1.

An ammeter in combination with which other kind of meter could measure power?

a)

Ohmmeter

b)

Voltmeter

c)

Energy meter

d)

Pyranometer

2.

What is the most cost effective, yet sufficient method for marking for a PV label?

a)

Handwriting with permanent marker

b)

Engraving on a NEMA rated disconnect

c)

Permanent sticker

d)

Handwriting on permanent sticker indoors only

3.

Which component most commonly has a fuse in a modern PV system?

a)

Inverter

b)

Dc-to-dc converter

c)

PV module junction box

d)

Dc combiner

4.

What is BIPV?

a)

PV that also replaces building materials

b)

PV that can absorb solar energy from both sides to take advantage of reflected light

c)

PV that is both positively and negatively grounded

d)

PV that is transparent

5.

What does autonomy refer to when sizing a battery bank?

a)

The battery bank is consisting of only one type of battery chemistry

b)

The battery cells are all connected in one series string

c)

The battery management system can control the charge/discharge without human input

d)

How long a battery bank can last without being charged

6.

What would be the expected output at Standard Test Conditions for a PV module with 20 PV sources in series, each with a circuit Voc of 44V, Vmp of 35.2V, power of 305W, and Isc of 9.27A?

a)

704V and 8.66A

b)

600V and 8A

c)

1000V and 8.2A

d)

700V and 9.27A

7.

What is the power of the array at STC?

There are 4 PV source circuits of 10 PV modules each

Given: Module information: Power = 250W, Open Circuit Voltage = 40V, Maximum Power Voltage = 35V,

Short Circuit Current = 8A, Maximum Power Current = 7.14A, Temp Coefficient for Voltage −0.33%/°C, CEC Power 220W,

NOCT 48°C Inverter information: Low MPPT voltage 230V, Inverter maximum input voltage 550V.

a)

10kW

b)

110kW

c)

1000W

d)

40kW

8.

What kind of PV system is used so that people have power if the utility ceases to exist, but can still work with the utility?

a)

Stand-alone

b)

Direct-coupled

c)

Multimode

d)

Grid-tied hybrid

9.

If we wanted to calculate an average power, what would we do mathematically?

a)

a. Take demand charges and divide by time

b)

b. Divide energy by time

c)

c. Divide Ah by time

d)

d. Divide resistance by power

10.

Which characteristics of a wire would lead to more voltage drop?

a)

a. Long and wide

b)

b. Short and wide

c)

c. Long and thin

d)

d. Short and thin

11.

What is the most appropriate and cost-effective rating of an enclosure for exposed circuit conductors mounted on an outside wall?

a)

NEMA 3R

b)

NEMA 11

c)

NEMA 4X

d)

NEMA 12

12.

Which is the best tilt angle for annual production in most of the USA (temperate latitudes)?

a)

Latitude +15 degrees

b)

Latitude -15 degrees

c)

30 degrees

d)

Longitude tilt

13.

What is the total energy produced when a 500W/m² solar irradiance is applied over an area for 4 hours?

a)

20kWh/m²

b)

2kWh/m²

c)

2kW/m²

d)

5kW

14.

When considering the critical design month for a stand-alone PV system, which scenario is typically most challenging?

a)

Best insolation and most load usage

b)

Worst insolation and most load usage

c)

Worst insolation and least load usage

d)

Best insolation and least load usage

15.

What is the recommended method for roofers to prevent water intrusion at structural attachments?

a)

Caulking around the screw

b)

Extrusions

c)

Flashing

d)

Syzygy

16.

Which of the following is used to calculate maximum system voltage?

a)

Current

b)

Power

c)

Temperature

d)

Irradiance

17.

A PV system that would produce 7kWac under STC conditions, which is not clipping power, is installed in a location with an average of 6PSH (peak sun hours, aka kWh/square meter per day average) would produce how much energy in one year?

a)

14,008 kWh

b)

1,503 kWh

c)

3,307 kWh

d)

15,330 kWh

18.

Optimal tilt for off-grid PV system in the winter

a)

Latitude

b)

Latitude −15 degrees

c)

Latitude +15 degrees

d)

Vertical

19.

What color wires can be used for equipment grounding (earthing is international term) wires in the US?

a)

Green, Bare or Green with Yellow stripe

b)

White or Blue

c)

Yellow or Blue

d)

Any color

20.

 Direction on a compass is

a)

Latitude

b)

Longitude

c)

Meridian

d)

Azimuth

21.

