Cannock EIC Quiz

Total questions: 17

Worksheet time: 51mins

Name
Class
Date
1.

Under what condition are you permitted to photocopy or electronically manipulate the IET forms according to the document?

a)

For any purpose as long as it is free of charge.

b)

Solely in connection with your electrical contracting business.

c)

For the purpose of resale.

d)

Without any conditions as long as the IET logo is not reproduced.

2.

How long does the permission to use the IET forms last before it needs to be considered for renewal?

a)

After five years from the date hereof.

b)

After seven years from the date hereof.

c)

After ten years from the date hereof.

d)

It does not expire and does not need renewal.

3.

Which of the following is NOT included in the Electrical Installation Certificate ?

a)

Details of client

b)

Schedule of Circuit Details

c)

Schedule of Test Results

d)

Electrical Maintenance Log

4.

What is the purpose of the 'Schedule of Inspections' section in the Electrical Installation Certificate?

a)

To record the maximum demand of the installation

b)

To list the names and addresses of the signatories

c)

To document the inspection outcomes of various parts of the installation

d)

To provide the details of the installation earthing

5.

Which of the following is NOT a type of earthing arrangement listed in the Electrical Installation Certificate?

a)

TN-C

b)

TT

c)

IT

d)

TN-B

6.

What information is required under the 'Main switch / Switch-fuse / Circuit-breaker / RCD' section?

a)

Location, BS (EN) number, and number of poles

b)

Current rating, fuse/device rating or setting, and voltage rating

c)

Type of earthing electrode and electrode resistance to Earth

d)

Maximum demand in kVA/Amps and details of installation Earth Electrode

7.

Which of the following is a characteristic that may be included under 'Nature of Supply Parameters' in the Electrical Installation Certificate?

a)

Prospective fault current, Ipf

b)

Rated residual operating current

c)

Measured operating time

d)

Connection / continuity verified

8.

What is the Electrical Installation Certificate NOT to be used for?

a)

Initial certification of a new installation

b)

Periodic inspection and testing

c)

Replacement of a consumer unit/distribution board

d)

Certifying multiple additions or alterations to the existing installation

9.

Who should retain a duplicate of the original Electrical Installation Certificate?

a)

The person conducting the inspection

b)

The person ordering the work

c)

The designer of the installation

d)

The installer of the electrical work

10.

What must be completed to validate the Electrical Installation Certificate?

a)

Schedule(s) of Circuit Details and Test Results

b)

A single signature from the lead electrician

c)

Payment for the electrical work done

d)

A periodic inspection report

11.

Who is authorized to sign the Electrical Installation Certificate?

a)

Only the person who designed the installation

b)

Only the person who installed the electrical work

c)

Persons authorized by the company executing the work of design, construction, inspection, and testing

d)

Any certified electrician

12.

What should the maximum prospective value of fault current (I) recorded be?

a)

The minimum value of short-circuit current

b)

The average value of short-circuit current

c)

The greater of either the prospective value of short-circuit current or the prospective value of earth fault current

d)

The lesser of either the prospective value of short-circuit current or the prospective value of earth fault current

13.

What should be done if a residual current device (RCD) does not switch off the supply when the test button is pressed?

a)

Continue using the device as normal.

b)

Send HSE a strongly worded email

c)

Replace the device immediately.

d)

Ignore the issue as it is not significant.

14.

How often should an arc fault detection device containing a built in test function (AFDD) be tested?

a)

Weekly

b)

Monthly

c)

Six-monthly

d)

Annually

15.

What should be checked to confirm the operational condition of a surge protective device (SPD)?

a)

The device's color

b)

The status indicator

c)

The device's size

d)

The brand name

16.

What should be present at all points of isolation of all sources of supply when the installation includes alternative or additional sources of supply?

a)

Instruction manuals

b)

Warning notices

c)

Operational guides

d)

Maintenance schedules

17.

According to the document, what is the purpose of the Electrical Installation Certificate?

a)

To confirm the electrical installation work has been designed, constructed, inspected, and tested in accordance with BS 7671.

b)

To provide a detailed guide on how to use electrical appliances.

c)

To serve as a warranty for electrical work done.

d)

To list the names of the electricians who performed the work.