Font size
WorksheetsMidterm na
Total questions: 66
Worksheet time: 34mins
According to the Virtues of the Architect by Vitruvius, the architect must "preserve his name with_____"?
God
Excellence
Dignity
Integrity
UAP was formed out of the union of PIA, LPGA, and LPA, in what year?
1972
1973
1974
1975
Architecture is defined in RA 9266 as "the art, science and profession of planning, designing and constructing buildings in their _________, with due account of their environment and in accordance with the principles of utility, strength, and beauty".
Equality
Totality
Ability
Responsibility
The Studies will set the project against present and future trends to forecast how it will perform over time
Pre-feasibility Studies
Feasibility Studies
Research Studies
None of the above
involve the procurement, analysis and use of secondary information gathered for the project to aid the client in early decision-making.
Pre-Design
Research Studies
Pre-feasibility Studies
Pre-Design
include consultation, pre-feasibility studies, feasibility studies, site selection and analysis, site utilization and land-use studies, architectural research, architectural programming, space planning, space management studies, value management, design brief preparation, promotional services and other related activities
Design-Build Services
Regular Services
Pre-Design Services
Post-Construction Services
cover a broad line of architectural services ranging from initial problem identification to activities that would allow the Architect to initially conceptualize an array of architectural and allied solutions.
SPP 201
SPP 202
SPP 203
SPP 207
It will be most advantageous to the Client to involve the Architect in the earliest stages of the project
True
False
Maybe
Ulol
“As architects we have a responsibility to society”
Richard Rogers
Renzo Piano
Le Corbusier
I.M. Pei
(Cores Values of an Architect)
Critical judgment, deep insights and a level of discretion that comes from a comprehensive understanding of the whole
Prudence
Wisdom
Enlightenment
Leadership
(Core Values of an Architect)
Providing artful guidance and oversight throughout project, like a conductor leading an orchestra
Prudence
Leadership
Wisdom
Creativity
(Core Values of an Architect) Understanding the meaning and application of core values in the Vitruvian axiom “commodity, firmness, delight” (firmitas, utilitas and venustas), (Function, Stability, Aesthetics).
Integrity
Creativity
Wisdom
Enlightenment
To be qualified as having passed the licensure examination for architects, a candidate must obtain no grade lower than
60%
50%
70%
75%
To be qualified as having passed the licensure examination for architects, a candidate must obtain a weighted general average of
50%
70%
75%
80%
Are foreign architects allowed to take the Licensure Examination for Architects (LEA) administered by PRC?
Yes
Yes, with conditions
No
Who knows? ¯\_(ツ)_/¯
registered and licensed architect or permitted to practice under RA9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.
Architect
AoR
AiCC
CA
registered and licensed architect who is directly and professionally responsible and liable for the construction supervision of the project.
Architect
AoR
AiCC
CA
Three associations before UAP.
LPA
APGA
PIA
AIA
became the first accredited professional organization on May 12, 1975 with the professional regulation commission issuing certificate no. 001
PIA
LPA
UAP
APGA
first private school to offer an academic title for Maestro de Obras
Liceo de Manila
UST
Mapua
Adamson
first Filipino recorded architect
Felix Roxas y Arroyo
Thomas Mapua
Carlos Baretto
Juan Nakpil
Drio Mendoza
The Architecture Law in 1950
RA 545
RA 544
RA 543
RA 546
This is the art, science and profession of planning, designing and constructing buildings in their totality, with due account of their environment and in accordance with the principles of utility, strength and beauty.
Architecture
Urban Planning
Urban Design
Environmental Planning
(Responsibilities in Relation to)
The Architect shall not use paid advertisement nor use self-
laudatory, exaggerated or misleading publicity
People
Client
Contractor
Colleagues and Subordinates
(Responsibilities in Relation to)
The Architect shall not, at any time or circumstance, accept
free engineering services, or receive any substantial aid, gifts, commissions,
or favors from any Contractor or sub-contractor which will tent to place him
under any kind of moral obligation
Manufacturers, Agents and Dealers
Contractor
Colleagues and Subordinates
Clients
(Responsibilities in Relation to)
The Architect shall explain the conditional character of estimates
other than estimates submitted in the form of actual proposals by contractors
and in no case shall be guarantee any estimates or cost of the work.
