NEW
Font size
Worksheets2vlm
Total questions: 67
Worksheet time: 3hrs 21mins
Which team has 12 core teams and 6 noncore teams?
Command and control, intelligence, surveillance and reconnaissance (C2ISR)
Demand force team (DFT)
Agile combat support (ACS)
Space cyber
Which team or organization cannot generate capability using standard United States Air Force (USAF) battle rhythm?
Mobility
Special Operations
Joint task force
Demand force team
What manages the force battle rhythm?
Air and Space Expeditionary Force (AEF) force generation construct
AEF schedule.
AEF timeline.
AEF cycle.
Which manpower authorizations must be postured in the unit type code (UTC) availability?
All authorizations.
All authorizations not in training units.
Only authorizations for combat personnel.
Any authorization that is ready to deploy.
Specific unit type codes (UTC) normally eligible to deploy, given a certain set of deployment conditions, and assuming full readiness, are considered
available to deploy
ready to deploy
Nondeployable
Postured
Which type of unit type code (UTC) record indicates it is sufficiently manned, trained, and equipped to meet the mission capability (MISCAP) of the UTC?
Available to deploy.
Ready to deploy.
Nondeployable.
Postured.
Posturing codes, or P-codes, indicate unit type code (UTC) records are generally available
for weapons training exercises
during peacetime operations only
during normal rotational operations
for short tour and remote assignment selection.
Which posturing code (P-code) indicates the minimum number of unit type code (UTC) requirements to support critical home station operations?
AP
AX
DW
DX
Who provides the assessment status of each unit type code (UTC) in the Air and Space Expeditionary Force (AEF) library?
Supervisors
Unit Commanders
Major Commands (MAJOCOM)
Headquarters, United States Air Force (HAF)
Unit type code (UTC) assessments are based on all of the following aspects of the UTC except the
ability to perform the capability defined by the mission capability (MISCAP) statement.
capacity to fulfill the complete equipment requirements.
capacity to fulfill the standard manpower requirements.
ability to be tailored.
Which Air and Space Expeditionary Force (AEF) Reporting Tool (ART) report provides the current status of the unit type codes (UTC), including the commander’s comments and also focuses on retrieving the UTC/availability line numbers (ALN) status, with applicable remarks?
UTC report
Legacy extract report.
Major command (MAJCOM) compliance report.
Manpower and Equipment Force Packaging System (MEFPAK) listing.
Which functional level is responsible for associating, tracking, and managing personnel and equipment in unit type codes (UTC) and assigning them to the proper Air and Space Expeditionary Force (AEF)?
Individual personnel.
Installation deployment officer (IDO).
Unit commander or equivalent level supervisor.
Wing commander or equivalent level supervisor.
Which Air and Space Expeditionary Force (AEF) Reporting Tool (ART) training requirement is considered key to successfully managing an installation ART program?
Understanding ART unit type code (UTC) symbols and descriptions
Accessing and updating user roles.
Using rapid updates.
Navigating ART.
which agency has the responsibility for organizing, training, and equipping aerospace forces to meet combatant commander (CCDR) requirements?
Lead wing.
Headquarters, United States Air Force (HAF).
Air Force major command (MAJCOM)
Air Force Personnel Center Directorate of Air and Space Expeditionary Force (AEF)Operations
Which Air and Space Expeditionary Force (AEF) online tool provides personnel support for contingency operations (PERSCO) teams the capability to report deployment discrepancies to individual home units?
AEF Reporting Tool (ART).
Air Force Reporting Instructions Tool (AFRIT).
Personal deployment preparedness tool (PDPT).
Deployment Processing Discrepancy Reporting Tool (DPDRT).
The chief of staff Air Force (CSAF) acts as a “global force provider” fulfilling the responsibility to support combatant commanders through the Air and Space Expeditionary Force (AEF) by
conducting operational readiness inspections (ORI) that include evaluating the deployment capability of their active and gained forces
developing training curriculum for installation deployment officers (IDO) to include cascade training for unit deployment managers (UDM).
coordinating and scheduling United States Air Forces forces to provide combat-ready assigned, apportioned, and allocated forces as spelled out in global force management (GFM) guidance.
ensuring all Air Force budget submissions include provisions to attain and maintain the optimum deployment capability of air forces
Which functional area is responsible for establishing broad, Total Force (active duty, Air Reserve Component, civilian) personnel and manpower policy and guidance?
