Font size
WorksheetsNEO Week 2 Day 2
Total questions: 12
Worksheet time: 6mins
What Automation Level runs fully automated with no human intervention required?
L6
L5
L7
L8
What are some commonly used monitors?
Hot Lot
Surf Scan
Production
Etch Rate
What is an eFIT?
Workout Program
Tool Reservations
Evacuation Alarm
Passdown
What is OpsView used for?
View lot details
View Tool Status
Create Workorder
View monitor's
What does Hot Lot do to a lot?
Place's lot on hold
Give lot priority
moves lot to different tool
Will merge lot with another
In Lot Detail, what does the Green Dot with an E in it mean?
Expired
Equipment
Execute
Experiment
Why is a lot typically placed on hold?
To give priority
To contain potential quality issue
To remove from fab
To scrap
What do we use Fuzion for?
Tool Reservations
Passdown
Checklist's
Gameplan's
What levels of Integrated Delivery are there? Select all that are correct.
L5
L6
L7
L8
What application is used to change the state of a tool? Example, log the too from Up To Production to Engineering.
Lot Dispatch
OpsView
Equipment Detail
Lot Detail
What is the highest Hot Lot priority?
1
5
99
3
Is Lot Detail, what does a White E inside the green circle mean?
Entertaining
Exact
Extra
Execute
