Above Ground Drainage

Total questions: 37

Worksheet time: 19mins

Name
Class
Date
1.

Which part of the building regulations deals with drainage and waste disposal?

a)

Part G

b)

Part H

c)

Part N

d)

Part A

2.

What does Building Regulations part G cover?

a)

Drainage and waste disposal

b)

Electrical safety

c)

Sanitation, hot water safety, and water efficiency

d)

Fire safety

3.

In which regions are the Building Regulations statutory requirements for drainage systems?

a)

Scotland and Wales

b)

England and Wales

c)

Northern Ireland and Scotland

d)

England and Scotland

4.

What do drainage pipework systems take out of the dwelling?

a)

Air and dust

b)

Solid and liquid wastes

c)

Food and water

d)

Light and sound

5.

Why must drainage pipework systems be done safely and hygienically?

a)

To save money

b)

To avoid any health problems

c)

To make the house look nice

d)

To keep the pipes clean

6.

Where is the waste product discharged after going through a trap?

a)

Into the garden

b)

Into the kitchen sink

c)

To a soil stack and underground sewer

d)

Into the attic

7.

What is the purpose of the vent pipe in a soil stack?

a)

To allow air to enter the system to operate at atmospheric pressure

b)

To carry waste water out of the dwelling

c)

To prevent water from entering the system

d)

To filter foul air from the system

8.

What could happen if the pressure in the vent pipe varies?

a)

It could lead to trap seal loss, allowing foul air to enter the dwelling

b)

It could cause the system to overflow

c)

It could stop the system from operating

d)

It could cause the pipes to burst

9.

What is the function of the soil pipe in a soil stack?

a)

To bring fresh air into the building

b)

To take all the effluent away from the building

c)

To provide water supply to the building

d)

To support the building structure

10.

What must all systems comply with according to the document?

a)

Part A and BS EN 12056

b)

Part B and BS EN 12056

c)

Part H and BS EN 12056

d)

Part C and BS EN 12056

11.

What does BS EN 12056 cover?

a)

Design, installation, testing, and maintenance

b)

Design, construction, and demolition

c)

Installation, painting, and cleaning

d)

Testing, painting, and maintenance

12.

Which standards should appliances, pipes, and fittings comply with?

a)

American standards

b)

European standards

c)

Asian standards

d)

Australian standards

13.

What should be provided for all water supply points inside the building to prevent flooding?

a)

Heating

b)

Ventilation

c)

Drainage

d)

Insulation

14.

What should be installed with appliances connected to the drainage system to prevent foul air from entering the building?

a)

A filter

b)

A pump

c)

A trap

d)

A valve

15.

What is the most common type of domestic stack?

a)

Secondary ventilated stack

b)

Primary ventilated stack

c)

Tertiary ventilated stack

d)

Quaternary ventilated stack

16.

Why does a primary ventilated stack not require extra ventilation?

a)

Because it is very small

b)

Because it is very large

c)

Because the discharge branches are closely grouped around the stack

d)

Because it is made of special material

17.

What is the function of the soil stack in a primary ventilated stack system?

a)

To allow pressure fluctuations without affecting the trap seal loss

b)

To provide extra ventilation

c)

To discharge waste directly

d)

To support the structure of the building

18.

What is the maximum gradient that discharge branches should have?

a)

2 degrees

b)

5 degrees

c)

10 degrees

d)

15 degrees

19.

What is the ideal gradient for discharge branches to maintain a self-cleaning velocity?

a)

1 degree

b)

2 degrees

c)

2½ degrees

d)

3 degrees

20.

What does self-cleaning velocity mean?

a)

The liquid flows slowly

b)

The liquid carries the solids as it flows

c)

The liquid stays still

d)

The liquid evaporates quickly

21.

What is the benefit of self-cleaning velocity?

a)

It increases the risk of blockage

b)

It reduces the risk of blockage

c)

It makes the water dirty

d)

It stops the water flow

22.

What should the next pipe size be if an installation exceeds the maximum length stated for a 32mm pipe?

a)

40mm

b)

50mm

c)

32mm

d)

60mm

23.

If multiple appliances are connected to a single discharge pipe, what is the minimum pipe size that should be used?

a)

32mm

b)

40mm

c)

50mm

d)

60mm

24.

What should the next pipe size be if an installation exceeds the maximum length stated for a 40mm pipe?

a)

32mm

b)

40mm

c)

50mm

d)

60mm

25.

What is installed at the base of a soil stack to maintain effluent velocity when changing from vertical to horizontal movement?

a)

A short radius bend

b)

A long radius bend

c)

A straight pipe

d)

A 90 degree connector

26.

What problem did older systems without a long radius bend face?

a)

Increased water flow

b)

Reduced water flow

c)

Problems with compression or back pressure

d)

No problems at all

27.

What alternative connectors might some systems use instead of a long radius bend?

a)

Two 90 degree connectors

b)

Two 30 degree connectors

c)

Two 45 degree connectors

d)

Two 60 degree connectors

28.

Where is it good practice to position a rodding access in a primary ventilated stack?

a)

At the top of the stack

b)

Just above ground level

c)

In the middle of the stack

d)

At the bottom of the stack

29.

Why is it good practice to position a rodding access in a primary ventilated stack?

a)

To allow air to flow

b)

To prevent water from escaping

c)

In case of any blockages

d)

To make the stack taller

30.

What is the lowest connection to the soil stack on low-rise buildings (two storeys) from the drain invert level?

a)

450mm

b)

500mm

c)

600mm

d)

750mm

31.

For buildings up to five storeys, what is the minimum connection to the soil stack from the drain invert level?

a)

450mm

b)

500mm

c)

600mm

d)

750mm

32.

What type of stack is discussed in the document?

a)

Primary ventilated stack

b)

Secondary ventilated stack

c)

Tertiary ventilated stack

d)

Non-ventilated stack

33.

What should the angle or radius be for branch connections with a diameter up to 75mm?

a)

45° angle or 25mm radius

b)

50° angle or 30mm radius

c)

60° angle or 35mm radius

d)

70° angle or 40mm radius

34.

What should the angle or radius be for branch connections with a diameter over 75mm?

a)

45° angle or 50mm radius

b)

50° angle or 60mm radius

c)

55° angle or 70mm radius

d)

60° angle or 80mm radius

35.

What size pipework is used on a bathroom basin?

a)

32mm

b)

40mm

c)

22mm

d)

110mm

36.

What is the purpose of a self-sealing trap?

a)

To prevent foul smelling odor's

b)

it creates a seal and blocks wastage

c)

It prevents rodents getting into the pipework

d)

It reduces the waste pipe down from 32mm to 28mm

37.

What size waste pipe is used on a bath?

a)

32mm

b)

40mm

c)

60mm

d)

35mm