Vice Chief of Staff, United States Air Force.
Deputy Chief of Staff, Personnel.
Deputy Chief of Staff, Logistics, Installations and Mission Support
Deputy Chief of Staff for Air, Space and Information Operations, Plans and Requirements.
Which agency or individual oversees and manages the unit type code (UTC) shortfall/reclama process when taskings must be reassigned between major commands (MAJCOM)?
Supported command.
Chief of Staff, United States Air Force (CSAF)
Vice Chief Staff, United States Air Force (VCSAF).
Air Force Personnel Center Directorate of Air and Space Expeditionary Force Operations (AFPC/DP3).
This agency develops plans and procedures to support personnel processing for military, Department of Defense, contract and other civilians, and family members during contingency, wartime, exercise, and emergency operations.
Supported command.
Air Force component command.
Supporting Command Directorate of Logistics.
Air Force Personnel Center Directorate of Air and Space Expeditionary Force Operations (AFPC/DP3).
At base level, the wing/installation commander is responsible to
draft operations plans (OPLAN) for presidential approval.
ensure the installation is capable of supporting deployment operations.
issue combatant commanders’ estimate to the Secretary of Defense (SECDEF).
maintain oversight of air terminal operations in support of deployment and redeployment operations.
Which commander is responsible for ensuring the installation is capable of supporting deployment operations, and has the responsibility of designating an installation deployment officer (IDO) and alternates?
LRS
Mission Support Group (MSG)
Wing/Installation
Major Command (MAJCOM)
Which agency has a permanent member on the installation deployment readiness cell (IDRC) staff?
Medical personnel
Maintenance personnel.
Traffic management flight (TMF).
Installation personnel readiness (IPR) personnel.
The installation deployment readiness cell (IDRC) staff coordinates with which agency or individual to ensure appropriate units are tasked in the Deliberate and Crisis Action Planning and Execution Segments (DCAPES), making corrections as necessary?
Installation personnel readiness (IPR).
Unit deployment manager (UDM).
Logistic plans personnel.
Manpower.
Which agency or individual acts for the installation/wing commander in directing, controlling, coordinating, and executing deployments and installation exercises?
Installation personnel readiness (IPR).
Unit deployment manager (UDM).
Installation deployment officer (IDO).
Logistic readiness squadron (LRS) commander.
Which individual or agency is responsible for reporting the status of unit type codes (UTC)in the Air and Space Expeditionary Force (AEF) Reporting Tool (ART)?
Installation deployment officer (IDO)
Installation personnel readiness (IPR)
Logistics plans flight.
Unit commander.
Unit commanders have the responsibility to appoint unit cargo increment monitors inwriting to which individual or agency?
Headquarters Air Force (HAF).
Host logistics plans function.
Mission support group commander.
Installation deployment officer (IDO).
Participants in the deployment processing working group (DPWG) include logistics plans, transportation,
legal, personnel, communications, medical, unit deployment managers (UDM), and tenant units.
civil engineering, personnel, communications, medical, UDMs, and tenant units.
manpower, personnel, communications, civil engineering, UDMs, and tenant units.
manpower, personnel, communications, medical, UDMs, and tenant units
Unit type codes (UTCs) are only represented by a
3-character numeric code.
5-character numeric code.
3-character alphanumeric code.
5-character alphanumeric code.
The assignment of unit type code (UTC) categories is based on
functional areas
manpower position numbers.
operation plan (OPLAN) mission requirements
Chief of Staff of the Air Force (CSAF) determination.
The process of adding a unit type code (UTC) to the Manpower and Equipment Force Packaging (MEFPAK), building the manpower and or equipment detail, and getting the UTC added to the type unit characteristics (TUCHA) is known as
registration
UTC development.
pilot unit reporting.
major command (MAJCOM) reporting.
