wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

L3 YR2 Revision 5 (Electrical)

Total questions: 34

Worksheet time: 17mins

Name
Class
Date
1.

A central heating system pump fails to start when the supply is switched on and it hums. The windings have been tested and have the correct continuity. What is the most likely cause of this?

a)

break in the Neutral conductor

b)

failure of the start capacitor

c)

break in the cpc

d)

Protective device has operated

2.

While installing an electric water heater, it is noted that the TN-C-S supply has 25mm meter tails and 6mm main protective bonding conductors. What is the correct permitted size for the protective bonding?

a)

is the correct permitted size

b)

needs upgrading to 16mm

c)

needs upgrading to 10mm

d)

needs upgrading to 25mm

3.

HSE G38 requires all test leads to be fused. What should be the fuse rating?

a)

50 mA

b)

500 mA

c)

1.0 A

d)

5.0 A

4.

A mid-position valve fails to operate when the cylinder thermostat calls for operation. Which tool is most suitably used to test the valve components?

a)

insulation resistance tester

b)

RCD tester

c)

low resistance ohmeter

d)

neon screwdriver

5.

The purpose of main protective bonding is to?

a)

reduce earth fault loop impedance

b)

reduce potential differences

c)

reduce potential differences

d)

increase earth fault loop impedance

6.

When should a visual inspection take place?

a)

upon completion

b)

during installation

c)

when the supply is switched on

d)

during and upon completion of the installation

7.

The most suitable instrument to check the resistance value of the windings of a single phase pump motor would be?

a)

low resistance ohmeter

b)

insulation resistance tester

c)

earth electrode resistance tester

d)

RCD tester

8.

A 30 mA RCD can be used as additional protection in the event of failure of basic protection with a test current of 150 mA the device should trip within?

a)

300 ms

b)

0.4 seconds

c)

40 ms

d)

4 seconds

9.

Which of the following would NOT be considered as part of functional testing?

a)

isolate switch on and off

b)

RCD test button operates the device

c)

thermostats operate correctly

d)

circuit breakers operate under short circuit conditions

10.

Upon completion of the project, the mechanical services contractor shall hand over which of the following?

a)

all bills of quantities, specifications, and payment certificates

b)

electrical installation certificate, schedule of inspections, schedules of test results, and equipment operational and maintenance manuals

c)

original installation drawings

d)

a copy of the Construction (Design and Management) Regulations

11.

Which of the following protective devices can safely interrupt the highest prospective fault current?

a)

BS 3036 rewireable fuse

b)

BS 88 high breaking capacity

c)

BS1362 cartridge fuse

d)

BS EN 60898 circuit breaker type 2

12.

A permanent warning notice must be fixed at or near the point of connection of every earthing conductor to an earth electrode. Which one of the following MUST be displayed on the notice?

a)

Earth bonding danger

b)

Safety Electrical Earth - Do Not Remove

c)

Electrical Safety Connection

d)

Safety Electrical Connection - Do Not Remove

13.

The minimum size of main protective bonding Conductor used within a TN-C-S system would be?

a)

4 mm

b)

6 mm

c)

10 mm

d)

16 mm

14.

When isolating certain pumps used in central heating systems, a small electrical charge may remain in the equipment and circuit even though the circuit is safely isolated. Which of the following components causes this effect?

a)

brushes

b)

neon indicators

c)

capacitors

d)

cable runs

15.

When making an addition to an existing electrical installation the maximum demand should be?

a)

determined by the supply company

b)

re-calculated by summing up the ratings of the circuit breakers

c)

obtained from the customer

d)

re-calculate and diversity taken into account

16.

Which one of the following circuit breaker ratings would be suitable to supply a single-phase 230v 6 KW water heater?

a)

20 A type B

b)

32 A type B

c)

40 A type B

d)

63 A type B

17.

The outer sheath of a twin and cpc cable is designed to provide?

a)

double insulation

b)

mechanical protection

c)

additional conductor insulation

d)

protection against excessive ambient temperatures

18.

