wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Tutorial 1

Total questions: 15

Worksheet time: 9mins

Name
Class
Date
1.

What are the functions of surveying ?

a)

To determine the existing relative horizontal and vertical positions and to establish marks to control construction or to indicate land boundaries.

b)

To determine longitude and latitude and the relative elevation.

c)

To determine the shape of a piece of land and how its elevation changes across the landscape.

d)

To determine the landscape of the land and how many acres are in the section being surveyed.

2.

What are the functions of surveying ?

a)

To determine the existing relative horizontal and vertical positions and to establish marks to control construction or to indicate land boundaries.

b)

To determine longitude and latitude and the relative elevation.

c)

To determine the shape of a piece of land and how its elevation changes across the landscape.

d)

To determine the landscape of the land and how many acres are in the section being surveyed.

3.

Identify this tool

a)

Total Station

b)

Transit

c)

Automatic Level

d)

Sextant

4.

Select which tool is called an Automatic Level or Builder's Level

a)
b)
c)
d)
5.

Identify the Level Rod

a)
b)
c)
d)
6.

Identify the instrument Tripod

a)
b)
c)
d)
7.

What are the functions of surveying ?

a)

To determine the existing relative horizontal and vertical positions and to establish marks to control construction or to indicate land boundaries.

b)

To determine longitude and latitude and the relative elevation.

c)

To determine the shape of a piece of land and how its elevation changes across the landscape.

d)

To determine the landscape of the land and how many acres are in the section being surveyed.

8.

The three basic quantities that are measured in surveying are ...

a)

Heights

b)

Temperature

c)

Angles

d)

Distances

e)

Pressure

9.

Survey stations may be marked on the ground using a:

a)

Pole

b)

Rod

c)

Pegs

d)

Pointer

10.

The spatial location of an actual or planned structure or set of structures is termed as

a)

Plot

b)

Site

11.

Elements of site plan are

a)

Building foot print

b)

Pathways and landscape

c)

Parking and services

d)

Ground floor plan

12.

What are the measurements taken in surveying

a)

Distance, height

b)

Angle and levels

c)

Distance, angle, levels, relative position and relative heights

d)

Relative heights and relative position

13.

The survey in which the surface of the earth is taken as a curvature

a)

Plane survey

b)

Location survey

c)

Geodetic survey

d)

Reconnaissance survey

14.

Offset is the measurement

a)

Distance of the object from survey line which is perpendicular or oblique

b)

Horizontal distance from the object

c)

The line joining two survey stations

15.

The equipment used to mark the sighting station is called

a)

Cross staff

b)

Ranging rod

c)

Clinometer

d)

Line ranger