DCB30122 QUIZ

Total questions: 15

Worksheet time: 7mins

Name
Class
Date
1.

1.      Choose the correct definition for construction industry.

a)

The industry of carrying out building work or electrical and metal trade works.

b)

An area of commercial enterprise such as the music industry.

c)

The manufacture of heavy goods from raw materials.

d)

The industry to do work.

2.

The last stage of construction is

a)

Designing

b)

Commissioning

c)

Scheduling

d)

Planning

3.

One of the functions of CIDB is to encourage the standardization and improvement of construction techniques and materials.

a)

True

b)

False

4.

A contractor is appointed at which stage?

a)

Planning

b)

Tendering

c)

Briefing

d)

Construction

5.

      “It used when the client prefers a particular contractor, often because he has done satisfactory work for him before.  Usually this is for specialized work or when a particular equipment is needed as an extension of existing works for further work following a previous contract.”

The statement above referring to which tender?

a)

Negotiable tender

b)

Selective tender

c)

Limited tender

d)

Pre-qualification tender

6.

Testing and commissioning done by which party?

a)

Sub-contractor

b)

Supplier

c)

Client

d)

Contractor

7.

Choose the item that is not in tender document based on Bill of Quantities

a)

Drawing

b)

Bill of Quantity

c)

Cost analysis schedule

d)

Contractor background

8.

Quotations are letter of enquiry

a)

True

b)

False

9.

The tender validity period is?

a)

60

b)

70

c)

90

d)

100

10.

Tender rejection can be happened due to the factors as stated below except.

a)

Enough financial to support project.

b)

Low value tender

c)

High value tender

d)

Detail of tender not properly fill in.

11.

Choose the incorrect statement about Contractor Service Centre.

a)

Acknowledge the qualified Bumiputera contractors

b)

As a center for contractor's registration

c)

To help solved problems faced by Bumiputera contractors

d)

Provide consultancy and advisory services with respect to the construction industry

12.

Nominated sub-contractor are selected by?

a)

Main contractor

b)

Architect

c)

Client

d)

Quantity surveyor

13.

A tender is in the nature of?

a)

A contract

b)

An offer

c)

A proposal

d)

An invitation to offer

14.

Responsible in obtaining materials for the projects, acquire goods to build the structures that involves various forms of correspondence with necessary material suppliers.

This statement is about_____________responsibilities.

a)

Supplier

b)

Contractor

c)

Quantity Surveyor

d)

Client

15.

Choose the incorrect statement about the duty of a quantity surveyor

a)

Consulting with other professionals about the design

b)

Advising on procurement strategy

c)

Maintain cost control during the full duration off the project

d)

Prepare, examine, and analyses accounting records, financial statements, and other reports.