Worksheets

217 PP8 sanitation soil pipes

Total questions: 48

Worksheet time: 24mins

Name
Class
Date
1.

Sanitation systems must prevent which of the following from entering the building under working conditions?

a)

Natural light

b)

Foul air

c)

Insects

d)

Heat

2.

What is a requirement for sanitation systems in terms of accessibility?

a)

Be accessible for electrical maintenance

b)

Be accessible for clearing blockages

c)

Be accessible for water meter readings

d)

Be accessible for aesthetic inspections

3.

How should the size of the sanitation system be determined?

a)

By the size of the building

b)

By the number of residents in the building

c)

By the expected flow at any point in the system

d)

By the cost of the materials

4.

Which document should be consulted for information on means of ventilation

a)

BS465: Sanitary installations

b)

Building Regulations part 'H'

c)

BSEN12056: parts 1–5

d)

Building Regulations part 'F'

5.

What is the title of the document that deals with drainage and waste disposal

a)

Building Regulations part 'F'

b)

BS465: Sanitary installations

c)

BSEN12056: parts 1–5

d)

Building Regulations part 'H'

6.

Which standard is referenced for sanitary installations

a)

Building Regulations part 'F'

b)

Building Regulations part 'H'

c)

BSEN12056: parts 1–5

d)

BS465: Sanitary installations

7.

For gravity drainage systems inside buildings, which document is recommended by the Level 2 Technical Certificate in Plumbing?

a)

BS465: Sanitary installations

b)

Building Regulations part 'F'

c)

Building Regulations part 'H'

d)

BSEN12056: parts 1–5

8.

Which documents restrict the systems installed and the materials used in above-ground drainage systems to ensure that hygienic conditions are maintained in dwellings and buildings at all times?

a)

BS 8000-13 1989 and Building Regulations Document H3

b)

Building Regulations Document H3 and BS EN 12056

c)

BS EN 12056 and BS 8000-13 1989

d)

Building Regulations Document H2 and BS EN 12506

9.

What is the subject of the code of practice BS 8000-13 1989?

a)

Installation of electrical systems

b)

Workmanship on building sites for drainage and sanitary appliances

c)

Guidelines for plumbing in residential buildings

d)

Safety standards for construction materials

10.

What determines the position of the soil and vent pipework in new-build installations such as multi-dwelling housing developments?

a)

The preferences of the plumbing contractor

b)

The position of the electrical wiring

c)

The drain connection detailed on the Architect’s drawings

d)

The location of the nearest water supply

11.

Which of the following materials can be solvent welded using solvent cement to BS ISO 6209:2009?

a)

PVCu

b)

muPVC

c)

ABS

d)

All of the above

12.

What is the base size for soil stack sizes in domestic situations?

a)

50mm

b)

75mm

c)

100mm

d)

150mm

13.

Which of the following is NOT one of the main types of drainage system mentioned in the text?

a)

Primary ventilated stack system

b)

Secondary ventilated stack system

c)

Ventilated branch discharge system

d)

Tertiary recycling stack system

14.

What is the name of the plumbing system that has a single pipe connected directly to the fixtures and a vertical vent pipe?

a)

Primary ventilated branch

b)

Secondary ventilated branch

c)

Ventilated discharge system

d)

None of the above

15.

Which plumbing system includes a secondary pipe that acts as a vent for the fixtures?

a)

Primary ventilated branch

b)

Secondary ventilated branch

c)

Ventilated discharge system

d)

None of the above

16.

In which system are the fixtures connected to a stack, with the stack itself being vented?

a)

Primary ventilated branch

b)

Secondary ventilated branch

c)

Ventilated discharge system

d)

None of the above

17.

What is the function of the vent pipe in a standard domestic stack?

a)

It takes all the effluent away from the building.

b)

It allows air to enter the system to operate at atmospheric pressure.

c)

It is used for water supply to the dwelling.

d)

It collects rainwater from the roof.

18.

What could happen if the pressure in the vent pipe varies?

a)

The system will operate more efficiently.

b)

It could lead to trap seal loss, allowing foul air to enter the dwelling.

c)

The effluent will be recycled.

d)

The water supply will increase.

19.

What is the purpose of the soil pipe in a standard domestic stack?

a)

It allows air to enter the system to operate at atmospheric pressure.

b)

It is used for electrical wiring within the building.

c)

It takes all the effluent away from the building.

d)

It provides ventilation to the rooms.

20.

What is the primary reason a primary ventilated stack does not require extra ventilation?

a)

Because it is connected to the main sewer line.

b)

Because the discharge branches from the appliances are closely grouped around the stack.

c)

Because it uses a special type of pipe material.

d)

Because it has an automatic pressure control system.

21.

What is the purpose of maintaining a 2.5° gradient in the discharge branches?

a)

To increase the water pressure

b)

To prevent water from flowing

c)

To maintain a 'self-cleaning' velocity

d)

To create a blockage

22.

