wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

CENTRAL HEATING MOCK EXAM

Total questions: 40

Worksheet time: 22mins

Name
Class
Date
1.

In a two pipe system the

a)

flow and return pipework are separated

b)

flow and return pipework are mixed

c)

return water is at the same temperature as the flow water

d)

return water temperature is higher than the flow water.

2.

Which of the following systems does the statement apply to? ‘The temperature of the last radiator on the circuit will be cooler than the first radiator.’

a)

Two pipe system.

b)

One pipe system.

c)

Two pipe reverse return system.

d)

Microbore system.

3.

What is the normal size of an open vent pipe to a fully pumped heating system, in a domestic property?

a)

10 mm.

b)

15 mm.

c)

22 mm.

d)

28 mm.

4.

The connection of an open vent pipe and a cold feed pipe, can be made to a fully pumped system using

a)

an automatic air vent

b)

an injector tee

c)

an air separator

d)

a diverter valve.

5.

A zone valve/two port valve in a pumped heating circuit is designed to

a)

isolate the circuit when the desired temperature is reached

b)

permit the system to be heated to temperatures above 100°C

c)

stop the pump vibrating on its fixing mountings

d)

prevent water from the flow and return pipes mixing.

6.

The main purpose of the vent pipe installed on a heating circuit is to

a)

fill the system with water

b)

provide hot water to the feed and expansion cistern

c)

introduce air into the system

d)

protect the system in the event of over-heating.

7.

Refer to Figure 1. Which one of the following components is indicated by the British Standard symbol shown?

a)

Air Inlet Valve.

b)

Draining Valve.

c)

Double Check Valve

d)

Pressure Relief Valve.

8.

Refer to Figure 2. Which one of the following components is indicated by the British Standard symbol shown?

a)

Drain off valve.

b)

Air Inlet Valve.

c)

Servicing Valve.

d)

Pressure Relief Valve.

9.

A three port mid position diverter valve...

a)

provides priority circulation to the hot water circuit

b)

provides priority circulation to the heating circuit

c)

feeds both the hot water and heating circuits simultaneously

d)

is used to discharge water from the system if it overheats.

10.

Which one of the following can be fitted with a remote sensor?

a)

Diverter valve.

b)

Solenoid valve.

c)

Motorised valve.

d)

Thermostatic radiator valve.

11.

Which one of the following components would be strapped to a hot water storage cylinder?

a)

Programmer.

b)

Motorised valve.

c)

Automatic air release.

d)

Thermostat.

12.

The minimum size of primary cold feed pipe for a hot water heating system is

a)

15 mm

b)

22 mm

c)

28 mm

d)

32 mm

13.

Before filling a central heating system for the first time, it is advisable to

a)

remove all radiators and replace each with a piece of temporary piping

b)

turn the pump on to assist with the filling process

c)

ensure that all radiator valves are left in the closed position

d)

remove the pump (accelerator) and replace with a piece of temporary piping.

14.

Which one of the following assists in the removal of flux from heating systems pipework?

a)

Hot flushing a system as part of the commissioning process.

b)

Adding soap solution to the system after testing.

c)

Setting the working system temperature above 60ºC.

d)

Installing all pipes with a fall away from the drain valves.

15.

Combination boilers are designed to

a)

provide domestic hot water and hot water heating

b)

work with two different fuels at the same time

c)

provide hot water from a storage cylinder and hot water heating

d)

provide hot water heating only, through any type of heat emitter.

16.

When fully draining down a heating system

a)

all the air vents should be closed

b)

the open vent pipe should be capped

c)

the air vents should be opened

d)

the radiator valves should be closed.

17.

A dwelling installed with steel panel radiators controlled by thermostatic valves is being decorated. The radiators will be removed one at a time as the heating is to be kept on during the work. Which one of the following precautions should be taken before removing the radiators?

a)

Remove the head on the thermostatic radiator valve and secure the pressure pin with a decorators cap.

b)

Set the thermostatic radiator valve to the lowest setting.

c)

Set the thermostatic radiator valve to its highest setting.

d)

Open the air release on the radiator, remove the thermostatic valve and block its inlet port temporarily.

18.

