wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Chapter 2 EMJ33303: REGULATION,STANDARD & BEST PRACTICES

Total questions: 22

Worksheet time: 23mins

Name
Class
Date
1.

Who must comply with the Efficient Management of Electrical Energy Regulations (EMEER) 2008?

a)

Any installation consuming 1,000,000 kWh over six consecutive months

b)

Any installation consuming 3,000,000 kWh or more over six consecutive months

c)

Any installation consuming 5,000,000 kWh over six consecutive months

d)

Any installation consuming 10,000,000 kWh over six consecutive months

2.

What is the penalty for failing to comply with the submission requirements under EMEER 2008?

a)

A fine not exceeding RM10,000

b)

Imprisonment not exceeding 2 years

c)

A fine not exceeding RM5,000 or imprisonment not exceeding 1 year, or both

d)

A fine not exceeding RM2,000

3.

Energy Consumption Calculation EMEER 2008:An installation consumes 3,600,000 kWh of electrical energy over six consecutive months. What is the average monthly energy consumption of the installation?

a)

500,000 kWh

b)

600,000 kWh

c)

700,000 kWh

d)

800,000 kWh

4.

What is the role of a Registered Electrical Energy Manager (REEM) under EMEER 2008?

a)

To manage the implementation of the feed-in tariff mechanism

b)

To audit and analyze total energy consumption or generation

c)

To enforce energy efficiency regulations in industrial facilities

d)

To provide financial assistance for energy audits

5.

Energy Savings Calculation EMEER 2008:A company implements energy-saving measures that reduce its energy consumption by 10%. If the initial energy consumption was 3,000,000 kWh per year, what is the new annual energy consumption after implementing the measures?

a)

2,600,000 kWh

b)

2,700,000 kWh

c)

2,800,000 kWh

d)

2,900,000 kWh

6.

What must an installation that meets the energy threshold under EMEER 2008 do?

a)
  • Submit reports on energy management and savings

b)

Implement energy efficiency measures

c)

Appoint a registered Energy Manager

d)

All of the above

7.

What does MEPS stand for?

a)

Maximum Energy Performance Standard

b)

Moderate Energy Performance Standard

c)

Minimum Energy Performance Standard

d)

Mandatory Energy Performance Standard

8.

Which of the following appliances is NOT covered by MEPS in Malaysia?

a)

Dishwasher

b)

Air Conditioner

c)

Refrigerator

d)

Oven

9.

What is the minimum star rating required for a split unit wall-mounted air conditioner with a capacity up to 25,000 btu/h under MEPS?

a)

b)

c)

d)

10.

What must be included on the Energy Efficiency Label under MEPS?

a)

Star rating, price, and expiry date

b)

Manufacturer, model, star rating, and QR code

c)

Store name and serial number

d)

Product color and warranty

11.

Which agency administers the SAVE 4.0 program?

a)

SEDA with Energy Commission (ST)

b)

KeTSA

c)

Tenaga Nasional Berhad

d)

Department of Environment

12.

What is a key goal of the SAVE 4.0 program?

a)

To ban non-Malaysian made appliances

b)

To encourage the use of high-energy appliances

c)

To increase use of 4- and 5-star rated appliances

d)

To replace all old appliances by law

13.

How much is the maximum e-rebate under SAVE 4.0 for eligible appliances?

a)

RM100

b)

RM200

c)

RM300

d)

RM400

14.

What is the primary objective of the National Building Energy Intensity (BEI) Programme?

a)

To promote the use of renewable energy in residential buildings

b)

To establish a benchmarking system for energy usage efficiency in government buildings

c)

To provide financial assistance for energy audits in commercial buildings

d)

o implement energy performance labelling standards for equipment

15.

How is Building Energy Intensity (BEI) calculated?

a)

Total energy consumption divided by the number of occupants

b)

Total energy consumption divided by the building's floor area

c)

Total energy consumption divided by the number of floors

d)

Total energy consumption divided by the building's height

16.

What does a lower BEI value indicate?

a)

Better energy efficiency

b)

Higher energy consumption

c)

More energy waste

d)

Higher greenhouse gas emissions

17.

What is the minimum energy use requirement to qualify for EACG 1.0?

a)

10,000 kWh/month

b)

50,000 kWh/month

c)

100,000 kWh/month

d)

500,000 kWh/month

18.

What is the minimum timeline for completing the energy audit under EACG 2.0?

a)

6 months

b)

3 weeks

c)

2 months

d)

1 year

19.

Which standard is used for energy management system?

a)

MS 1525:2014

b)

MS 2680: 2017

c)

MS 2670: 2016

d)

MS ISO 50001:2011

20.

which standard applied for non residential building and renewable energy?

a)

MS 2680: 2017

b)

MS 1525:2014

c)

MS ISO 50001:2011

21.

MS 1525:2014 - Energy Efficiency in Non-Residential Buildings:An office building implements an energy-efficient lighting system that reduces its lighting energy consumption by 25%. If the initial lighting energy consumption was 80,000 kWh per year, what is the new annual lighting energy consumption?

a)

55,000 kWh

b)

60,000 kWh

c)

65,000 kWh

d)

70,000 kWh

22.

MS 1525:2019 - Energy Efficiency in Non-Residential Buildings:A non-residential building has a floor area of 5,000 square meters and an annual energy consumption of 600,000 kWh. What is the Building Energy Intensity (BEI) of the building?

a)

130 kWh/m²/year

b)

100 kWh/m²/year

c)

115 kWh/m²/year

d)

120 kWh/m²/year