Safety Management Quiz

Total questions: 24

Worksheet time: 12mins

Name
Class
Date
1.

At the project planning stage, which one of the following must be considered for the safe management of deliveries to the site?

a)

Warning signs for pedestrians

b)

Drivers working in public areas

c)

Proximity to schools and hospitals

d)

Restrictions on site vehicle use

2.

A dry powder fire extinguisher extinguishes Class B fires by...

a)

forming a barrier of fine powder against other sources of ignition

b)

creating a dust cloud that absorbs heat and settles over the fire

c)

slowly cooling the fire with the fine crystal powder elements

d)

smothering the whole fire and starving it of oxygen

3.

Which of the following would be classed as a competent person to assess the ground placement of a crane or mobile lifting equipment?

a)

Lift supervisor

b)

Lift planner

c)

Crane operator

d)

Site engineer

4.

In terms of the Plan, Do, Check, Act model, which one of the following describes the Plan stage?

a)

Profile risks, organise for health and safety, implement the plan

b)

Determine policy and plan for its implementation

c)

Review performance, plan, and act on previous lessons learned

d)

Plan performance, and monitor and investigate events

5.

A hot-work permit has been issued for a large timber-frame project. For each day that the permit is in force, what is the minimum amount of time required between the hot work ending and the site closing?

a)

Two hours

b)

One hour

c)

90 minutes

d)

30 minutes

6.

One of the main requirements of the Personal Protective Equipment at Work (Amendment) Regulations 2022 is that personal protective equipment is...

a)

inspected regularly and only maintained by a site supervisor

b)

assessed each day to ensure that it remains fit for purpose

c)

supplied and used wherever there are risks that cannot be controlled in other ways

d)

purchased and used in workplaces where thes are significant risks to health and safety

7.

Which of the following is not a requirement for a site compound where liquefied petroleum gas (LPG) containers are stored?

a)

It is on a level base of compacted earth, concrete or paving slabs

b)

It is surrounded by a secure chain fence that is at least 1.8 m high

c)

It has signs displayed that prohibit the operation of plant in the area

d)

It has sufficient shelter to prevent container exposure to extreme weather

8.

An automated external defibrillator (AED) should be used when someone is...

a)

suffering from severe shock

b)

having a sudden cardiac arrest

c)

suffering from heavy bleeding

d)

having an allergic reaction

9.

Which one of the following is true in relation to hearing damage?

a)

It can be treated with ongoing medication

b)

It can be reversed if caught early enough

c)

It is only caused by noisy working environments

d)

It is made worse by the ageing process

10.

When controlling hazardous work in an excavation, which of the following must be used to communicate control measures between managers and workers?

a)

A visual inspection

b)

A safety briefing

c)

A permit to work

d)

A warning sign

11.

Under the Regulatory Reform (Fire Safety) Order 2005, which one of the following must be a priority on a construction site?

a)

Suitable and fire-rated escape doors and routes

b)

A fire risk assessment that is regularly review

c)

Sufficient and well-maintained firefighting equipment

d)

The appointment of a fire warden for every 20 workers

12.

A hammer drill fitted with a vibration timer device is beeping at a high pitch. This is...

a)

a safeguard to ensure that the drill is examined for damage, as vibration exposure protection could be compromised

b)

a warning alert activated only when the device recognises that the tool is being used incorrectly, and that the operator needs training

c)

a mandatory automatic malfunction alert warning, which is a requirement of the Control, of Vibration at Work Regulations 2005

d)

a warning to stop, as the device captures vibration output and has detected that maximum levels have been reached

13.

Prior to a hot-work activity being undertaken within a confined space, and following the completion of the risk assessment, what else must be done before work can start?

a)

Getting appointed sub-contractors to review their own safety procedures and permits

b)

Thoroughly ventilating for 48 hours to remove any flammable or explosive gases

c)

Testing the atmosphere to confirm that no flammable or explosive gases are present

d)

Installing additional temporary ventilation and making a fire extinguisher available

14.

To comply with the Work at Height Regulations 2005, any fall distance from the working platform into the safety net must be...

a)

six metres below the working area

b)

enough to allow a person to stand up

c)

twice the height of the average worker

d)

as little as reasonably practicable

15.

Who is responsible for ensuring that there are suitable welfare facilities on site before any work starts?

a)

The client

b)

The Health and Safety Executive

c)

The principal designer

d)

The designer

16.

Which one of the following is not a key stage of a control of substances hazardous to health (COSHH) risk assessment?

a)

Eliminate the use of the substances

b)

Identify the hazardous substances

c)

Identify who is at risk from the substances

d)

Erect warning signs near substance cabinets

17.

Work needs to be carried out near live electricity cables, and a risk assessment has been undertaken. Identify which other document must be in place before work can begin.

a)

Variation order

b)

Permit to work

c)

Electrical certificate

d)

Inspection checklist

18.

What should you do if you see construction materials stored under a tree?

a)

Nothing, trees are not protected and materials can be stored anywhere

b)

Make sure that the tree is watered regularly until the materials are removed

c)

Make sure that the materials are removed if the tree shows signs of damage

d)

Make sure that the materials are removed and tree protection fencing is installed

19.

The co-ordination of work during the construction phase of a project that involves more than one construction company is the responsibility of the...

a)

designer

b)

principal designer

c)

client

d)

principal contractor

20.

To operate and use a scissor lift, the operator must hold which one of the following to evidence competency?

a)

Construction Industry Scaffolders Record Scheme (CISRS) card

b)

Powered Access Licence (PAL) card

c)

Prefabricated Access Suppliers' and Manufacturers' Association (PASMA) card

d)

Push Around Verticals (PAV) card

21.

Which one of the following pieces of information must be displayed on the fire action notice?

a)

The correct extinguisher for each type of fire

b)

Instructions for extinguishing a fire

c)

How to call the fire and rescue service

d)

The location of the nearest fire alarm call point

22.

The safe working load of a mobile elevated working platform should not be exceeded, because....

a)

this would cause the tyres to deflate

b)

it would not be able to reach full working height

c)

it would not be able to gain traction over uneven ground

d)

this would create instability when in use

23.

If workers are not following the safe system of work and moving slate tiles dangerously onto a roof, what must be done?

a)

Find out why they are doing it like that, and change the risk assessment accordingly

b)

Identify who started doing it that way, and issue them with an on-the-spot verbal warning

c)

Tell them to stop, and that they need to follow the agreed procedure for the task

d)

Let them carry on, as no injuries have occurred and they are getting through the work faster

24.

When selecting contractors, which one of the following would provide evidence of competence?

a)

Company and transport logos

b)

Copies of their equipment breakdown insurance policies

c)

Their staff retention data

d)

Examples of risk assessments and method statements