Site and Building Layout Study Guide

Total questions: 27

Worksheet time: 14mins

Name
Class
Date
1.

Construction drawings and documents used by builders represent a legal agreement between who? Pg 148

a)

Builders and Architects

b)

Owner and Contractor

c)

Builders and Engineers

d)

Owner and Suppliers

2.

A plumb wall is perfectly _______. Pg 149

a)

vertical

b)

horizontal

c)

diagonal

d)

curved

3.

Which two construction drawings or plans are primarily used when laying out a site or building? Pg 150

a)

Architectural and CIvil

b)

Elevation and Section

c)

Foundation Plan and Roof Plan

d)

Electrical Plan and Plumbing Plan

4.

Who should perform the layout activities that establish legal property lines or boundaries? Pg 150

a)

Registered Surveyors

b)

Architects

c)

Registered Engineers

d)

Contractors

5.

When no permanent object is available as a primary control point marker a concrete ______ can be used. Pg 152

a)

monument

b)

footing

c)

stake

d)

museum

6.

Site plans include both man-made features and _______ features. Pg 153

a)

natural

b)

artificial

c)

synthetic

d)

constructed

7.

A setback is the distance between which 2 lines?

a)

Property line and building line

b)

Street line and property line

c)

Building line and street line

d)

Fence line and property line

8.

All finish-grade references on a site plan are keyed to a reference point known as a(n) __________. Pg 154

a)

benchmark

b)

datum point

c)

elevation mark

d)

survey point

9.

If a perfectly plum line and a perfectly level line intersect they will be perpendicular and form an angle of ______ degrees. Pg 159

a)

90

b)

45

c)

60

d)

120

10.

An angle greater than 90 degrees but less than 180 degrees is _________. Pg 160

a)

obtuse

b)

acute

c)

right

d)

reflex

11.

The sum of 3 interior angles of any triangle is always ________. Pg 161

a)

180 degrees

b)

90 degrees

c)

360 degrees

d)

270 degrees

12.

If 2 angles of a triangle are 28 degrees and 42 degrees, what does the unknown angle equal?

a)

110 degrees

b)

100 degrees

c)

90 degrees

d)

80 degrees

13.

What should be completed to identify potential hazards that may be encountered when laying out a job site? Pg 164

a)

A risk assessment

b)

A job hazard analysis

c)

A site inspection

d)

A hazard checklist

14.

Site layout involves making horizontal and vertical distance measurements by a process called taping or ________. Pg 165

a)

chaining

b)

roping

c)

measuring

d)

choking

15.

All types of levels and transits are mounted on what for proper operation? Pg 165

a)

Tripod

b)

Stand

c)

Base

d)

Platform

16.

What tool/instrument is described as a short handheld telescope with a bubble level built into it? Pg 169

a)

A laser plumb

b)

A leveling rod

c)

A hand sight level

d)

A transit

17.

When using a leveling rod, the target is moved up or down on the rod until the ____ on the vernier scale is lined up with the crosshairs of the leveling instrument. Pg 170

a)

pointer

b)

mark

c)

indicator

d)

zero

18.

One of the oldest types of levels is the ______? Pg 171

a)

Transit level

b)

Water level

c)

Spirit level

d)

Laser level

19.

When using a water level, what does the length of the tube determine? Pg 171

a)

The accuracy of the measurement

b)

The speed of water flow

c)

The volume of water it can hold

d)

The distance it can measure

20.

What is one advantage of using a rotating beam laser level? Pg 175

a)

It is less accurate than other levels.

b)

It is more affordable than other types.

c)

It requires manual adjustment.

d)

It allows 1 person instead of 2 to perform many operations

21.

How many people are required to operate a rotating beam laser level? Pg 175

a)

One person

b)

Two people

c)

Three people

d)

Four people

22.

When measuring a horizontal distance or across a steep slope, measure distance in a series of steps while holding the tape level. This process is called what?

a)

Breaking the tape

b)

Differential leveling

c)

Chain breaking

d)

Pacing

23.

Measuring vertical distances or elevations is called ________. Pg 184

a)

differential leveling

b)

surveying

c)

mapping

d)

triangulation

24.

Differential leveling is used to set _____ ______. Pg 184

a)

reference lines

b)

elevation points

c)

grade stakes

d)

survey markers

25.

What are batter boards used for? Pg 187

a)

To support concrete forms

b)

To mark the boundaries of buildings and the center of footings

c)

To measure the depth of excavation

d)

To hold scaffolding in place

26.

What rule or method is used to lay out and/or check a 90 degree angle? Pg 188

a)

Protractor Method

b)

3-6-9 rule

c)

3-4-5 rule

d)

Angle Bisector

27.

The 3-4-5 rule also applies if you multiply each number in the ratio (3, 4, and 5) by the same number.

a)

TRUE

b)

FALSE