6035 | Drainage systems | LO1.1

Total questions: 13

Worksheet time: 7mins

Name
Class
Date
1.

The section within the red markings is known as:

a)

Soil pipe

b)

Vent pipe

c)

Stub stack

d)

Secondary ventilated stack

2.

Which two regulations must all drainage systems comply with within England and Wales?

a)

Part L

b)

Part G

c)

Part H

d)

Part P

3.

The British Standard number for sanitary installations is:

a)

BS 6700

b)

BS 4488

c)

BS EN 442

d)

BS 6465

4.

In order to be compliant with Part H, the depth of a water seal in a trap should not be less than:

a)

25mm

b)

40mm

c)

50mm

d)

75mm

5.

The maximum gradient of all discharge branches is:

a)

b)

c)

2.5°

d)

1.8°

6.

The maximum length of pipe that a WC should be positioned from the primary ventilated stack is?

a)

1.7m

b)

3.0m

c)

6.0m

d)

10.0m

7.

If a basin was placed further away than 1.7m from the primary stack, what action should be followed?

a)

Inform the customer that the job cannot be completed.

b)

Inform the local authority of a breach of Building Regulations Part H.

c)

Reposition the basin within the 1.7m tolerance.

d)

Replace the run of pipe for a 40mm pipe.

8.

If the situation arises where you have multiple appliances connected to a single discharge pipe, what size should the pipe circled be?

a)

32mm

b)

40mm

c)

50mm

d)

75mm

9.

What is the lowest connection to the soil stack from the drain invert level if the property is a low-rise building?

a)

100mm

b)

450mm

c)

750mm

d)

1000mm

10.

To prevent crossflow, what is the minimum distance allowed to install another connection is?

a)

200mm

b)

150mm

c)

100mm

d)

0mm

11.

The purpose of an intumescent collar is:

a)

Clipping the interval soil pipe preventing water hammering

b)

Restricting flames and smoke from travelling from one area to another

c)

Temporary fixes which prevents foul smells from exiting the soil pipe

12.

The use of a waste manifold would be:

a)

External, at the base of the soil stack

b)

Internal, commercial kitchens

c)

Internal, bathrooms

d)

Internal, at the base of the soil stack

13.

To allow for clearing blockages, access should be provided:

a)

At every appliance

b)

At every connection to the soil stack

c)

After the long radius bend

d)

Above the highest appliance