wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Midterm na

Total questions: 66

Worksheet time: 34mins

Name
Class
Date
1.

According to the Virtues of the Architect by Vitruvius, the architect must "preserve his name with_____"?

a)

God

b)

Excellence

c)

Dignity

d)

Integrity

2.

UAP was formed out of the union of PIA, LPGA, and LPA, in what year?

a)

1972

b)

1973

c)

1974

d)

1975

3.

Architecture is defined in RA 9266 as "the art, science and profession of planning, designing and constructing buildings in their _________, with due account of their environment and in accordance with the principles of utility, strength, and beauty".

a)

Equality

b)

Totality

c)

Ability

d)

Responsibility

4.

The Studies will set the project against present and future trends to forecast how it will perform over time

a)

Pre-feasibility Studies

b)

Feasibility Studies

c)

Research Studies

d)

None of the above

5.

involve the procurement, analysis and use of secondary information gathered for the project to aid the client in early decision-making.

a)

Pre-Design

b)

Research Studies

c)

Pre-feasibility Studies

d)

Pre-Design

6.

include consultation, pre-feasibility studies, feasibility studies, site selection and analysis, site utilization and land-use studies, architectural research, architectural programming, space planning, space management studies, value management, design brief preparation, promotional services and other related activities

a)

Design-Build Services

b)

Regular Services

c)

Pre-Design Services

d)

Post-Construction Services

7.

cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions.

a)

SPP 201

b)

SPP 202

c)

SPP 203

d)

SPP 207

8.

It will be most advantageous to the Client to involve the Architect in the earliest stages of the project

a)

True

b)

False

c)

Maybe

d)

Ulol

9.

As architects we have a responsibility to society

a)

Richard Rogers

b)

Renzo Piano

c)

Le Corbusier

d)

I.M. Pei

10.

(Cores Values of an Architect)

Critical judgment, deep insights and a level of discretion that comes from a comprehensive understanding of the whole

a)

Prudence

b)

Wisdom

c)

Enlightenment

d)

Leadership

11.

(Core Values of an Architect)

Providing artful guidance and oversight throughout project, like a conductor leading an orchestra

a)

Prudence

b)

Leadership

c)

Wisdom

d)

Creativity

12.

(Core Values of an Architect) Understanding the meaning and application of core values in the Vitruvian axiom “commodity, firmness, delight” (firmitas, utilitas and venustas), (Function, Stability, Aesthetics).


a)

Integrity

b)

Creativity

c)

Wisdom

d)

Enlightenment

13.

To be qualified as having passed the licensure examination for architects, a candidate must obtain no grade lower than

a)

60%

b)

50%

c)

70%

d)

75%

14.

To be qualified as having passed the licensure examination for architects, a candidate must obtain a weighted general average of

a)

50%

b)

70%

c)

75%

d)

80%

15.

Are foreign architects allowed to take the Licensure Examination for Architects (LEA) administered by PRC?

a)

Yes

b)

Yes, with conditions

c)

No

d)

Who knows? ¯\_(ツ)_/¯

16.

registered and licensed architect or permitted to practice under RA9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

a)

Architect

b)

AoR

c)

AiCC

d)

CA

17.

registered and licensed architect who is directly and professionally responsible and liable for the construction supervision of the project.

a)

Architect

b)

AoR

c)

AiCC

d)

CA

18.

Three associations before UAP.

a)

LPA

b)

APGA

c)

PIA

d)

AIA

19.

became the first accredited professional organization on May 12, 1975 with the professional regulation commission issuing certificate no. 001

a)

PIA

b)

LPA

c)

UAP

d)

APGA

20.

first private school to offer an academic title for Maestro de Obras

a)

Liceo de Manila

b)

UST

c)

Mapua

d)

Adamson

21.

first Filipino recorded architect

a)

Felix Roxas y Arroyo

b)

Thomas Mapua

c)

Carlos Baretto

d)

Juan Nakpil

e)

Drio Mendoza

22.

The Architecture Law in 1950

a)

RA 545

b)

RA 544

c)

RA 543

d)

RA 546

23.

This is the art, science and profession of planning, designing and constructing buildings in their totality, with due account of their environment and in accordance with the principles of utility, strength and beauty.

a)

Architecture

b)

Urban Planning

c)

Urban Design

d)

Environmental Planning

24.

(Responsibilities in Relation to)

The Architect shall not use paid advertisement nor use self-

laudatory, exaggerated or misleading publicity

a)

People

b)

Client

c)

Contractor

d)

Colleagues and Subordinates

25.