The downstairs radiators in a heating system are failing to warm up, whilst the upstairs radiators and the hot water system are only lukewarm. This is most likely to be caused by a faulty

a)

boiler gas valve

b)

pump

c)

heating zone valve

d)

room thermostat.

19.

The safety risk to customers when carrying out rectification work on central heating systems can be minimised by ensuring that

a)

all appropriate temporary earth continuity bonding has been applied

b)

the system is always fully drained for every maintenance activity

c)

all plastic pipework has been correctly bonded to the incoming supply

d)

all thermostatic radiator valves are at their lowest setting.

20.

During maintenance procedures, in addition to turning off the electrical supply to any electrically operated components at the consumer unit, which one of the following safety actions should be taken as part of the safe isolation procedure?

a)

Place a notice on the consumer unit advising that it should not be used.

b)

Ask the customer to turn off the supply and explain that it is their responsibility.

c)

Turn off the cold water supply to the heating appliance to undertake the work.

d)

Lock off the MCB and provide a warning notice on the consumer unit.

21.

The main objective of installing a central heating system in a property is

a)

Thermal comfort

b)

To allow customer control of timings

c)

To conserve fuel

d)

To fully heat a property up to 180C.

22.

What is this component called

a)

Central heating booster pump

b)

Central heating circulation pump

c)

Central heating control valve

d)

Shower booster pump

23.

What is the purpose of a pressure relief valve in a sealed heating system?

a)

To discharge pressure to a safe location if required

b)

To isolate the flow of water

c)

To prevent lock out and prolong circulator life

d)

To control the flow of water to the hot water cylinder

24.

What building regulation covers central heating systems?

a)

Part G

b)

Part L

c)

Part A

d)

Part H

25.

When positioning a single room thermostat, it’s recommended height from ground level is

a)

1m

b)

1.5m

c)

2m

d)

2.5m

26.

What is the image shown used for?

a)

Clearing the pump

b)

Venting the boiler interlock

c)

Charging the radiators

d)

Bleeding the radiators

27.

What does this component do?

a)

controls the hot water temperature

b)

controls the room temperature

c)

controls the boiler

d)

none of the above

28.

What kind of boiler can you see here?

a)

system boiler

b)

conventional boiler

c)

combination boiler

d)

thermal store

29.

How high should the open vent pipe on a central heating system extend?

a)

150mm above the water line

b)

250mm above the water line

c)

350mm above the water line

d)

450mm above the water line

30.

What is the name of this heating system

a)

Y Plan

b)

S Plan

c)

C Plan

d)

A Plan

31.

This image shows a?

a)

A Auto air vent

b)

A Radiator valve

c)

A drain off

d)

A circulator

32.

What type of system is shown here?

a)

Two pipe semi gravity with heat sink

b)

C plan plus two pipe semi gravity

c)

One pipe gravity system

d)

Oil fueled semi gravity two pipe system

33.

What is the title of the diagram shown in the image?

a)

Two-pipe semi-gravity

b)

Single-pipe gravity

c)

Three-pipe semi-gravity

d)

Two-pipe with Heat Sink

34.

What system is this?

a)

Fully Pumped Y-Plan

b)

Fully Pumped S-Plan

c)

Fully Pumped with Heat sink

d)

Two Pipe Semi Gravity

35.

For an open-vented system with a head pressure of 8m, what would be the test pressure?

a)

4 bar

b)

8 bar

c)

2 bar

d)

1.2 bar

36.

What is the normal capacity of this component?

a)

4 Litres

b)

10 Litres

c)

18 Litres

d)

24 Litres

37.

What is Delta T

a)

Weight of the cistern

b)

The pump speed

c)

Room temperature divided by boiler temperature

d)

The difference between the temperature of the radiator and the room

38.

What is this type of panel radiator?

a)

Single Panel

b)

Double Panel, Single Convector Fins

c)

Single Panel, Single Convector fins

d)

Double Panel, Double Convector fins

39.

What is this type of panel radiator?

a)

Single Panel

b)

Double Panel, Single Convector Fins

c)

Single Panel, Single Convector fins

d)

Double Panel, Double Convector fins

40.

What is the primary purpose of lock-shield valves in a radiator system?

a)

To allow the customer to adjust the temperature

b)

To balance the system by the plumber/engineer

c)

To increase water pressure

d)

To decorate the radiator