Unit type codes (UTC) should be developed so that the entire UTC can be
fragmented
tasked to deploy
tasked to stay at home station.
tasked from a single organization
What is considered a capability within a unit type code (UTC) that commanders must deploy as a single entity?
Registration
UTC development
Deployment echelon.
Major command (MAJCOM) reporting.
The pilot unit conducts a logistics detail (LOGDET) validation every
3 years
2 years
year
6 months
Which type of report must be generated prior to reporting logistics details (LOGDET) to the major command (MAJCOM)?
Logistics Force Packaging System (LOGFOR) database verification (DB Verify) report.
Manpower and Equipment Force Packaging (MEFPAK) Summary Report
Unit type code (UTC) Summary Report.
Wartime Aircraft Activity Report.
Which type of unit uses unit type codes (UTC) developed by a pilot unit?
Nonpilot unit
Tenant unit.
Host Unit
G-unit
What is indicated when manpower types a “P” in the “Task Stat” field during the wing-level verification process?
A reclama was established for a given tasking
The installation is nondeployable.
The tasking cannot be filled by that base.
The tasking is valid for that base and unit.
What is compared when the Air Force verification capability (AFVC) process is conducted to find requirements that have been conflicted and/or contain erroneous data?
Information between Air and Space Expeditionary Force (AEF) Reporting Tool (ART) and Status of Resources and Training System (SORTS).
Information between Deliberate and Crisis Action Planning and Execution Segments (DCAPES) and the Joint Operation Planning and Execution System (JOPES).
Major command (MAJCOM) personnel assignments against operation plan (OPLAN) requirements.
Personnel assigned against personnel authorized.
Which deployment function/system provides monitoring for deploying cargo and personnel from origin to destination?
In-transit visibility (ITV).
Logistics module (LOGMOD).
Installation deployment plan (IDP).
Global Decision Support System (GDSS).
What type of information source is required for planners to view an asset’s status in the Global Transportation Network (GTN) as it goes from origin to destination?
Emails.
Paperwork.
Movement data.
Social security numbers.
Who owns data and has overall control of the development, distribution, security level, maintenance, and overall quality in the time-phased force and deployment data (TPFDD)?
Installation deployment officer (IDO).
Logistic plans and installation deployment officer (IDO).
Supported commands and designated functional manager.
Installation commander and supported commands.
What are the unique requirements referred to as in the time-phased force and deployment data (TPFDD) development used by the planners at the support component headquarters?
Unit type codes (UTC)
Unit indicator codes (UIC).
Unit manning documents (UMD).
Unit line numbers (ULN).
What is the critical part of time-phased force and deployment data (TPFDD) management?
Accuracy.
Accuracy and timeliness.
Movement and unit type codes (UTC).
Timelines and unit line numbers (ULN).
During the time-phased force and deployment data (TPFDD) movement timing requirements planning the installation deployment officer (IDO) first needs to make decisions based on
an analysis of the TPFDD available to load dates (ALD) and required deliver dates (RDD) against the strategic airflow and unit type code (UTC) movement priority.
the type of weapons and mobility bags.
an analysis of the Air and Space Expeditionary Force (AEF) Reporting Tool and the logistics module (LOGMOD).
an analysis of the TPFDD aerial port of embarkation (APOE) and earliest arrival date (EAD) against the strategic airflow and UTC movement priority.
Which question is not part of the movement timing requirements?
What is the aerial port of embarkation (APOE) for the personnel/equipment leaving the base?
Is the origin the APOE or will movement to an APOE be required?
What is the mode source of the mobility bags being shipped?
Is the APOE a military installation or international airport?
Which document is most familiar to logistics planners and is a product of time-phased force and deployment data (TPFDD) development?
Deployment schedule of events (DSOE).
Time-phased force and deployment list (TPFDL).
Geographical location file (GEOFILE).
Type unit characteristics (TUCHA) file.
Who uses the Joint Operation Planning and Execution System (JOPES) in the Joint Planning and Execution Community (JPEC)?
