WorksheetsPART VII - DRAINAGE STRUCTURES
Total questions: 19
Worksheet time: 11mins
IT IS MEANT TO STABILIZE THE FOUNDATION BED TO AVOID ANY POSSIBLE SETTLEMENT THAT MIGHT IMPAIR THE FUNCTION OF THE DRAINAGE STRUCTURE AND ALSO TO SERVE AS A UNIFORM CUSHION TO THE CULVERT
(a)
IF THE UNDERLYING SOIL AT THE DESIGNED BOTTOM GRADE OF THE CULVERT IS COMPOSED OF SUITABLE MATERIAL, IT SHOULD BE REMOVED REMOVED AND SUBSTITUTED WITH GRANULAR FILL COMPOSED OF SAND OR SANDY SOIL.
TRUE
FALSE
NORMAL THICKNESS OF FOUNDATION FILL
20 cm
25 cm
22 cm
20 mm
WHAT CAN BE USED TO SPREAD MANUALLY THE FOUNDATION FILL UNTIL THE WHOLE FOUNDATION BED IS COVERED, AS REQUIRED? (SELECT AS MANY)
RAKES
SHOVEL
COMPACTOR
SCRAPERS
FOR _ CULVERTS, THE LAYERS ARE OF UNIFORM FLAT THICKNESS.
BOX
PIPE
CIRCULAR
______ ARE INSTALLED IN THE ORIGINAL STREAMBED WITH THEIR GRADES AND FLOW LINE CONFORMING TO THE NATURAL CHANNEL OR CANAL..
BOX
PIPES
CIRCULAR
WHICH IS TRUE IN THE STATEMENTS GIVEN?
FOR BOX CULVERTS, THE BEDDING IS SHAPED SO THAT THE BOTTOM OF THE PIPE WILL BE IN CONTACT THROUGHOUT ITS FULL LENGTH.
FOR CIRCULAR PIPES, THE BEDDING IS SHAPED SO THAT THE BOTTOM OF THE PIPE WILL BE IN CONTACT THROUGHOUT ITS FULL LENGTH.
IT CAN BE DONE WITH HAND OR MECHANICAL EQUIPMENT CAREFULLY DONE TO ENSURE A THOROUGHLY TAMPED FOUNDATION FILL.
COMPACTION
EXCAVATION
EMBANKMENT
WHAT IS THE CORRECT ORDER PROCESS OF R.C. BOX CULVERT CONSTRUCTION PHASES
CULVERT BASE - SIDE AND INNER WALLS - CULVERT SLAB
SIDE AND INNER WALLS - CULVERT BASE - CULVERT SLAB
CULVERT BASE - CULVERT SLAB - SIDE AND INNER WALLS
WHAT IS THE CORRECT ORDER PROCESS OF R.C. PIPE CULVERT CONSTRUCTION PHASES
INSTALLATION OF PIPE - COLLARING OF RC PIPES - BACKFILLING
INSTALLATION OF PIPE - BACKFILLING - COLLARING OF RC PIPES
COLLARING OF RC PIPES - INSTALLATION OF PIPE - BACKFILLING
IN THE INSTALLATION OF RC PIPES, LAYING BEGINS AT _________ END OF THE CULVERT LINE TO USE GRAVITY IN PROPERLY INSTALLING THE PIPES.
DOWNSTREAM
UPSTREAM
GROOVE ENDS ARE PLACED SUCH THAT THE PIPE ENDS FIT AS ITS NEAREST ENDS.
TRUE
FALSE
_______ SEGMENT OF EACH PIPE SHOULD BE IN CONTACT WITH THE SHAPE OF THE BEDDING THROUGHOUT ITS FULL LENGTH.
LOWER
UPPER
IN COLLARING OF RC PIPES, MORTAR PROPORTION IS ______ WITH ENOUGH WATER TO OBTAIN THE DESIRED CONSISTENCY.
1:2
2:1
1:1
2:2
IN COLLARING THE RC PIPES, THE ______ IS TO FORM THE CONTINUOUS BEAD AROUND THE OUTSIDE THE PIPE.
COLLAR
SIDE WALLS
BAKFILLING
IN COLLARING THE RC PIPES, THE ______ OF PIPE IS FINISHED SMOOTH.
INSIDE
OUTSIDE
HOLLOW
BACKFILL ARE PLACED AND COMPACTED IN LAYERS NOT EXCEEDING ____ ON BOTH SIDES UP TO AN ELEVATION OF _____ ABOVE THE TOP OF THE CULVERT.
15 cm , 30 cm
30 cm , 15 cm
15 cm , 20 cm
10 cm , 30 cm
(a) MAYBE DONE MANUALLY USING RAKES AND SHOVELS AT A THIN LAYER WHICH IS MOST IDEAL TO PRODUCE EASY COMPACTION OF MATERIAL DONE USING HANAD TAMPERS TO INSURE A THOROUGHLY TAMPED BACKFILL.
AFTER BACKFILLING, PIPE CULVERTS ARE PROTECTED BY PROVIDING EXTRA FILL AS COVER BEFORE ANY HEAVY EQUIPMENT IS PERMITTED TO CROSS DURING THE CONSTRUCTION OF THE ROADWAY TO PROTECT THE JOB FROM POSSIBLE DAMAGE BY EXCESSIVE LOADS.
TRUE
FALSE