The responsibilities whilst working as an architect in Ireland (which you need to adhere to when you are an architect) are defined in which document?
The RIBA Code of Professional Conduct
The RIAI Architect's Code of Conduct
The RIAI Code of Good Behaviour
The RIAI Job Book
Which RIAI publication, when worked to will ensure you run your practice and projects correctly and successfully?
The RIAI Good Practice Guide
The RIAI Book of Good Practice
The RIAI Job Book
The RIAI Good Management Guide
When working on government projects eg Council projects, you are said to work in what type of 'Practice'
(a)
When working for individual clients eg. houses for individual clients you are said to work in what type of practice?
(a)
Draw the graph of what an architects life can be - plotting years (x axis) against employment (ie either in a job or not or how much money you are getting)

How many Work Stages are there in a RIAI Agreement between Architect and Client for Domestic Work
3
4
5
6
Methods of Tendering for Construction Projects in Ireland
When it comes to construction projects in Ireland, there are several methods of tendering that are commonly used. These methods include open tendering, selective tendering, and negotiated tendering.
Open tendering is a process where the project is advertised publicly, allowing any interested contractor to submit a bid. This method is often used for smaller projects or projects where transparency is crucial.
Selective tendering, on the other hand, involves inviting a pre-selected list of contractors to submit bids for the project. This method is typically used for larger projects or projects that require specialized expertise.
Finally, negotiated tendering is a more collaborative approach where the client negotiates directly with a single contractor. This method is often used for complex projects or projects with unique requirements.
What does open tendering allow for publicly advertised projects?
Only selected contractors to submit bids
Any interested contractor to submit a bid
Government agencies to submit bids
No contractors to submit bids
What is negotiated tendering?
A competitive approach where multiple contractors bid for a project
A collaborative approach where the client negotiates directly with a single contractor for complex or unique projects
A method where the client selects a contractor based on pre-determined criteria without negotiation
A process where the client carries out the construction work themselves
What is the purpose of selective tendering in construction projects?
To invite all contractors to bid on projects
To invite pre-selected contractors to bid on projects
To exclude contractors from bidding on projects
To randomly select contractors to bid on projects
In Ireland, the roles of the Design Certifier and Assigned Certifier are integral to ensuring compliance and safety in construction projects. The Design Certifier is responsible for overseeing the design process, ensuring that it complies with relevant regulations and standards. They review and certify the design documents, affirming that they meet legal requirements and adhere to best practices. On the other hand, the Assigned Certifier takes charge of overseeing the construction phase. They ensure that the construction work aligns with the approved design and regulatory standards. The Assigned Certifier coordinates inspections, monitors progress, and ultimately issues the Certificate of Compliance on Completion, affirming that the finished building complies with building regulations and planning permissions. Both roles play crucial parts in safeguarding the quality and integrity of construction projects in Ireland.
What is the main responsibility of the Assigned Certifier during the construction phase?
Ensuring alignment with approved design and regulatory standards
Managing the budget of the project
Selecting the construction materials
Handling the marketing of the project
What is the main responsibility of the Design Certifier?
Ensuring compliance with regulations and standards
Managing construction schedules
Handling financial aspects of the project
Supervising the construction phase
What are the crucial roles in safeguarding the quality and integrity of construction projects in Ireland (during construction & completion)?
Design Certifier
Assigned Certifier
Quantity Surveyor
Architect
What professional is responsible for health and safety during the design phase of a construction project (initials)
(a)
What professional is responsible for health & safety during the construction phase of the project (initials)
(a)
What do the last 2 acronyms stand for?
PSDP =
PSCS =
A Quantity Surveyor (QS) plays a multifaceted role within the construction industry, primarily focused on managing costs and financial aspects of construction projects. Their responsibilities include:
Cost Estimation: QSs assess the costs involved in a construction project, including materials, labor, and overheads. They use their expertise to provide accurate estimates to clients and stakeholders.
