1. Choose the correct definition for construction industry.
The industry of carrying out building work or electrical and metal trade works.
An area of commercial enterprise such as the music industry.
The manufacture of heavy goods from raw materials.
The industry to do work.
The last stage of construction is
Designing
Commissioning
Scheduling
Planning
One of the functions of CIDB is to encourage the standardization and improvement of construction techniques and materials.
True
False
A contractor is appointed at which stage?
Planning
Tendering
Briefing
Construction
“It used when the client prefers a particular contractor, often because he has done satisfactory work for him before. Usually this is for specialized work or when a particular equipment is needed as an extension of existing works for further work following a previous contract.”
The statement above referring to which tender?
Negotiable tender
Selective tender
Limited tender
Pre-qualification tender
Testing and commissioning done by which party?
Sub-contractor
Supplier
Client
Contractor
Choose the item that is not in tender document based on Bill of Quantities
Drawing
Bill of Quantity
Cost analysis schedule
Contractor background
Quotations are letter of enquiry
True
False
The tender validity period is?
60
70
90
100
Tender rejection can be happened due to the factors as stated below except.
Enough financial to support project.
Low value tender
High value tender
Detail of tender not properly fill in.
Choose the incorrect statement about Contractor Service Centre.
Acknowledge the qualified Bumiputera contractors
As a center for contractor's registration
To help solved problems faced by Bumiputera contractors
Provide consultancy and advisory services with respect to the construction industry
Nominated sub-contractor are selected by?
Main contractor
Architect
Client
Quantity surveyor
A tender is in the nature of?
A contract
An offer
A proposal
An invitation to offer
Responsible in obtaining materials for the projects, acquire goods to build the structures that involves various forms of correspondence with necessary material suppliers.
This statement is about_____________responsibilities.
Supplier
Contractor
Quantity Surveyor
Client
Choose the incorrect statement about the duty of a quantity surveyor
Consulting with other professionals about the design
Advising on procurement strategy
Maintain cost control during the full duration off the project
Prepare, examine, and analyses accounting records, financial statements, and other reports.