2012 Construction HSC Exam Multiple Choice

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Which of the following is a form of non-verbal communication?

a)

Signage

b)

Telephone

c)

Two-way radio

d)

On-site meeting

2.

What is the main use of a sliding bevel?

a)

To determine plumb

b)

To determine a level surface

c)

To transfer angles and draw lines

d)

To measure the diameter of a circle

3.

What term is used to indicate land height on site plans?

a)

Datum

b)

Contours

c)

Land referencing

d)

Orientation of structures

4.

In the construction industry, which type of plan indicates the position of doors and windows?

a)

Construction

b)

Project

c)

Detail

d)

Site

5.

What is the first safety control measure for a risk?

a)

Work safely

b)

Eliminate the risk

c)

Substitute the equipment

d)

Use Personal Protection Equipment (PPE)

6.

What would be shown on an electrical safety inspection tag placed on an electric drill?

a)

Manufacture date of the drill

b)

Indication of the safe operating voltage of the drill

c)

Licence number of inspector and date of inspection

d)

Identification of correct storage procedures for the drill

7.

Why is it important for an apprentice to have an understanding of recognition of prior learning (RPL)?

a)

To ensure site safety

b)

To gain a white card

c)

To qualify for a first aid certificate

d)

To provide evidence of qualifications

8.

A timber platform is to be built. The materials required and their cost are shown in the

table.
What is the total cost of the materials?

(a)  

9.

What is the main consideration for selecting plant and equipment to be used on a construction site?

a)

The location of storage on site

b)

The skill level or training of the employees

c)

The consideration of environmental factors on site

d)

The effectiveness of the plant or equipment to carry out the operation

10.

What procedures would minimise the impact on the environment of a construction site?

a)

Monitoring the number of employees working onsite

b)

Monitoring the total volume of emissions from plant and equipment

c)

Safe storage of reusable materials in accordance with workplace/company policy

d)

Inservicing employees on the roles and responsibilities of the Environmental Protection Authority (EPA)

11.

How would a measurement of 36 metres be dimensioned on a site plan, where the drawing scale is 1 : 100?

a)

3.6

b)

36

c)

360

d)

36000

12.

What is the purpose of a regulator in the operation of pneumatic tools connected to an air compressor?

a)

To save power during use

b)

To prevent damage to the motor

c)

To reduce the noise level of the motor

d)

To adjust the air pressure to suit the tool being used

13.

What is the area of a triangle with a base of 12.2 m and a perpendicular height of 3200 mm?

a)

19.52 m²

b)

39.044 m²

c)

195 m²

d)

3904 m²

14.

What is the first action that management should take after the identification of asbestos containing materials (ACM) on a construction site?

a)

Notify unions and emergency services

b)

Secure the area and place signs to stop entry

c)

Distribute appropriate personal protection equipment (PPE) to employees

d)

Have trained employees remove materials containing asbestos to designated storage bins

15.

Why is a licence required to operate some power and pneumatic equipment?

a)

To ensure efficient use

b)

To reduce operating costs of the job

c)

To limit the number of workplace injuries

d)

To restrict the number of workers able to operate the equipment