Budget Management: QSs help in developing and managing budgets for construction projects. They monitor costs throughout the project lifecycle, identifying and addressing any deviations from the budget.
Procurement: QSs advise on procurement strategies and help in the selection of contractors and suppliers. They may also negotiate contracts and agreements to ensure favorable terms for their clients.
Contract Administration: QSs assist in drafting contracts and administering them throughout the project. They assess payment claims, variations, and disputes, ensuring that all parties adhere to contractual obligations.
Value Engineering: QSs seek ways to optimize project value while minimizing costs. They may propose alternative materials or construction methods that offer cost savings without compromising quality.
Risk Management: QSs identify and analyze potential risks associated with a project, such as cost overruns or delays, and develop strategies to mitigate these risks.
Final Accounts: QSs prepare and negotiate final accounts at the end of a project, reconciling actual costs against budgeted amounts and ensuring that all financial matters are resolved.
Overall, Quantity Surveyors play a vital role in ensuring that construction projects are completed within budget and to the required quality standards, while also providing valuable expertise in cost management and financial control throughout the project lifecycle.
What are some key responsibilities of a Quantity Surveyor in the construction industry?
Optimizing project value and minimizing costs through value engineering
Identifying and mitigating project risks (financial)
Preparing final accounts at the end of a project
All of the above
What role do Quantity Surveyors play in construction projects?
Ensuring timely completion of projects
Providing legal advice to contractors
Managing human resources on site
Ensuring projects are completed within budget and to required quality standards
A statute of limitations is a law that defines the maximum amount of time in which parties involved in a dispute must initiate legal proceedings following an alleged offense.
In Ireland, the statute of limitations for construction projects typically falls under the rules outlined in the Statute of Limitations Act 1957, as amended by subsequent legislation.
Generally, the statute of limitations for construction-related claims is six years from the date of completion or from the date when the alleged defect became known or should have become known, whichever is later. However, it's essential to note that specific circumstances may affect the limitation period, and legal advice should be sought for precise guidance.
What should be done for precise guidance on limitation periods for construction-related claims in Ireland?
Consult a construction expert
Seek legal advice
Refer to online forums
Ignore the limitation period
What typically governs the statute of limitations for construction projects in Ireland?
Statute of Limitations Act 1957
Building Regulations Act 1997
Construction Contracts Act 2013
Planning and Development Act 2000
What is the statute of limitations for construction-related claims in Ireland?
Two years
Four years
Six years
Eight years
What is the ISO standard for Building Information Modelling (BIM) that projects adhere to?
ISO 19450
ISO 19550
ISO 19650
ISO 19750
ISO 19850
A Fire Safety Certificate (FSC) is a document issued by the local building control authority that confirms compliance with the fire safety requirements outlined in the Building Regulations (Part B) . It is a legal requirement for certain types of buildings before construction or major modifications can commence.
What is a Fire Safety Certificate (FSC)?
A document issued by the local building control authority confirming compliance with fire safety requirements
A permit to start a fire in a controlled environment
A certificate for fire extinguisher training
A license to conduct fire drills
What is the purpose of a Fire Safety Certificate (FSC)?
To ensure compliance with building regulations
To provide insurance coverage for the building
To determine the color scheme of the building
To regulate the use of elevators in the building
A Disabled Access Certificate (DAC) is a document issued by the local building control authority that confirms compliance with Part M of the Building Regulations. Part M relates to accessibility and facilities for people with disabilities within buildings.
A Disabled Access Certificate confirms compliance with Part (a) of the Building Regulations.
At the end of 5 successful years studying Architecture you can call yourself a /an
(a)
Are the questions and answers of this quiz clear? Is there anything you'd like me to go through (topic in next slide...
Yes everything really clear
No need for clarifications
There are some parts I'm not clear on - I'll give you these in next question...
There are large parts that I'm not clear on - I'll ask in next question...
I'm not clear on the following...