Why is a 'self-cleaning' velocity important in plumbing systems?

a)

It increases the risk of blockage

b)

It decreases the efficiency of water appliances

c)

It reduces the risk of blockage

d)

It is required for heating the water

23.

What is the min waste size requirement for a junior WC

a)

32 mm

b)

40 mm

c)

75 mm

d)

100 mm

24.

What is the maximum length allowed for the waste pipe of a basin or bidet?

a)

1.7 m

b)

3.0 m

c)

6.0 m

d)

Not specified

25.

What is the gradient range for the waste pipe of a sink?

a)

18 mm/m

b)

18–22 mm/m

c)

18–90 mm/m

d)

Not specified

26.

According to the document, what is the trap seal depth for a washing machine or dishwasher?

a)

50 mm

b)

75 mm

c)

100 mm

d)

Not specified

27.

For an adult WC, what is the required waste size?

a)

32 mm

b)

40 mm

c)

75 mm

d)

100 mm

28.

What should be done if an installation exceeds the maximum length stated?

a)

The gradient should be altered.

b)

The pipe size should remain the same.

c)

The next pipe size up should be used.

d)

The installation should be redesigned.

29.

If multiple appliances are connected to a single discharge pipe, what is the minimum pipe size that should be used?

a)

32mm

b)

40mm

c)

50mm

d)

75mm

30.

What is the waste size of an adult WC that is fitted to a 100mm discharge branch?

a)

75mm

b)

100mm

c)

32mm

d)

50mm

31.

Where are junior WCs often installed?

a)

Adult schools

b)

Offices

c)

Nursery schools and infant schools

d)

Public areas

32.

What must be installed at the base of a soil stack to maintain its velocity when changing from a vertical to horizontal movement?

a)

A) A short radius bend

b)

B) A straight connector

c)

C) A long radius bend

d)

D) A trap

33.

What can be used instead of a long radius bend in some systems to change direction from vertical to horizontal?

a)

A) A single 90° connector

b)

B) Two 45° connectors

c)

C) A straight pipe

d)

D) A trap

34.

What problem did older systems experience without a long radius bend?

a)

A) Increased flow rate

b)

B) No change in performance

c)

C) Problems with compression or back pressure for the discharge

d)

D) Easier installation

35.

Where is it good practice to position a rodding access in relation to the ground level at the base of the stack?

a)

Just below ground level

b)

At the midpoint of the stack

c)

Just above ground level

d)

At the top of the stack

36.

What is the minimum distance from the drain invert level to the lowest connection of the soil stack in 'low rise' buildings (two storeys)?

a)

450mm

b)

750mm

c)

500mm

d)

600mm

37.

For buildings up to how many storeys does the minimum distance from the drain invert level to the lowest connection of the soil stack increase to 750mm?

a)

Two storeys

b)

Three storeys

c)

Four storeys

d)

Five storeys

38.

What is the maximum angle at which branch connections to the soil stack should be made to aid the flow of effluent?

a)

67.5°

b)

45°

c)

87.5°

d)

90°

39.

For branch connections up to 75mm diameter, what is the required radius for a swept entrance?

a)

50mm radius

b)

25mm radius

c)

45mm radius

d)

200mm radius

40.

For branch connections more than 75mm diameter, what is the required radius for a swept entrance?

a)

25mm radius

b)

45mm radius

c)

50mm radius

d)

200mm radius

41.

What is the maximum permissible distance from the centerline of the soil stack to the centerline of a branch connection?

a)

200mm

b)

250mm

c)

300mm

d)

400mm

42.

What is the minimum vertical distance required between an existing branch connection to a stack and any other connection installed opposite to it to avoid crossflow?

a)

100mm

b)

150mm

c)

200mm

d)

250mm

43.

Why should the prevention of crossflow from one connection to another be practiced in plumbing?

a)

To increase water pressure

b)

To prevent trap seal loss and the crossflowing of effluent up the opposite connection

c)

To reduce water consumption

d)

To prevent pipe corrosion

44.

What is the maximum diameter allowed for a small branch connection to a stack as shown in the diagram (c) Opposing waste pipes?

a)

82mm

b)

90mm

c)

160mm

d)

250mm

45.

According to the diagram (a) Restriction connection area on stack, what is the minimum distance required between the center line of an opposed branch connection and the top of the stack?

a)

90mm

b)

160mm

c)

200mm

d)

250mm

46.

In the diagram (b) Examples of permitted connections, what is the minimum distance allowed for an unopposed connection in the permissible area?

a)

82mm

b)

90mm

c)

160mm

d)

200mm

47.

Referring to the diagram (a) Restriction connection area on stack, the center line of an opposed branch must not be below which point?

a)

The bottom of the stack

b)

The center line of the stack

c)

The top of the stack

d)

200mm above the bottom of the stack

48.

with regard to opposing waste pipes, what is the range of distances within which no opposing branch connection of similar size is permitted?

a)

82–160mm

b)

90–250mm

c)

200–250mm

d)

90–160mm