Contractor
People
Client
Colleagues and Subordinates
(Responsibility in Relation to)
Architect shall promote the interest of his professional
organization and do his full part of the work to enhance the objectives
and services of the organization.
Contractor
Colleagues and Subordinates
Clients
People
When was RA 9266, otherwise known as The Architecture Act of 2004, signed into law?
April 10, 2004
March 17, 2004
November 15, 2004
December 1, 2004
This section of RA 9266 can usually be found in title blocks of project plans or blueprints.
Section 30
Section 31
Section 32
Section 33
The Implementing Rules and Regulations (IRR) of RA 9266 took effect on:
March 17, 2004
April 10, 2004
November 15, 2004
December 1, 2004
How many sets of plans/documents are to be given/submitted to the owner under Regular Design Services?
7
4
6
5
What does NIPA stands for?
Nanasakinanamin Intel Panasonic Amazon
National Institute of Pilipino Architects
National Integrated Professional Architects
National Institute of Professional Architects
The basic services provided by the Architect have drastically changed over the years, with no need to expand his/her services despite the increasing demands of Clients, the evolution of new standards of regulated professional practice, the advancement of technology, or the enactment of new laws.
True
False
Yes
Huh? Haha
When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project
Consultation
Pre-Design Services
Pre-Feasibility Studies
Site Selection and Analysis
This entails the formulation of site criteria, assistance to the Client in site evaluation as well as analysis to determine the most appropriate site/s for a proposed project or building program.
Site Selection and Analysis
Site Utilization and Land-Use Studies
Architectural Programming
Urban Planning
involves the identification of a site's development potentials through the proper utilization of land. The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.
Feasibility Studies
Site Utilization and Land-Use Studies
Site Selection and Analysis
Architectural Programming
This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution. It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc
Site Utilization and Land-Use Studies
Site Selection and Analysis
Architectural Programming
Architectural Research
is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc.
Architectural Programming
Space Planning
Architectural Research
Architectural Methodology
An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces.
Value Management
Space Management Studies
Feasibility Studies
Architectural Studies
This technique is applied in the cost management process to minimize the negative effect of simplified operations associated with many cost-reduction programs.
Feasibility Studies
Space Management Studies
Value Management
Method of Compensation
The goal of vale management is to achieve and unimpaired program at _________ cost. Thus, a plan, design or system that has been successfully value-managed will still satisfy the same performance criteria as the costlier alternatives
maximum
minimum
higher
double
Under this, the Architect states the project terms of reference (ToR) including the concept, objectives, and other necessary requirements to bid out architectural services (whether public or private)
Value Management
Design Brief Preparation
Promotional Services
Method of Compensation
After the initial meeting / conversation / correspondence with the Client, the Architect must submit his proposal for pre-design services, stating the following:
Scope of Work
Manner of Payment
Owner's Responsibilities
Other Conditions of Services
Building Permit Fees
In Manner of Providing Services, as an individual Architect he must have special training and be knowledgeable in one specific field to supplement his skills
True
False
Half Half
Ewan
is based on the Architect’s / architectural firm’s talents, skill, experience, imagination, and on the type and level of professional services provided.
Value Management
Manner of Providing Services
Method of Compensation
Promotional Services
This method of compensation is based on technical hours spent and does not account for creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work.
