PP11 sanitation drainage

Total questions: 36

Worksheet time: 18mins

Name
Class
Date
1.

What is the function of below-ground drainage systems?

a)

To supply clean water to dwellings

b)

To take discharged soiled water and rainwater away from the dwelling

c)

To provide electrical supply to properties

d)

To collect garbage from the road

2.

Which systems are favoured by local authorities for below-ground drainage?

a)

Combined systems

b)

Separate systems

c)

Open systems

d)

Closed systems

3.

What does foul water connect to in a separate drainage system?

a)

The surface water sewer

b)

The foul water sewer

c)

The rainwater sewer

d)

The stormwater sewer

4.

What does rainwater connect to in a separate drainage system?

a)

The foul water sewer

b)

The surface water sewer

c)

The drinking water supply

d)

The greywater recycling system

5.

Which of the following is included in foul water discharges?

a)

Discharges from the kitchen sink only

b)

Discharges from the WC, bath, basin, bidet, and sink

c)

Discharges from rainwater downpipes

6.

What does IC stand for in the plumbing system diagram?

a)

Internal Chamber

b)

Inspection Chamber

c)

Inflow Collector

d)

Interconnecting Channel

7.

What is an advantage of a separate system in plumbing?

a)

Sewage plant is inundated with water when it rains

b)

Trapped gullies are required for rainwater

c)

Rainwater receives treatment

d)

Sewage plant is not inundated with water when it rains

8.

Which of the following is a disadvantage of a separate system in plumbing?

a)

It is less expensive to install

b)

Foul water system is regularly flushed by rainwater

c)

There is no risk of making an incorrect connection

d)

Risk of making an incorrect connection

9.

Is the combined system recognized by the Building Regulations for new builds?

a)

Yes, it is the standard system for new builds.

b)

No, it is only used for temporary structures.

c)

Yes, but only in certain regions.

d)

No, it is not recognized for new builds.

10.

What does 'RWG' stand for in the context of plumbing systems?

a)

Rainwater generator

b)

Rainwater gully

c)

Recycled water gate

d)

Road water grid

11.

What does 'IC' stand for in the context of plumbing systems?

a)

Internal conduit

b)

Inspection chamber

c)

Inflow collector

d)

Irrigation channel

12.

What does 'S&VP' stand for in the context of plumbing systems?

a)

Soil and vent pipe

b)

Sewage and vacuum pump

c)

Stormwater and valve port

d)

Sanitation and vortex panel

13.

What is a soakaway in plumbing?

a)

A device that purifies rainwater for drinking purposes.

b)

A 1.0m³ pit filled with gravel/stones where a rainwater discharge pipe is placed to disperse water into the ground.

c)

A system that collects rainwater from the roof and channels it directly into the household water supply.

d)

A type of pump used to remove excess water from basements.

14.

What is the function of the road gully as indicated in the diagram?

a)

To provide access for inspection

b)

To collect rainwater from the surface

c)

To carry sewage to the treatment plant

d)

To vent sewer gases

15.

What is an advantage of a partially separate system in plumbing?

a)

Increases the complexity of the installation.

b)

Reduces the overall cost of the installation.

c)

Requires more time to install.

d)

Increases the maintenance requirements.

16.

What is a disadvantage of a partially separate system in plumbing?

a)

It is less efficient than other systems.

b)

It is more prone to leaks.

c)

Care must be taken when installing foul water outlets to ensure the correct system is used.

d)

It cannot be used in residential areas.

17.

What is the purpose of a soakaway in plumbing?

a)

To store clean water for domestic use

b)

To provide a foundation for plumbing structures

c)

To use for isolated downpipes from rain water systems

d)

To heat water for household use

18.

What is the purpose of a gully trap in a drainage system?

a)

To connect different pipe materials below ground

b)

To prevent debris from entering the drainage system

c)

To prevent smells from entering the building

d)

To allow multiple waste pipe connections

19.