(Responsibilities in Relation to)

The Architect shall not, at any time or circumstance, accept

free engineering services, or receive any substantial aid, gifts, commissions,

or favors from any Contractor or sub-contractor which will tent to place him

under any kind of moral obligation

a)

Manufacturers, Agents and Dealers

b)

Contractor

c)

Colleagues and Subordinates

d)

Clients

26.

(Responsibilities in Relation to)

The Architect shall explain the conditional character of estimates

other than estimates submitted in the form of actual proposals by contractors

and in no case shall be guarantee any estimates or cost of the work.

a)

Contractor

b)

People

c)

Client

d)

Colleagues and Subordinates

27.

(Responsibility in Relation to)

Architect shall promote the interest of his professional

organization and do his full part of the work to enhance the objectives

and services of the organization.

a)

Contractor

b)

Colleagues and Subordinates

c)

Clients

d)

People

28.

When was RA 9266, otherwise known as The Architecture Act of 2004, signed into law?

a)

April 10, 2004

b)

March 17, 2004

c)

November 15, 2004

d)

December 1, 2004

29.

This section of RA 9266 can usually be found in title blocks of project plans or blueprints.

a)

Section 30

b)

Section 31

c)

Section 32

d)

Section 33

30.

The Implementing Rules and Regulations (IRR) of RA 9266 took effect on:

a)

March 17, 2004

b)

April 10, 2004

c)

November 15, 2004

d)

December 1, 2004

31.

How many sets of plans/documents are to be given/submitted to the owner under Regular Design Services?

a)

7

b)

4

c)

6

d)

5

32.

What does NIPA stands for?

a)

Nanasakinanamin Intel Panasonic Amazon

b)

National Institute of Pilipino Architects

c)

National Integrated Professional Architects

d)

National Institute of Professional Architects

33.

The basic services provided by the Architect have drastically changed over the years, with no need to expand his/her services despite the increasing demands of Clients, the evolution of new standards of regulated professional practice, the advancement of technology, or the enactment of new laws.

a)

True

b)

False

c)

Yes

d)

Huh? Haha

34.

When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project

a)

Consultation

b)

Pre-Design Services

c)

Pre-Feasibility Studies

d)

Site Selection and Analysis

35.

This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.

a)

Site Selection and Analysis

b)

Site Utilization and Land-Use Studies

c)

Architectural Programming

d)

Urban Planning

36.

involves the identification of a site's development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.

a)

Feasibility Studies

b)

Site Utilization and Land-Use Studies

c)

Site Selection and Analysis

d)

Architectural Programming

37.

 This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc

a)

Site Utilization and Land-Use Studies

b)

Site Selection and Analysis

c)

Architectural Programming

d)

Architectural Research

38.

is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc.

a)

Architectural Programming

b)

Space Planning

c)

Architectural Research

d)

Architectural Methodology

39.

An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces.

a)

Value Management

b)

Space Management Studies

c)

Feasibility Studies

d)

Architectural Studies

40.

This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs.

a)

Feasibility Studies

b)

Space Management Studies

c)

Value Management

d)

Method of Compensation

41.

The goal of vale management is to achieve and unimpaired program at _________ cost. Thus, a plan, design or system that has been successfully value-managed will still satisfy the same performance criteria as the costlier alternatives

a)

maximum

b)

minimum

c)

higher

d)

double

42.

Under this, the Architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private)

a)

Value Management

b)

Design Brief Preparation

c)

Promotional Services

d)

Method of Compensation

43.

After the initial meeting / conversation / correspondence with the Client, the Architect must submit his proposal for pre-design services, stating the following:

a)

Scope of Work

b)

Manner of Payment

c)

Owner's Responsibilities

d)

Other Conditions of Services

e)

Building Permit Fees

44.

In Manner of Providing Services, as an individual Architect he must have special training and be knowledgeable in one specific field to supplement his skills

a)

True

b)

False

c)

Half Half

d)

Ewan

45.

is based on the Architect’s / architectural firm’s talents, skill, experience, imagination, and on the type and level of professional services provided.

a)

Value Management

b)

Manner of Providing Services

c)

Method of Compensation

d)

Promotional Services

46.

This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work.

a)

Multiple of Direct Personnel Expenses

b)

Unit Cost Method

c)

Percentage of Construction Cost

d)

Lump Sum Payment

47.

the owner defines the project requirements; architects inform about the technical requirements and the professional fees

a)

Design Development Phase

b)

Project Definition Phase

c)

Bidding or Negotiation Phase

d)

Schematic Design Phase

48.

Preparation of schematic design studies from project definition phase leading to conceptual plans (meaning schematic and conceptual drawings)

a)


Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Construction Phase

49.

preparation of drawings from approved schematics and conceptual plans

a)

Project Definition Phase

b)

Schematic Design Phase

c)

Design Development Phase

d)

Contract Document Phase

50.

preparation of drawings from approved Design Development Documents

a)

Project Definition Phase

b)

Design Development Phase

c)

Construction Phase

d)

Contract Document Phase

51.

