NEW
Font size
S
M
L
XL
WorksheetsO&M Cost breakdown of a 450 MW floating wind farm per year
Total questions: 12
Worksheet time: 9mins
Name
Class
Date
1.
Operations: Operations control centre cost per year?
a)
532 k€
b)
632 k€
c)
432 k€
d)
832 k€
e)
232 k€
2.
Operations: Training of personnel cost per year?
a)
1.26 M€
b)
0.96 M€
c)
2.26 M€
d)
1.86 M€
e)
1.46 M€
3.
Operations:Onshore logistics cost per year?
a)
332 k€
b)
432 k€
c)
532 k€
d)
582 k€
e)
632 k€
4.
Operations: Technical resource (onshore/offshore) cost per year?
a)
1.16 M€
b)
2.16 M€
c)
3.16 M€
d)
3.46 M€
e)
4.16 M€
5.
Operations: Admin and support staff cost per year?
a)
2.79 M€
b)
3.16 M€
c)
3.16 M€
d)
3.16 M€
e)
3.16 M€
6.
Operations: Insurancecost per year?
a)
3.16 M€
b)
2.16 M€
c)
1.16 M€
d)
3.56 M€
e)
3.61 M€
7.
Maintenance: Turbine maintenance cost per year?
a)
10.32 M€
b)
16.32 M€
c)
32.16 M€
d)
20.15 M€
e)
8,25 M€
8.
Maintenance: Balance of plant maintenance cost per year?
a)
4.45 M€
b)
5.64 M€
c)
6.84 M€
d)
9.84 M€
e)
10.84 M€
9.
Maintenace: Statutory inspections cost per year?
a)
36.93 k€
b)
136.93 k€
c)
200.93 k€
d)
236.93 k€
e)
236.93 M€
10.
Offshore vessels and logistics cost per year?
a)
0.56 M€
b)
2.16 M€
c)
0.96 k€
d)
1.16 M€
e)
1.56 M€
11.
O&M port cost per year?
a)
210.60 k€
b)
210.60 k€
c)
210.60 k€
d)
210.60 k€
e)
210.60 k€
12.
TOTAL COST O&M PER YEAR?
a)
25.5 M€
b)
32.5 M€
c)
37.5 M€
d)
39.5 M€
e)
40.5 M€
Reset