Planners and commanders at all levels
Installation deployment offices (IDO).
Major commands (MAJCOM).
Unit commanders.
What do planners use to create and modify a time-phased force and deployment data (TPFDD) file and build a force list?
Joint Operation Planning and Execution System (JOPES) edit tool (JET).
Manpower and Equipment Force Packaging System (MEFPAK).
Single Mobility System (SMS).
Rapid query tool (RQT).
What defines the local processes, procedures, infrastructure, and resources used to deploy forces?
Air and Space Expeditionary Force Reporting Tool (ART).
Time-phased force and deployment data (TPFDD).
Installation deployment plan (IDP).
Base support plan (BSP).
What units are included in the installation deployment plan (IDP)?
Tenants, institutional forces, and associate units.
Public affairs and force support squadron
Airman family readiness center.
Major command (MAJCOM) and Air Force Installation and Mission Support Center (AFIMSC).
What type of resources are include in the installation deployment plans (IDP) for forward presence forces?
Time-phased force and deployment data (TPFDD).
Base support plan.
Host nation.
United Nation.
Which function is not part of the deployment control center (DCC) staff?
Installation deployment officer (IDO).
Logistics plans.
Personnel.
Services.
Which position within the cargo deployment function (CDF) identifies possible bottlenecks and works with CDF personnel, units, and the deployment control center (DCC) to ensure cargo is processed on time?
Final load planner
Cargo in-check
Quality control.
Controllers.
Which equipment item is not required in the cargo deployment function (CDF)?
Fixed or portable scales
Shoring material.
Portable lighting.
Infrared scanners
Which is described as an organized processing activity designed to ensure deploying personnel are properly accounted for and prepared for deployment?
Passenger terminal
Personnel readiness unit (PRU).
Deployment control center (DCC)
Personnel deployment function (PDF).
The personnel deployment function (PDF) is charged with maintaining accountability of deploying personnel from the time they arrive at the processing line until they
depart the PDF for the aircraft.
arrive at the aggregation point.
leave home station
are otherwise directed by the troop commander.
Which is a required personnel deployment function (PDF) station?
Emergency data.
Identification.
Medical.
Finance.
Which function is responsible for coordinating all unit level deployment activities, to include the receipt of taskings and preparation of cargo and personnel for deployment?
Unit deployment control center (UDCC).
Personnel deployment function (PDF).
Cargo deployment function (CDF).
Deployment control center (DCC).
Which individuals or functions receive initial training by the installation deployment officer (IDO) within 90 days of assignment?
Installation Deployment Readiness Cell (IDRC).
Unit deployment manager (UDM).
Unit commanders.
Personnel representative.
Which concept is accomplished when unit type codes (UTC) are collected or grouped together at locations in the United States or overseas?
Aggregation
Reception
Integration.
Onward movement.
What is essential to accurate accountability and employment of incoming forces?
Reception, staging, onward-movement and integration (RSOI).
Reception control center (RCC).
Command and control (C2).
Integration.
Which agency or group accounts for all arriving and departing personnel?
Personnel support for contingency operations (PERSCO).
Reception control center (RCC).
Military personnel flight (MPF).
Logistics planners
Which entity has the responsibility for preparing, executing unit employment, and developing employment reception?
Cargo reception function (CRF).
Military personnel flight (MPF).
Reception control center (RCC).
Advanced echelon (ADVON).
Which process is described as the transfer of a unit, an individual, or supplies deployed in one area to another area or home station?
Redeployment.
Deployment
Posturing
Sourcing
Redeployment is not the same as deployment, but is normally
faster than deployment
slower than deployment.
similar to a deployment
reverse of a deployment
Which function is responsible for collecting deployment documents?
Cargo Deployment Function (CDF).
Deployed logistics planners.
Personnel representative.
Cargo representative.
Which agency is not included as a member of a redeployment assistance team (RAT)?
Personnel support for contingency operations (PERSCO).
Public affairs (PA).
Contracting
Services.
Which unit is responsible for redeploying all the units at deployed sites with multiple units?
Last
First
Lead
Oldest
