WorksheetsINDUSTRIAL AUTOMATION LEVEL 4
Total questions: 40
Worksheet time: 17mins
What is the first step in planning an industrial automation project?
Begin the installation process
Define the project scope and objectives
Select the final equipment supplier
Create a detailed budget plan
What is the second step in organizing an industrial automation project?
Select automation equipment
Define project scope and objectives
Develop project timeline
Create project budget
What is the third step in controlling an industrial automation project?
Implement control logic
Review project budget
Calibrate sensors
Test control panel
How long should a quality minute meeting typically last?
30 minutes
1 hour
45 minutes
15 minutes
What is the role of the secretary during a meeting?
Lead the meeting discussions
Order lunch for everyone
Take notes, record minutes, and keep track of important decisions and action items discussed.
Take care of technical setup
What is the job scope of the secretary during a meeting?
Leading the discussion
Setting up audio-visual equipment
Ordering lunch for attendees
Taking minutes, managing schedules, handling correspondence, organizing documents, and assisting with administrative tasks.
What are some key considerations when planning an industrial automation project?
Ignoring safety measures
Selecting outdated technology
Not considering maintenance and support
Defining project goals and scope, selecting the right technology and equipment, considering safety measures, evaluating costs and ROI, planning for maintenance and support, ensuring compatibility with existing systems
How can you ensure effective organization in an industrial automation project?
By defining project goals, creating a detailed plan, assigning roles, establishing communication channels, monitoring progress, and conducting testing.
By skipping testing
By not establishing communication channels
By ignoring project goals and roles
What are some common challenges faced in controlling an industrial automation project?
Lack of skilled personnel, budget constraints, hardware limitations, inadequate project planning
Integration issues, compatibility with devices/protocols, complex programming, cybersecurity threats, system reliability/scalability
Why is it important to have clear communication in project coordination?
Clear communication leads to confusion and chaos among team members
Having unclear communication enhances productivity and efficiency in project coordination
Misunderstandings and errors are beneficial for project success
Clear communication ensures all team members understand their roles, responsibilities, deadlines, and expectations, preventing misunderstandings, reducing errors, improving efficiency, and fostering collaboration.
What tools or software are commonly used in industrial automation project management?
PLC programming software, HMI/SCADA software, project management tools
CAD software, ERP systems, social media platforms
How can project managers ensure that deadlines are met in industrial automation projects?
By ignoring the project plan and letting the team work freely
By setting unrealistic deadlines and not providing resources
By avoiding communication with team members and stakeholders
By creating a detailed project plan, assigning tasks effectively, monitoring progress, addressing issues promptly, and adjusting the plan as needed.
What are some strategies for resolving conflicts within an industrial automation project team?
Ignoring the conflict and hoping it resolves itself
Assigning blame to team members
Avoiding communication and collaboration
Open communication, active listening, defining clear roles and responsibilities, setting common goals, seeking compromise, involving a mediator if necessary
How can project managers ensure that the project stays within budget?
Create a detailed budget plan, monitor expenses regularly, address budget overruns promptly, and make adjustments as needed.
Avoid making any adjustments to the budget
Rely solely on initial budget estimates without monitoring
Ignore budget constraints completely
What are the benefits of regular project status updates in industrial automation projects?
Regular project status updates are time-consuming and unnecessary
Regular project status updates provide visibility into progress, identify potential issues early, ensure alignment with project goals, facilitate communication among team members, and allow for timely adjustments to ensure project success.
Regular project status updates hinder project progress
Regular project status updates cause confusion among team members
Apakah nama jadual dibawah?
Borang aduan kerosakkan
Borang keluar masuk peralatan
Senarai semak penyelenggaraan
Rekod laporan kerja penyelenggaraan
Apakah nama jadual dibawah?
Borang aduan kerosakkan
Borang keluar masuk peralatan
Senarai semak penyelenggaraan
Rekod laporan kerja penyelenggaraan
Apakah nama jadual dibawah?