Multiple of Direct Personnel Expenses
Unit Cost Method
Percentage of Construction Cost
Lump Sum Payment
the owner defines the project requirements; architects inform about the technical requirements and the professional fees
Design Development Phase
Project Definition Phase
Bidding or Negotiation Phase
Schematic Design Phase
Preparation of schematic design studies from project definition phase leading to conceptual plans (meaning schematic and conceptual drawings)
Project Definition Phase
Schematic Design Phase
Design Development Phase
Construction Phase
preparation of drawings from approved schematics and conceptual plans
Project Definition Phase
Schematic Design Phase
Design Development Phase
Contract Document Phase
preparation of drawings from approved Design Development Documents
Project Definition Phase
Design Development Phase
Construction Phase
Contract Document Phase
– involving detailed planning and design to control sound transmission considering the architectural concept and project requirements
Acoustic Design Services
Architectural Lighting Layout and Design
Site Development Planning
Architectural Interiors
Continuous use of imagination both in problem solving, and artistic expression; with drawing, painting, sculpture…and practical study of the sister arts, adding to the richness of their solutions
Creativity
Prudence
Wisdom
Resourcefulness
Modeling design and building technologies after natures own laws of order, and striving for unique solutions that wed together the highest ideals of beauty and practical utility
Leadership
Resourcefulness
Wisdom
Integrity
Which of the following SPP categories encompasses the complete range of architectural services, including problem identification, conceptualization, and the development of various architectural solutions?
SPP 202
SPP 203
SPP 206
SPP 209
SPP 203 focuses on which type of services, offering specialized skills and knowledge tailored to unique project requirements?
Regular Design Services
Specialized Architectural Services
Comprehensive Architectural Services
Professional Architectural Services
The responsibility of the Architect in the Construction Phase of the Regular Design Services
Prepares shop drawings
Be held responsible for failure of contractor to carry out work
Makes periodic visits to the site
Makes exhaustive on-site supervision
Architectural service / phase where the architect and client choose the contractor
Contract document phase
Construction phase
Bidding / negotiation phase
Evaluation phase
Means a document which forms part of the Architects' National Code which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct
Code of Ethical Conduct
Professional Identification Card
Contract Document
Standards of Professional Practice
Under Pre-Design Services, the cost of printing extra set of drawings, reports, maps, contract documents over the _____ copies submitted to the client, overseas and long distance calls, technical and laboratory tests, licenses, fees, taxes, and similar cost items needed by the project are chargeable to the client.
8 copies
6 copies
7 copies
5 copies
(Responsibility in Relation to)
Architect shall not render professional services without compensation except for small civic projects.
People
Client
Colleagues and Subordinates
Contractor
(Responsibility in Relation to)
Architect shall not knowingly compete with other architects on the basis of difference of professional charges, nor use donation as a device for obtaining competitive advantage except for worthy civic or religious projects.
People
Colleagues and Subordinates
Contractor
Client
(Responsibility in Relation to)
Architect shall not undertake, under a fixed contract sum agreement, the construction of any project based on plans prepared by him.
People
Contractor
Client
Colleagues and Subordinates
(Responsibility in Relation to)
Architect shall not avail or make use of engineering or other technical services offered by manufacturers, or suppliers of building materials or equipment which may be accompanied by an obligation detrimental to the best interest of the client or which may adversely affect the architect's professional opinion
People
Manufacturers, Dealers, and Agents
Colleagues and Subordinates
Client
(Responsibility in Relation to)
Architect shall not at any time receive commissions, discounts, fees, gifts or favors from agents or films handling building materials or equipment which may place him in reciprocal frame of mind
Colleagues and Subordinates
Manufacturers, Dealers, and Agents
Client
Contractor
The following are responsibilities of an Architect in relation to his colleagues and Subordinates except one, choose the correct answers only
Architects shall not under any circumstances nor through any means seek commissions already known to him previously endowed to another architect.
Architect shall not, in any case enter as a competitor in any architectural competition when he has direct relations with formulation of the Program therof or when he has been engaged.
Architect shall not knowingly injure falsely or maliciously, the professional reputation, prospects or practice of another Architect.
Architect shall inspire the loyalty of his employees and subordinates by providing them with suitable working conditions, requiring them to render competent and efficient services and paying them adequate and just compensation therof.
Architect shall not mislead the public through advertisements, signs, or printed matter citing his professional specializations unless such qualifications are well known facts or sanctioned by professional consensus and years of experience.
(Responsibility in Relation to)
Architect shall immediately upon his personal knowledge and inspection, reject, or condemn materials, equipment, or workmanship which are not in conformity with the contract documents in order not to cause unnecessary delay and additional expense to the contractor
People
Contractor
Colleagues and Subordinates
Client
