM2, the below statement are true for measurement of Cascade drain EXCEPT

a)

shall be enumerated

b)

state the number of steps

c)

state the total drop

d)

state the angle of inclining

10.

Surface water channels shall be given in

a)

M

b)

M2

c)

M3

d)

No

11.

Construction of Sumps shall include

a)

connection to existing drain

b)

connection to existing sump

c)

connection to existing manhole

12.

Beds, benching and coverings shall each be given separately in metres stating the below EXCEPT

a)

Nominal size of the pipe

b)

Widths and thickness of the beds

c)

Materials used

d)

connection to existing drain

13.

A Provisional Sum is primarily used when:

a)

The work is always carried out by a nominated subcontractor

b)

The work or cost cannot be entirely foreseen, defined or detailed at tender stage

c)

The contractor wants additional profit

d)

The work is always a temporary site facility

14.

Which of the following is an example of a PC Sum according to the slide?

a)

Site office

b)

Hoarding install by Main Contractor

c)

Lift installation by a nominated subcontractor

d)

Site electricity

15.

The unit for the Provisional Sum

a)

m

b)

m2

c)

No

d)

SUM

16.

Which rate is identified for work that cannot be properly measured and valued?

a)

Which rate is identified for work that cannot be properly measured and valued?

b)

Pro-rata rate

c)

Agreed rate

d)

Daywork price

17.

Classify each one as PS, PC or Preliminary based on the information givench the following

a)

Lift installation by nominated subcontractor

1.

PC SUM

b)

Site office

2.

Preliminary

c)

Landscaping with insufficient design information

3.

PROV SUM

d)

Performance bond

4.

Preliminary

e)

Built-in furniture where details are not fully determined

5.

PROV SUM