Borang aduan kerosakkan
Borang keluar masuk peralatan
Senarai semak penyelenggaraan
Rekod laporan penyelenggaraan
Apakah nama jadual dibawah?
Borang aduan kerosakkan
Borang keluar masuk peralatan
Senarai semak penyelenggaraan
Rekod laporan kerja penyelenggaraan
Apakah definisi bagi Material handling ?
Mengendalikan pengendalian bahan
Kurangkan masa kitaran pembuatan bahan
Menggalakkan keselamatan dan memperbaiki keadaan kerja
Pengendalian bahan adalah pergerakan dan penyimpanan bahan dengan kos yang paling rendah melalui penggunaan metode dan peralatan yang sepatutnya
Apakah nama peralatan ini?
Depth gauge micrometer
Dial gauge
Internal micrometer
External micrometer
Which of the following components can be connected to the PLC output module
(i). Limited coil
(ii). Solenoid
(iii). Servo
(iv). Alarm
(v). Infrared Lamp
Only (ii), (iii), and (iv)
Only (i), (iii), (iv) and (v)
Only (i), (ii), dan (iii)
All (i), (ii), (iii), (iv), dan (v)
The following option is not included in industrial automation goals
Increase production costs
Increase the amount of production
Reducing energy consumption
Improve the quality of goods
Bilakah preventive maintainance dilakukan?
Dijalankan apabila mesin break down ,overhauling dan rebuilding of machine.
Dilakukan mengikut jadual harian kerja mengikut hari, tarikh dan masa yang ditetapkan.
Dilakukan pada tarikh yang ditetapkan berdasarkan pemerhatian hasil analisa data operasi yang diambil.
Bilaka corrective maintenance dijalankan?
Dijalankan apabila mesin break down ,overhauling dan rebuilding of machine.
Dilakukan mengikut jadual harian kerja mengikut hari, tarikh dan masa yang ditetapkan.
Dilakukan pada tarikh yang ditetapkan berdasarkan pemerhatian hasil analisa data operasi yang diambil.
Apakah perkara yang perlu diberi perhatian dalam penyelenggaraan bearing?
Pegang bearing dengan cermat ,elakkan dari tercalar/terketuk.
Letakkan bearing didalam bungkusannya bagi mengelakkan habuk/kotoran.
Lindungi bearing dari karat semasa simpanan/bearing keluli hendaklah diminyakkan.
Apakah nama proses tersebut?
Drilling
Tapping
Reaming
Counterboring
Apakah bacaan Mikrometer?
3.26mm
3.76mm
2.76mm
3.86
Apakah kalibrasi?
Proses mengubah prestasi alat pengukur, supaya nilai-nilai yang ditunjukkan olehnya adalah tepat dalam had yang ditetapkan.
Proses membandingkan nilai atau ukuran yang ditunjukkan oleh surat cara atau sistem tertentu terhadap apa yang dinyatakan oleh piawaian ( Calibrator ), di bawah syarat-syarat ujian terkawal.
Apakah kalibrasi pengukuran (measurement calibration)?
Melibatkan pengukuran dari segi voltan,rintangan dan sebagainya.
Melibatkan pengukuran dari segi peralatan yang mempunyai nilai pengukuran seperti vernier caliper,micrometer,measurement tape dan sebagainya.
Melibatkan pengukuran dari segi kaedah pemasangan yang betul,mekanikal,assemble drawing dan sebagainya.
Apakah definisi bagi Material handling ?
Mengendalikan pengendalian bahan
Kurangkan masa kitaran pembuatan bahan
Menggalakkan keselamatan dan memperbaiki keadaan kerja
Pengendalian bahan adalah pergerakan dan penyimpanan bahan dengan kos yang paling rendah melalui penggunaan metode dan peralatan yang sepatutnya
Apakah hubungan antara Man-hour analysis dengan pekerja?
Jumlah kerja yang dilakukan oleh pekerja purata dalam satu jam
Kos bayaran pekerja dibuat untuk mengambil tahu jumlah duit yang digunakan untuk membayar gaji
Merujuk kepada peruntukan berkenaan supaya tidak melebihi angaran kos pekerja yang telah ditetapkan.
