M7: Review Questions (27112)

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

Immediately after nailing the plywood sheathing on a roof frame, you should install .

a)

Plywood clips

b)
A vapor barrier
c)

A felt underlayment

d)

A drip edge

2.

The length of a common rafter for a 20′-wide building with a 10″ rise per foot of run is .

a)
19′-7″
b)

20′

c)

14′-8″

d)

13′

3.

A rafter support that parallels the top plate and the ridgeboard is known as a .

a)
Collar tie
b)

Strongback

c)

Purlin

d)

Ridgeboard

4.

The number of sheets of plywood sheathing needed for a house 30' long with a span of 24' and with 8'' rise per foot of run is . (Assume no overhang.)

a)
18
b)

14

c)

26

d)

28

5.

The roof run measurement is usually equal to .

a)
Twice the span
b)

The distance from the top plate to the ridgeboard

c)

The length of a common rafter

d)

Half the span

6.

When placing underlayment over sheathing for roofs with a slope of 4'' or less, the commonly used roofer's felt is . A. 22 pound B. 15 pound C. 18 pound D. 10 pound

a)

22 pound

b)
15 pound
c)

18 pound

d)

10 pound

7.

The rise per foot of run of a roof with a pitch of is . A. 6'' B. 12'' C. 18'' D. 24''

a)
6''
b)
12''
c)

18''

d)

24''

8.

Which type of roof is considered an efficient design in areas subject to hurricanes?

a)

Gable roof

b)

Hip roof

c)

Gambrel roof

d)

Shed roof

9.

Half the distance from the outside of one exterior wall to the outside of the opposite exterior wall is the _____.

a)

Pitch

b)

Run

c)

Span

d)

Rise

10.

When framing a gable end, it is necessary to measure and cut _____.

a)

Each stud individually

b)

Each pair of studs

c)

Temporary supports

d)

Diagonal braces

11.

A roof that rises 9” for each foot of run has a slope of _____.

a)

9 in 12

b)

12 in 9

c)

6 in 12

d)

12 in 12

12.

The pitch of a roof that has a rise of 8’ and a run of 12’ is _____.

a)

23\frac{2}{3}

b)

13\frac{1}{3}

c)

34\frac{3}{4}

d)

24\frac{2}{4}

13.

A rafter that touches neither the ridge nor the plate is called a _____.

a)

Hip rafter

b)

Cripple jack rafter

c)

Rafter plate

d)

Valley rafter

14.

15. Ceiling joists span the narrow dimension of the building from _____.

a)

A. Top chord to top chord

b)

B. Top plate to ridgeboard

c)

C. Header to header

d)

D. Top plate to top plate

15.

Trusses that carry other trusses or support a large area of roof framing are called _____.

a)

Girders

b)

Beams

c)

Bar joists

d)

Double trusses

16.

The number of common rafters needed to frame a 20'-long gable roof for a house framed on 16'' centers with no overhang is _____.

a)

32

b)

15

c)

30

d)

16

17.

The roof framing system in which carpenters assemble joists and rafters on-site is called _____.

a)

A. A site-assembled system

b)

B. A truss system

c)

C. A fabricated system

d)

D. A stick-built system

18.

To determine the final measurement when laying out a common rafter, it is necessary to deduct _____.

a)

Half the thickness of the top plate

b)

Half the thickness of the ridgeboard

c)

Nothing

d)

Half the thickness of the rafter

19.

A strongback is installed to _____.

a)

Reinforce the ridgeboard

b)

Straighten and strengthen the ceiling joists

c)

Frame a roof opening

d)

Temporarily support rafters

20.

A waterproof underlayment should be used along roof edges _____.

a)

In cold climates where snow accumulates

b)

In areas prone to hurricanes

c)

In coastal locations

d)

In tropical climates

21.

The distance a rafter rises vertically for each foot of run is known as the _____.

a)

Unit rise

b)

Projection

c)

Slope

d)

Rise

22.

The type of roof that has four sides running toward the center of the building is the _____.

a)

Hip roof

b)

Shed roof

c)

Gable roof

d)

Gable and valley roof

23.

When rigging a truss with a span of 36’, you must use a _____.

a)

Spreader bar

b)

Single choker

c)

Triple choker

d)

Two chokers

24.

A roof with slope of 4 in 12 has a rise per foot of run of _____.

a)

8’’

b)

16’’

c)

4’’

d)

12’’

25.

The upper ends of the outside ends of ceiling joists must be cut

a)
Flush with the top plate edge
b)

At a 45-degree angle

c)

To match the rafter pitch

d)

With a bird's mouth

26.

Which of the following statements about ceiling joists is not true?

a)

A. They usually span the narrow width of the building

b)

B. They should never be spliced between bearing points

c)

C. They provide a nailing surface for finishing material

d)

D. They are usually in line with the wall studs

27.

Letter A indicates the . A. Run B. Slope C. Rise D. Span

a)
Run
b)

Slope

c)

Rise

d)

Span

28.

The horizontal distance from the outside of the top plate to the center of the ridgeboard is called the .

a)
Run
b)

Slope

c)

Span

d)

Pitch

29.

Positioning or installing trusses must be done under the supervision of a(n) .

a)

Architect

b)
Experienced crane operator
c)

Civil engineer

d)

Qualified rigger

30.

Letter B indicates the _____

a)

Run

b)

Slope

c)

Span

d)

Rise

31.

Double trimmers are used when framing _____

a)

Valleys

b)

Roof openings

c)

Overhangs

d)

Gable ends

32.

The greater the unit rise of the rafter, _____

a)

The harder it is to cut accurately

b)

The stronger it must be

c)

The steeper the roof

d)

The flatter the roof

33.

Open web steel joists are typically attached to the structural steel frame _____

a)

With anchor bolts

b)

By welding

c)

Using lag bolts

d)

Using sheet metal screws

34.

When you are using a Speed Square™, the length of the rafter is determined by _____

a)

Multiplying the run by the rise

b)

Reading it directly from the square

c)

Using rafter tables in the instruction manual

d)

Stepping the square

35.

The letter C represents the _________.

a)

slope

b)

rise

c)

run

d)

span