SPP Platforms and Processes for Emergency Communication

Total questions: 25

Worksheet time: 17mins

Name
Class
Date
1.

Which SPP Communication Platform allows RTBM, WEIS, and/or the West RC to send texts, emails, and automated phone calls to TOPs, BAs, GOPs, and MPs?

a)

R-Comm

b)

xMatters

c)

Satellite Phone

d)

Market User Interface

2.

Which SPP Communication Platform allows the SPP RC to send messages to all RCs?

a)

R-Comm

b)

xMatters

c)

RCIS

d)

Market User Interface

3.

Which SPP Communication Platform does the SPP Shift Supervisor use to post information to the public?

a)

OASIS

b)

xMatters

c)

RCIS

d)

Market User Interface

4.

Which SPP Communication Platform is used as an alternative communications means?

a)

OASIS

b)

xMatters

c)

RCIS

d)

Satellite Phone

5.

Which SPP Communication Platform allows the SPP RC or BC communicate with TOPs and BAs?

a)

R-Comm

b)

xMatters

c)

RCIS

d)

Satellite Phone

6.

Which Operating Status Level?

Customer outages greater than exception report criteria and customer restoration times expected greater than 24 hours; System emergency in progress (Specify – capacity, etc.)

a)

Green

b)

Yellow

c)

Amber

d)

Red

7.

Which Operating Status Level?

Anomalies may have occurred affecting electrical system operations; Unusual or unexpected system conditions; Severe weather impacts on electrical system operations

a)

Green

b)

Yellow

c)

Amber

d)

Red

8.

Which Operating Status Level?

Operating criteria are met; System is secure

a)

Green

b)

Yellow

c)

Amber

d)

Red

9.

Which Operating Status Level?

Anomalies probably have occurred in electrical system affecting electrical system operations; Customer interruptions greater than exception report criteria; Voltage reduction or load shedding

a)

Green

b)

Yellow

c)

Amber

d)

Red

10.

What communication platform used in the Western Interconnect interfaces with SPP's R-Comm tool?

a)

Grid Messaging System (GMS)

b)

Request Management System (RMS)

c)

Control Room Operations Window (CROW)

d)

Application Programmable Interface (API)

11.

The energy deficient BA is unable to meet Contingency Reserve requirements

a)

b)

c)

12.

All available non-firm transactions have been curtailed

a)

b)

c)

13.

Firm load interruption is imminent or in progress

a)

b)

c)

14.

Operating Plan has been implemented

a)

b)

c)

15.

All available generation resources are committed to meet firm load, firm transactions, and reserve commitments

a)

b)

c)

16.

Still able to maintain Contingency Reserves requirements but is energy deficient.

a)

b)

c)

17.

When SPP has enough generation to meet demand and available reserves, and it foresees no extreme or abnormal threats to reliability, its Grid Condition is (a)   .

Choose from the below words

Normal Operations

Weather Advisory

Resource Advisory

Conservative Operations Advisory

Restoration Event

18.

When Extreme weather is expected in SPP’s RC area, the Grid Condition is (a)   .

Choose from the below words

Resource Advisory

Conservative Operations Advisory

Restoration Event

Weather Advisory

Normal Operations

19.

(a)   is the Grid Condition declared when weather conditions, significant outages, wind-forecast uncertainty, and load-forecast uncertainty are expected in SPP's balancing authority area.

Choose from the below words
Resource Advisory

Conservative Operations Advisory

Restoration Event

Weather Advisory

Normal Operations

20.

When a major or catastrophic grid outage, which could be a total or partial regional blackout, island situation, or system separation occurs, the Grid Condition is (a)   .

Choose from the below words

Conservative Operations Advisory

Weather Advisory

Normal Operations

Resource Advisory

Restoration Event

21.

Where can the public go to view SPP's historical data for advisories and alerts?

a)

OASIS

b)

R-Comm

c)

RCIS

d)

xMatters

22.

SPP holds daily (or more, as needed) Webex discussions with TOPs and TOs for any Grid Condition ___ or more severe.

a)

Resource Advisory

b)

Conservative Operations

c)

EEA 1

23.

If SPP issues a Load Shed instruction, TOPs will be alerted via what SPP Communication Platform?

a)

RMS

b)

MUI

c)

R-Comm

24.

What SPP notification would include the following?

•The hours in which the Emergency ranges of any Resources are expected to be required.

•The hours in which Resources with a Commit Status of Reliability are expected to be committed.

•The hours in which non-firm fixed Export Interchange Transactions are expected to be curtailed.

a)

Maximum Emergency Generation

b)

Forecast Minimum Generation

25.

When energy becomes available and the system can return to pre-emergency condition, how is an EEA downgraded?

a)

The BA requests the RC make the downgrade

b)

The BA downgrades the EEA itself