What is a waste pipe manifold used for?

a)

To prevent debris from entering the drainage system

b)

To connect different pipe materials below ground

c)

To prevent smells from entering the building

d)

To allow multiple waste pipe connections and avoid crossflow exclusion zones

20.

Where is a long radius bend typically used in a drainage system?

a)

At the top of a soil stack

b)

At the foot of a soil stack

c)

Below ground for connecting different pipe materials

d)

For clearing blockages and maintenance

21.

What is required by the Building Regulations for clearing blockages and maintenance in AGDS pipework?

a)

Gully trap

b)

Waste pipe manifold

c)

Access plugs into soil pipe junctions and waste pipe tees

d)

Multi-fit pipe adapters

22.

What are multi-fit pipe adapters used for?

a)

To prevent smells from entering the building

b)

To allow multiple waste pipe connections

c)

To prevent debris from entering the drainage system

d)

For connecting different pipe materials below ground

23.

What is Weil's disease caused by?

a)

An infection of bacteria from air contaminated by rat urine

b)

An infection of bacteria from water that has been infected by rat urine

c)

An infection of bacteria from soil contaminated by insect waste

d)

An infection of bacteria from food contaminated by rodent droppings

24.

How can Weil's disease be transmitted to humans?

a)

Through consumption of contaminated food

b)

Through contact with infected water on open cuts, eyes, mouth or nose

c)

Through inhalation of contaminated air

d)

Through direct contact with rats

25.

What should a plumber always wear when working on used soil stacks and WCs to protect against health risks?

a)

Safety goggles

b)

Face mask

c)

Rubber gauntlets

d)

Steel-toed boots

26.

What is hepatitis commonly caused by in the context of plumbing work?

a)

Exposure to toxic chemicals

b)

Coming into contact with human waste and poor personal hygiene

c)

Working in extreme temperatures

d)

Using outdated plumbing equipment

27.

What should a plumber do to prevent contracting hepatitis?

a)

Wear safety goggles at all times

b)

Keep tools clean and sanitized

c)

Be up to date with hepatitis A immunisations

d)

Avoid working in confined spaces

28.

What is dermatitis in the context of plumbing work?

a)

A type of muscle strain from heavy lifting

b)

A viral infection similar to hepatitis

c)

A skin inflammation caused by contact with irritants

d)

A respiratory condition due to dust inhalation

29.

How can a plumber prevent dermatitis?

a)

By taking regular breaks during work

b)

By using barrier cream, wearing gloves, and reading the COSHH data sheets

c)

By ensuring proper ventilation in the work area

d)

By using only stainless steel pipes

30.

What should be written into the risk assessment of the job when dealing with a cast iron soil stack?

a)

The color of the soil stack

b)

The manufacturer's details

c)

The risks associated with the job

d)

The time it will take to complete the job

31.

How does the weight of each section of a cast iron soil stack influence the job?

a)

It determines the color of the paint to be used

b)

It influences the subsequent choice of equipment to be used

c)

It affects the temperature at which the work should be done

d)

It changes the plumbing regulations to be followed

32.

What is the minimum internal diameter (ID) required for internal condensate drainage pipework?

a)

22mm

b)

19mm

c)

45mm

d)

25mm

33.

What should be the minimum fall per metre for the internal condensate drainage pipework?

a)

45mm

b)

22mm

c)

19mm

d)

25mm

34.

What type of pipe should be used for a suitable permanent connection to the foul waste pipe?

a)

Metal pipe

b)

Flexible hose

c)

Plastic pipe

d)

Copper pipe

35.

Where should the condensate drainage pipe ideally be terminated?

a)

Outside the building

b)

At a suitable internal foul water discharge point

c)

Directly into a rainwater gutter

d)

Into a portable container

36.

What is the required minimum condensate seal of a trap incorporated into the boiler, if a visible air break and trap are not required?

a)

19mm

b)

25mm

c)

75mm

d)

100mm