ConTech M06 - Floor Systems

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

In braced frame construction, the corner posts and beams are:

a)

nailed

b)

mortised and tenoned

c)

pinned

d)

glued

2.

In balloon framing, the second floor joists sit on a:

a)

plate nailed to the top plate of the wall assembly below

b)

1x4 or 1x6 ribbon 'let in' to the wall studs

c)

sill attached to the top of the wall assembly below

d)

2x4 'let in' to the wall studs

3.

Shrinkage in wood framing members occurs mainly:

a)

lengthwise

b)

both lengthwise and on the wide width

c)

on the wide width

d)

in the middle

4.

The most common framing method used in modern residential and light commercial construction is ___________ framing.

a)

brace

b)

balloon

c)

platform

d)

post-and-beam

5.

The method of construction that experiences a relatively large amount of settling as a result of shrinkage is _________ framing

a)

platform

b)

brace

c)

balloon

d)

post-and-beam

6.

The method of construction that features widely spaced, heavy framing members is _________ framing

a)

brace

b)

balloon

c)

platform

d)

post-and-beam

7.

In a set of working drawings, the details about the floor used in a building most likely will be defined in the:

a)

architectural drawings

b)

structural drawings

c)

mechanical plans

d)

site plans

8.

The letter H on the diagram is pointing to the:

a)

sill

b)

termite shield

c)

bearing plate

d)

sill sealer

9.

The letter C on the diagram is pointing to the:

a)

tail joist

b)

trimmer joist

c)

joist header

d)

common joist

10.

The letter F on the diagram is pointing to the:

a)

tail joist

b)

trimmer joist

c)

joist header

d)

common joist

11.

The letter G on the diagram is pointing to the:

a)

tail joist

b)

trimmer joist

c)

joist header

d)

common joist

12.

The letter L on the diagram is pointing to the:

a)

beam or girder

b)

column

c)

joist header

d)

triple joist

13.

For a given size, the type of girder with the least strength is the _______ girder.

a)

built-up

b)

solid lumber

c)

LVL

d)

glulam

14.

For a given load, the size of the girder __________ if the span between its support columns is increased.

a)

can be increased

b)

must be increased

c)

can remain the same

d)

must be decreased

15.

The weight of all moving and variable loads that may be placed on a building is referred to as _____ weight.

a)

dead

b)

live

c)

variable

d)

permanent

16.

Notches for pipes made in the top or bottom flanges of wood I-beams shall not exceed _____ of the depth.

a)

one-fourth

b)

one-half

c)

one-sixth

d)

None of the above; notches should never be made in the flanges of wood I-beams.

17.

Which of the following panels is not used for subflooring?

a)

Plywood

b)

Oriented Strand Board (OSB)

c)

Tongue-and-groove plywood

d)

Gypsum drywall

18.

The first task that should be done when constructing a floor is to:

a)

lay out and install sill plates

b)

build and install girders and supports

c)

check the foundation for squareness

d)

lay out the sill plates and girders for joist locations

19.

When nailing floor systems, nails should not be spaced closer to one another than ____ their length nor closer to the edge of a framing member than ____ of their length.

a)

one-half; one-half

b)

one-half; one-quarter

c)

one-quarter; one-quarter

d)

one-quarter; one-half

20.

When laying out the sill for joist locations 16" O.C., the first measurement on the sill should be at:

a)

14-1/4"

b)

15-3/8"

c)

16"

d)

15-1/4"