– involving detailed planning and design to control sound transmission considering the architectural concept and project requirements

a)

Acoustic Design Services

b)

Architectural Lighting Layout and Design

c)

Site Development Planning

d)

Architectural Interiors

52.

Continuous use of imagination both in problem solving, and artistic expression; with drawing, painting, sculpture…and practical study of the sister arts, adding to the richness of their solutions

a)

Creativity

b)

Prudence

c)

Wisdom

d)

Resourcefulness

53.

Modeling design and building technologies after natures own laws of order, and striving for unique solutions that wed together the highest ideals of beauty and practical utility

a)

Leadership

b)

Resourcefulness

c)

Wisdom

d)

Integrity

54.

Which of the following SPP categories encompasses the complete range of architectural services, including problem identification, conceptualization, and the development of various architectural solutions?

a)

SPP 202

b)

SPP 203

c)

SPP 206

d)

SPP 209

55.

SPP 203 focuses on which type of services, offering specialized skills and knowledge tailored to unique project requirements?

a)

Regular Design Services

b)

Specialized Architectural Services

c)

Comprehensive Architectural Services

d)

Professional Architectural Services

56.

The responsibility of the Architect in the Construction Phase of the Regular Design Services

a)

Prepares shop drawings

b)

Be held responsible for failure of contractor to carry out work

c)

Makes periodic visits to the site

d)

Makes exhaustive on-site supervision

57.

Architectural service / phase where the architect and client choose the contractor

a)


Contract document phase

b)

Construction phase

c)

Bidding / negotiation phase

d)

Evaluation phase

58.

Means a document which forms part of the Architects' National Code which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct

a)


Code of Ethical Conduct

b)

Professional Identification Card

c)


Contract Document

d)


Standards of Professional Practice

59.

Under Pre-Design Services, the cost of printing extra set of drawings, reports, maps, contract documents over the _____ copies submitted to the client, overseas and long distance calls, technical and laboratory tests, licenses, fees, taxes, and similar cost items needed by the project are chargeable to the client.

a)


8 copies

b)


6 copies

c)


7 copies

d)


5 copies

60.

(Responsibility in Relation to)
Architect shall not render professional services without compensation except for small civic projects.

a)

People

b)

Client

c)

Colleagues and Subordinates

d)

Contractor

61.

(Responsibility in Relation to)
Architect shall not knowingly compete with other architects on the basis of difference of professional charges, nor use donation as a device for obtaining competitive advantage except for worthy civic or religious projects.

a)

People

b)

Colleagues and Subordinates

c)

Contractor

d)

Client

62.

(Responsibility in Relation to)
Architect shall not undertake, under a fixed contract sum agreement, the construction of any project based on plans prepared by him.

a)

People

b)

Contractor

c)

Client

d)

Colleagues and Subordinates

63.

(Responsibility in Relation to)
Architect shall not avail or make use of engineering or other technical services offered by manufacturers, or suppliers of building materials or equipment which may be accompanied by an obligation detrimental to the best interest of the client or which may adversely affect the architect's professional opinion

a)

People

b)

Manufacturers, Dealers, and Agents

c)

Colleagues and Subordinates

d)

Client

64.

(Responsibility in Relation to)
Architect shall not at any time receive commissions, discounts, fees, gifts or favors from agents or films handling building materials or equipment which may place him in reciprocal frame of mind

a)

Colleagues and Subordinates

b)

Manufacturers, Dealers, and Agents

c)

Client

d)

Contractor

65.

The following are responsibilities of an Architect in relation to his colleagues and Subordinates except one, choose the correct answers only

a)

Architects shall not under any circumstances nor through any means seek commissions already known to him previously endowed to another architect.

b)

Architect shall not, in any case enter as a competitor in any architectural competition when he has direct relations with formulation of the Program therof or when he has been engaged.

c)

Architect shall not knowingly injure falsely or maliciously, the professional reputation, prospects or practice of another Architect.

d)

Architect shall inspire the loyalty of his employees and subordinates by providing them with suitable working conditions, requiring them to render competent and efficient services and paying them adequate and just compensation therof.

e)

Architect shall not mislead the public through advertisements, signs, or printed matter citing his professional specializations unless such qualifications are well known facts or sanctioned by professional consensus and years of experience.

66.

(Responsibility in Relation to)
Architect shall immediately upon his personal knowledge and inspection, reject, or condemn materials, equipment, or workmanship which are not in conformity with the contract documents in order not to cause unnecessary delay and additional expense to the contractor

a)

People

b)

Contractor

c)

Colleagues and Subordinates

d)

Client