wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Assignment-1

Total questions: 5

Worksheet time: 5mins

Name
Class
Date
1.

The process of removing excess material from a workpiece to achieve the desired shape is called

(a)  

2.

A ship floats in seawater because of which principle?

a)

Pascal’s Law

b)

Archimedes’ Principle

c)

Bernoulli’s Principle

d)

Newton’s Third Law

3.

If a production line is experiencing frequent breakdowns due to poor maintenance, a (a)   maintenance strategy should be implemented to prevent failures before they occur.

4.

When selecting a manufacturing process, factors such as material properties, cost, and production volume must be considered in a (a)   analysis.

5.

To reduce waste in a manufacturing system, a company can implement a (a)   system that focuses on continuous improvement and eliminating non-value-added activities.