WorksheetsAssignment-1
Total questions: 5
Worksheet time: 5mins
Name
Class
Date
1.
The process of removing excess material from a workpiece to achieve the desired shape is called
(a)
2.
A ship floats in seawater because of which principle?
a)
Pascal’s Law
b)
Archimedes’ Principle
c)
Bernoulli’s Principle
d)
Newton’s Third Law
3.
If a production line is experiencing frequent breakdowns due to poor maintenance, a (a) maintenance strategy should be implemented to prevent failures before they occur.
4.
When selecting a manufacturing process, factors such as material properties, cost, and production volume must be considered in a (a) analysis.
5.
To reduce waste in a manufacturing system, a company can implement a (a) system that focuses on continuous improvement and eliminating non-value-added activities.
100 %