Advance Certification course for S&T - Final

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

UFSBI has application in

a)

Automatic Signalling

b)

IBS

c)

Gate

d)

All of these

2.

Communication medium of UFSBI is

a)

Optical fibre

b)

Copper cable

c)

Microwave radio

d)

All of these

3.

The Communication of UFSBI is in full duplex mode

a)

True

b)

False

4.

UFSBI Alarm panel provide at

a)

SM Room

b)

SER Room

c)

Relay Room

d)

Telecom Room

5.

Track relay having the coil resistance of

a)

2.25 ohms

b)

5 ohms

c)

8 ohms

d)

9 ohms

6.

When the relay is energised _____ contact is used

a)

Front

b)

Back

c)

Arm

d)

None of these

7.

Soldering iron used for relay jack/plug board wiring

a)

230V/65W

b)

220V/65W

c)

110V/65W

d)

400V/65W

8.

The circuits are operated by the output of the DC-DC converter

a)

Internal

b)

External

c)

Point Detection

d)

All the above

9.

Fuse used for SPD

a)

93 A

b)

83 A

c)

73 A

d)

63A

10.

The Auto CLS panel has the following supply options

a)

EB

b)

UP AT

c)

DN AT

d)

All the above

11.

All modules provided in IPS are equipped with redundancy.

a)

True

b)

False

12.

Which of these does not represent an advantage of EI over relay interlocking?

a)

Reduction in wiring, interconnections, and number of fuses.

b)

Self-diagnostic features.

c)

Only interface relays are required.

d)

More Space requirement 

13.

Identify the vital input functions

a)

Track Proving Relays

b)

Point Detection Relays

c)

Interlocked Gate Control

d)

All the above

14.

In Warm Standby, the load is automatically taken over by the other equipment without any time delay

a)

True

b)

false

15.

In EEPROM, data can be erased by applying an

a)

UV light

b)

Electric field

c)

X-Rays

d)

Infrared Rays

16.

Moisture must be maintained at least

a)

20%

b)

30%

c)

40%

d)

50%

17.

Excavated pit around the G.I pipe is filled with salt and coal mixture

a)

True

b)

False

18.

The digital earth tester has ____ terminals

a)

4

b)

6

c)

8

d)

10

19.

SAT test verifies

a)

Integration software

b)

Electrical interfaces

c)

Safety mechanisms

d)

All of the above

20.

The FAT test is being conducted at the

a)

SM Room

b)

Railway HQ

c)

Factory

d)

Site

21.

LC Gate is situated beyond station limit operated by traffic department.

a)

True

b)

false

22.

Identify the Outdoor track side system

a)

Power Supply card

b)

PDCU

c)

Axle Counter Evaluator

d)

Rail Contacts

23.

When installing the rail contacts, what should be the diameter of the holes drilled in the rail?

a)

11 mm

b)

13 mm

c)

15 mm

d)

17 mm

24.

SSDAC can monitor maximum of ______ DP.

a)

3 DP

b)

5 DP

c)

7 DP

d)

9 DP

25.

What is the recommended power supply range for EAK ?

a)

54V AC to 72V AC

b)

60V DC to 80V DC

c)

42V DC to 54V DC

d)

54V DC to 72V DC