4. Track Tolerances, Track Recordings & Track Inspection

Total questions: 15

Worksheet time: 15mins

Name
Class
Date
1.

The Maximum Variation for Ballastless Track at laying stage is 1435 _____ mm.

a)

± 1

b)

± 2

c)

- 2 to + 1

d)

- 1 to + 3

2.

In Turnouts, difference in Vertical wear between Switch & Stock rail if 4 mm or more

a)

Replacement of Half Set of Switches

b)

Intervention within a month

c)

All the above

3.

Permitted Variations in track parameters are known as Track Tolerances.

a)

True

b)

False

4.

In Laying stage, the Maximum Variation of Cant/Cross level in Straight & Circular Curve is _____ mm.

a)

+/- 1

b)

+/- 2

c)

+/- 3

d)

+/- 5

5.

OMS 2000 is used to record _______.

a)

Horizontal Oscillation

b)

Vertical Oscillation

c)

Horizontal & Vertical Oscillation

6.

Foot, Cab and Rear vehicle inspections are of different types.

a)

True

b)

False

7.

The Average total number of Peaks/Km < 1.5 the track is ________.

a)

Very Good

b)

Good

c)

Average

d)

Bad

8.

Urgent attention required for

a)

Peaks > 0.35

b)

Peaks < 0.35

c)

Peaks > 0.15

d)

Peaks < 0.15

9.

Portable Accelerometers OMS 2000

a)

Comprises Accelerometers & Transducers

b)

Converts Oscillations to Electrical Signals

c)

Electronic Recording & Computer Processing

d)

All the above

10.

Benefits of Track Inspection

a)

Assessment of Previous Maintenance Effectiveness

b)

Timely Planning for Track Maintenance

c)

Timely Planning for Track Renewal Activities

d)

All the above

11.

In Cab Ride Inspection

a)

Conducted on the first normal service train of the day

b)

Covers the entire length of DMTCL Main line

c)

Provides an Impression of Ride Quality

d)

All the above

12.

In Buffer stop, Maintenance is minimal if the frame has not been impacted and remains in the Installed Position.

a)

True

b)

False

13.

During Annual Maintenance of Buffer Stop

a)

Conduct Visual Inspection

b)

Re-torque Clamp Bolts

c)

Check Friction elements, regardless of train impact

d)

All the above

14.

The Average Total Number of Peaks/km > 3 the track is good.

a)

True

b)

False

15.

Mainline track inspections conducted on Foot or by Cab riding.

a)

True

b)

False