In a standard fused connection unit the type of cable termination for the supply cable are usually?

a)

strip connectors

b)

claw washer type termination

c)

screwhead nut and washer termination

d)

pillar terminals

19.

Which of the following electrical water heating appliances does NOT need to be on its own electrical circuit?

a)

9 KW instantaneous shower unit

b)

12 litre 2 KW storage type heater

c)

4 KW instantaneous water heater

d)

18 litre 2 KW storage type heater

20.

A fault requires rectification on the central heating control wiring in an occupied rented dwelling. Which one of the following is the MOST reliable source of information to find what the fault is?

a)

the owner

b)

the tenant

c)

the supply company

d)

the boiler manufacturer

21.

Boiler manufacturers fault finding charts are usually found in the manufacturers?

a)

product performance specification

b)

installation specification

c)

operation and maintenance instructions

d)

product information sheet

22.

Which of the following pieces of test equipment would be used to check the continuity of the motor windings of an electrically operated mid position valve?

a)

insulation resistance tester

b)

earth electrode tester

c)

phase connection meter

d)

low resistance ohmeter

23.

A pump motor continually trips its overload after running for several minutes. The most suitable test instrument to check then current being drawn is?

a)

ammeter

b)

multi-meter

c)

voltage indicator

d)

RCD tester

24.

The Electricity at Work Regulations requires test equipment to be checked and records kept. Which one of the following methods of checking instrument accuracy is NOT usually carried out by operatives?

a)

comparison against existing instruments

b)

checking against known resistance values

c)

calibration and certification

d)

proprietary checkbox method

25.

When chasing walls or chopping in flush accessory boxes, what precautions should be taken to protect the customer's property?

a)

dust sheets should be put down on the floor and any furniture unable to be moved covered

b)

plaster and brick debris should always be swept off the carpets before leaving

c)

after chopping out the plaster and brick debris should be cleared away from floor covering

d)

the area should be taped off by the customer so that work can be completed safely

26.

When using a portable electric drill in a wet location, reducing the risk of electric shock is best achieved by using a?

a)

110v drill supplied from a transformer

b)

class 11 double insulated 230v drill

c)

battery operated drill

d)

230v drill protected by an RCD

27.

What is the maximum recommended over-current protective device rating for a final ring circuit?

a)

16A

b)

20A

c)

32A

d)

45A

28.

What type of cable is needed for supplying a typical domestic immersion heater?

a)

60 degree thermoplastic round cable

b)

70 degree thermoplastic flat profile cable

c)

90 degree thermosetting armoured cable

d)

90 degree thermosetting rubber cable

29.

What is a relay, an electromechanical device, designed to do?

a)

switch a circuit off if overloaded

b)

protect electronic components from over voltage and over current surcharges

c)

amplify or reduce voltages within an electrical circuit

d)

open and close electrical contact when the relay coil is energised

30.

What type of board do equipment manufacturers typically mount electronic equipment on?

a)

tag board

b)

pcb

c)

matrix board

d)

pccb

31.

The provision and use of work equipment Regulations requires equipment used on a construction site to be maintained in good order. The duty is placed on the?

a)

site manager

b)

employee

c)

user

d)

employer

32.

Refer to the following activities. Which one would NOT result in the issue of a minor works certificate?

a)

replacing an existing consumer unit

b)

adding a fuse connection unit to an existing circuit

c)

replacing a damaged socket outlet

d)

replacing central heating control wiring

33.

What type of electricity supply would be supplied to a typical domestic dwelling?

a)

400v 3 phase 4 wire a.c.

b)

240v single phase d.c.

c)

400v 3 phase 3 wire a.c.

d)

230v single phase a.c.

34.

The consumer unit is provided at the installation intake point in order that?

a)

The installation may function without the meter reading useage

b)

The installation can be divided into circuits

c)

under voltage protection is provided

d)

class 1 and class 2 electrical equipment may be used within the installation