wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

BSD 3B Quiz No. 2

Total questions: 14

Worksheet time: 5mins

Name
Class
Date
1.

A stable, concentrated composition that consists of a number of secondary spaces grouped around a large, dominant, central space.

a)

Spatial Organization

b)

Centralized Organization

c)

Radial Organization

d)

Linear Organization

2.

A simple diagram that will show you what activities take place in the space and the relationship between these activities.

a)

Bubble Plan

b)

Scaled Plan

c)

Detailed Plan

d)

Detailed-Scale Plan

3.

It is a construction industry professional with expert knowledge on construction costs and contracts.

a)

Contractor

b)

Quantity Surveying

c)

Quantity Surveyor

d)

Civil Engineer

4.

What is the typical live load for School classrooms as specified in ASCE 7-95?

a)

100psf

b)

50 psf

c)

125 psf

d)

40 psf

5.

Chairs, furnitures, temporary stores are considered as _____.

a)

Dead loads

b)

Live loads

c)

Seismic Loads

d)

None of the above.

6.

What are the datas for estimation?

a)

Drawing, Rates, Specifications

b)

Drawing, Expenses, Price

c)

Costs, Drawing, Labor

d)

Specifications, Drawing, Profit

7.

Type of specifications that requires the use of a single approved product type for any particular installation.

a)

Proprietary Specification

b)

Performance Specification

c)

Detailed Specification

d)

General Specification

8.

A business document asking contractors or suppliers to propose solutions for a project.

a)

Request for Solution

b)

Request for Proposal

c)

Project Proposal

d)

Request for Project Solution

9.

Key factor in determining the soil's ability to support weight

a)

Dry Density Test

b)

Specific Gravity Test

c)

Moisture Content Test

d)

Permeability Test

10.

This represents the total amount of supplies and labor required to finish a project.

a)

Cost of Materials

b)

Labor Hours and Labor Cost

c)

Quantity Takeoffs

d)

Joint Costs

11.

Joint Costs refer to ________.

a)

expenses, such as administrative and overhead expenses, that have no direct impact on the project's real expenditures.

b)

estimated costs and breakdown of the labor and raw materials required to complete a project are included in the subcontractor quotation.

c)

the total amount of supplies and labor required to finish a project.

d)

expenditures that benefit more than one project objective.

12.

What is "i" in Darcy's Law?

a)

Soil

b)

Permeability

c)

Total head

d)

Hydraulic gradient

13.

Which of the choices is not a requirement for a building permit application?

a)

Certified true copy of the property's title

b)

Tax declaration

c)

National Police Clearance

d)

Detailed plans

14.

How many properly filled-up application forms duly signed and sealed by engineers concerned are needed for Building Permits?

a)

1

b)

3

c)

4

d)

5