NEW
Font size
WorksheetsChapter 2 EMJ33303: REGULATION,STANDARD & BEST PRACTICES
Total questions: 22
Worksheet time: 23mins
Who must comply with the Efficient Management of Electrical Energy Regulations (EMEER) 2008?
Any installation consuming 1,000,000 kWh over six consecutive months
Any installation consuming 3,000,000 kWh or more over six consecutive months
Any installation consuming 5,000,000 kWh over six consecutive months
Any installation consuming 10,000,000 kWh over six consecutive months
What is the penalty for failing to comply with the submission requirements under EMEER 2008?
A fine not exceeding RM10,000
Imprisonment not exceeding 2 years
A fine not exceeding RM5,000 or imprisonment not exceeding 1 year, or both
A fine not exceeding RM2,000
Energy Consumption Calculation EMEER 2008:An installation consumes 3,600,000 kWh of electrical energy over six consecutive months. What is the average monthly energy consumption of the installation?
500,000 kWh
600,000 kWh
700,000 kWh
800,000 kWh
What is the role of a Registered Electrical Energy Manager (REEM) under EMEER 2008?
To manage the implementation of the feed-in tariff mechanism
To audit and analyze total energy consumption or generation
To enforce energy efficiency regulations in industrial facilities
To provide financial assistance for energy audits
Energy Savings Calculation EMEER 2008:A company implements energy-saving measures that reduce its energy consumption by 10%. If the initial energy consumption was 3,000,000 kWh per year, what is the new annual energy consumption after implementing the measures?
2,600,000 kWh
2,700,000 kWh
2,800,000 kWh
2,900,000 kWh
What must an installation that meets the energy threshold under EMEER 2008 do?
Submit reports on energy management and savings
Implement energy efficiency measures
Appoint a registered Energy Manager
All of the above
What does MEPS stand for?
Maximum Energy Performance Standard
Moderate Energy Performance Standard
Minimum Energy Performance Standard
Mandatory Energy Performance Standard
Which of the following appliances is NOT covered by MEPS in Malaysia?
Dishwasher
Air Conditioner
Refrigerator
Oven
What is the minimum star rating required for a split unit wall-mounted air conditioner with a capacity up to 25,000 btu/h under MEPS?
What must be included on the Energy Efficiency Label under MEPS?
Star rating, price, and expiry date
Manufacturer, model, star rating, and QR code
Store name and serial number
Product color and warranty
Which agency administers the SAVE 4.0 program?
SEDA with Energy Commission (ST)
KeTSA
Tenaga Nasional Berhad
Department of Environment
What is a key goal of the SAVE 4.0 program?
To ban non-Malaysian made appliances
To encourage the use of high-energy appliances
To increase use of 4- and 5-star rated appliances
To replace all old appliances by law
How much is the maximum e-rebate under SAVE 4.0 for eligible appliances?
RM100
RM200
RM300
RM400
What is the primary objective of the National Building Energy Intensity (BEI) Programme?
To promote the use of renewable energy in residential buildings
To establish a benchmarking system for energy usage efficiency in government buildings
To provide financial assistance for energy audits in commercial buildings
o implement energy performance labelling standards for equipment
How is Building Energy Intensity (BEI) calculated?
Total energy consumption divided by the number of occupants
Total energy consumption divided by the building's floor area
Total energy consumption divided by the number of floors
Total energy consumption divided by the building's height
What does a lower BEI value indicate?
Better energy efficiency
Higher energy consumption
More energy waste
Higher greenhouse gas emissions
What is the minimum energy use requirement to qualify for EACG 1.0?
10,000 kWh/month
50,000 kWh/month
100,000 kWh/month
500,000 kWh/month
What is the minimum timeline for completing the energy audit under EACG 2.0?
6 months
3 weeks
2 months
1 year
Which standard is used for energy management system?
MS 1525:2014
MS 2680: 2017
MS 2670: 2016
MS ISO 50001:2011
which standard applied for non residential building and renewable energy?
MS 2680: 2017
MS 1525:2014
MS ISO 50001:2011
MS 1525:2014 - Energy Efficiency in Non-Residential Buildings:An office building implements an energy-efficient lighting system that reduces its lighting energy consumption by 25%. If the initial lighting energy consumption was 80,000 kWh per year, what is the new annual lighting energy consumption?
55,000 kWh
60,000 kWh
65,000 kWh
70,000 kWh
MS 1525:2019 - Energy Efficiency in Non-Residential Buildings:A non-residential building has a floor area of 5,000 square meters and an annual energy consumption of 600,000 kWh. What is the Building Energy Intensity (BEI) of the building?
130 kWh/m²/year
100 kWh/m²/year
115 kWh/m²/year
120 kWh/m²/year