Mendokumenkan sebarang jenis pembangunan, menyediakan sejarah yang mudah difahami dan membantu penonton memahami tren yang lalu dan berterusan
Apakah hubungan antara pemasangan dengan pengujian?
Pemasangan ialah kerja untuk mengabungkan semua komponen
Pengujian adalah untuk memastikan semua komponen mekanikal mengalirkan arus elektrik
Pengujian adalah untuk memastikan semua komponen berfungsi dan tidak mempunyai kesilapan
Pemasangan ialah kerja untuk menggabungkan semua jenis komponen dan bila melakukan pengujian dapat mengenal pasti bahagian yang tidak berfungsi dan telah rosak
Pernyataan di atas menerangkan tentang maksud penerimaan pelanggan.
Melalui pernyataan di atas sebelum pelanggan menerima sesebuah projek,terdapat dua laporan yang perlu di bangunkan iaitu laporan ujian penerimaan tapak dan laporan ujian prestasi system.
Apakah perbezaan antara dua jenis laporan yang dibangunkan?
I. Memudahkan penghantaran dan penerimaan barang dari dalam dan luar kawasan
II. kebolehan atau keupayaan sistem beroperasi secara maksimum prestasi yang dikehendaki
III. Kelasakan suatu projek sistem yang dibangunkan dan tahan lama 5 tahun hingga 10 tahun
IV. kesesuaian tempat projek atau produk yang hendak dilakukan prosedur installation dan commissioning.
I dan II
I dan III
II dan III
II dan IV
Susun langkah-langkah menjalankan proses troubleshoot pada sistem automasi ?
I. Kenalpasti masalah dari segi proram atau hardware.
II. Hentikan projek jika terdapat kerosakan atau masalah.
III. Jika masalah berpunca dari hardware, uji komponen tersebut dan juga pendawaian.
IV. Menjalankan projek yang telah diprogramkan untuk menguji jika terdapat kerosakan dan masalah .
V. Jika masalah berpunca dari program, betulkan semula program mengikut kehendak yang dikehendaki.
IV, II, I, V, III.
III, I, V, II, IV
I, III, IV, II, V
I, V, III, IV, II
Pilih penyataan yang benar mengenai kualiti penulisan laporan yang betul.
I. Ringkas tetapi padat
II. Mencakupi semua perkara yang perlu
III. Lengkap dari segi data, fakta dan maklumat
IV. Berikan penerangan yang betul sekurang-kurangnya 200 kata perkataan.
I, II, III
I, II, IV
I, III, IV.
II, III, IV.
Pilih penyataan yang benar mengenai tujuan laporan.
I. Mengenalpasti masalah
II. Mencadangkan penyelesaian
III. Membuat rekod sesuatu peristiwa
IV. Menilai kemampuan kerja atau aktiviti seseorang.
I, II, III
I, II, IV.
I, III, IV
II, III, IV
Apakah data perlu ada dalam buku log pada sistem automasi ?
I. Harga.
II. Fakta.
III. Tarikh.
IV. Proses.
I, II, III
I, II, IV
I, III, IV
II, III, IV
Berikut adalah langkah keselamatan semasa mengendalikan pengaturcaraan?
I. Pastikan tangan dalam keadaan kering.
II. Periksa pendawaian sebelum ON power supply.
III. Sambung kabel komunikasi semasa sistem dalam keadaan ON.
IV. Minta kebenaran dari yang berkuasa sebelum membuka komputer
I, II, III.
I, II, IV.
I, III, IV.
II, III, IV.
Susun langkah-langkah untuk membuat pengujian pada sistem automasi ?
I. Membuat pengujian mengunakan multimeter.
II. Membuat pemeriksaan secara visual pada litar pemasangan.
III. Membuat pengantian atau pembetulan pada masalah yang dijumpai.
IV. Memahami litar skematik supaya tidak berlaku kesalahan semasa pemasangan.
I, II, III, IV.
III, I, IV,II.
I, III, IV, II.
IV, II, I, III.