wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Chapter 11 Carpentry

Total questions: 17

Worksheet time: 14mins

Name
Class
Date
1.

Inside walls that do not carry any structural load

(a)  

2.

Vertical members of the wall frame

(a)  

3.

The horizontal member at the bottom of the wall frame, supported by a wood subfloor, concrete slab, or other closed surface

(a)  

4.

Horizontal member at the top of a wall frame

a)

advanced framing

b)

Nailer

c)

Sole Plate

d)

Top Plate

5.

Exterior by boards or prefabricated panels

a)

sheathing

b)

cripple studs

c)

trimmer stud

d)

soffit

6.

Also called Jack stud are shorted studs that stiffen the sides of rough openings

(a)  

7.

Lumber added as a backing at inside corners

a)

Headers

b)

Nailer

c)

Rough openings

d)

Footers

8.

openings formed by framing members to receive and support windows or doors

(a)  

9.

support the weight of the building across door and window opening

a)

nailers

b)

Toenails

c)

footers

d)

headers

10.

a long measuring stick created and used by a carpenter on the job

(a)  

11.

To help exterior walls resist lateral (sideway) loads. Made of 18 to 20 gauge galvanized steel and is 2" wide.

a)

soffit

b)

ceiling joists

c)

Metal-strap bracing

d)

strongback

12.

What closes in the space between the ceiling and the tops of the cabinets

(a)  

13.

The system of support for all components of the ceiling

(a)  

14.

L-shaped support constructed of 2" lumber

a)

Cripple Stud

b)

advanced framing

c)

structural insulated panel

d)

Strongback

15.

A framing system that conserves natural resources while optimizing structural performance

(a)  

16.

are panels made with osb or plywood sheathing on the exterior side

(a)  

17.

Thin tough plastic sheet material that is applied to exterior walls

(a)