Font size
WorksheetsLH Active L1: Outbound Review
Total questions: 25
Worksheet time: 18mins
What are the three (3) types of orders Active WM uses for Order Planning?
Transportation Order
(TO)
Distribution Order
(DO)
Purchase Order
(PO)
Original Order
(OO
True or False: Order planning decides how your orders are selected, allocated, and released
False
True
True or False: Order Planning does NOT determine the best picking and shipping methods each order will use.
False
True
A (a) processes orders based on a variety of criteria, A (b) is usually for orders requiring rapid fulfillment
What UI screens can be used to view and manage waves? (Select all that apply)
Wave Runs UI
Wave Chart UI
Order Planning Strategy UI
Monitoring Dashboard
The order flows through a series of steps for fulfillment, these steps are called the (a)
(a) is the process of designating a specific location/item/LPN for a distinct purpose.
True or False: The Allocation Method is used by the allocation process to determine how to allocate.
True
False
True or False: An Allocation Zone is an identifier assigned to a storage location for the purpose of inventory allocation
True
False
When no quantity or only part of the actual quantity is available to be allocated, the fulfills the order with current inventory and cancels the remaining quantity, writing a PIX transaction.
What allocation shortage method is this?
Deselect Need
Allocate Partial and Deselect Remaining
Cancel Need
Allocate Partial and Cancel Remaining
True or False: Replenishment is the process of replacing inventory as it is consumed during order fulfillment activity
False
True
(a) replenishment will replen based on orders. (b) replenishment will replen to location capacity
True or False: Manual replenishment is called Lean Time replenishment
True
False
True or False: Putaway condition codes will prevent the movement of inventory OUT of a location
True
False
True or False: During Cubing, Active WM determines the contents of oLPNs before they are Picked and Packed
True
False
(a) Cubing, the item dimensions are considered along with the weight and volume of each item to ensure that the item can geometrically fit into the remaining space in a container
True or False: Active WM does NOT support Pallet Cubing
True
False
True or False: Work Release is NOT responsible for releasing work to the floor for order fulfillment.
True
False
(a) determines the most important work and prioritizes resources (b) creates efficient tasks for the work
True or False: "Work” is the unit through which work release manages and allocates equipment capacity
False
True
True or False: Picking can be Cubed or Non Cubed
False
True
True or False: The picking screen flow is NOT configurable
True
False
True or False: The Graphical Pack Station increase packing accuracy, speed, and reducing fatigue for the packers over time.
True
False
What are the two (2) reasons for using oLPN Consolidation
Consolidate
Sort
Hold
Combine
The ____ ___ is the combination of service provider, mode and service levels
(a)