On a non-isolated functionally grounded (formerly known as ungrounded in the 2014 NEC) PV array, what does the equipment grounding conductor do or is there a requirement to have an equipment grounding conductor?  

a)

Ensure that neutrals are referenced to ground potential

b)

Cause a common reference point of system grounding

c)

There is no requirement to have an equipment grounding conductor on a non-isolated functionally grounded system.

d)

Prevent shock from exposed equipment

22.

You are rebuilding an old battery system for a PV museum and everything is in amps and amp hours. You are told that the system needs to have 33% more PV
production on average than what the loads require. The loads will require 20Ah per day and the insolation will be 5PSH. If the module current at STC is 8A at Imp
and 9A at Isc, how many PV source circuits would be needed to meet the minimum requirements stated here?

a)

1

b)

2

c)

3

d)

4

23.

Besides calculations, where can we find out what would be the maximum series fuse rating of a PV module?

a)

On the back of the module

b)

On the PV wire instructions

c)

By multiplying Imp x 1.56 and rounding up to the next common fuse size

d)

By multiplying Isc x 1.25 and rounding up to the next common fuse size

24.

What is the highest angle which the sun can be anywhere in the world?

a)

23.5 degress

b)

45 degrees

c)

90 degrees

d)

180 degrees

25.

Which type of circuit has to have the wire and equipment sized based on at least 156% of short circuit current?

a)

PV source circuits

b)

Dc-to-dc converter source circuits

c)

Interactive inverter output circuits

d)

Stand-alone inverter input circuits

26.

An arc is caused by higher

a)

Voltage

b)

Current

c)

Resistance

d)

Energy

27.

Which tilt angle from horizontal would get the best annual production from a location in Toronto at 43 degrees north?

a)

42 degrees

b)

58 degrees

c)

15 degrees

d)

20 degrees

28.

 What is “blocking” used for?

a)

Bypass diodes

b)

Attaching to a roof in a place where there is no rafter

c)

Leveling off a parapet

d)

Inserting reverse current into a circuit to prevent forward bias current

29.

Best sealant for residential rooftop

a)

Polyurethane

b)

Paraffin

c)

Bitumen

d)

Silicon

30.

What kind of ground faults do most inverters detect?

a)

High voltage

b)

Medium voltage

c)

AC

d)

DC

31.

What would be the most practical way to add battery backup to an existing grid-tied system?

a)

Grid defection system

b)

Reinstalling the system

c)

Ac-coupled

d)

Dc-coupled

32.

A PV array produces 10kWh in a day in a location with 5 peak sun hours and a nominal battery voltage of 24V. What is the minimum required wire ampacity of the following for the PV output circuit?

a)

15A

b)

150A

c)

300A

d)

400A

33.

How long do PV module manufacturers generally warranty their modules for?

a)

10 years for materials and 10 years for performance

b)

25 years for materials and 25 years for performance

c)

25 years for materials and 10 years for performance

d)

10 years for material and 25 years for performance

34.

A supply-side connection will have the PV interconnection between the ________ and the ________.

a)

Meter, main breaker

b)

Main breaker, subpanel

c)

Service fused disconnect and main panel in basement

d)

Meter-main combo and subpanel

35.

Where can you find the requirements for rapid shutdown of PV systems on buildings?

a)

UL

b)

OSHA

c)

NFPA 70

d)

IRC

36.

There is a system with 4 concrete pavers (weights) securing it on a rooftop. What kind of system is this?

a)

Ballast rack mount

b)

Ballast standoff

c)

East-west tilt mount

d)

Single axis-tracker

37.

In the image below of an IV curve, which point mostly represents the MPP on a hot day?

a)

A

b)

B

c)

C

d)

D

38.

Which of the following would be considered a dead load on the roof of a building?

a)

Lift from wind

b)

Snow drift temporarily built up under an array

c)

PV modules and racking

d)

A hail storm

39.

Which of the following must be included as part of an emergency action plan for OSHA?

a)

Job specific PPE

b)

Procedure for reporting of fires

c)

Module specification sheets

d)

Types of module used for the system

40.

Where should you direct a pyranometer to get the most accurate irradiance reading for your array?

a)

At the horizon

b)

Directly south

c)

In the plane of the array

d)

Away from shading

41.

Which of the following will show system components and connections?

a)

Electrical diagram

b)

Sunpath chart

c)

Module spec sheet

d)

IV curve chart

42.

In jurisdictions where class A fire rated roofing is required, what classification must

PV modules have to be installed on buildings?

a)

UL 9540 or 1973 and Class A or B

b)

UL 9540 and Class A

c)

UL 1703 or 61730 and Class A

d)

UL 1703 or 61730 and Class A or B

43.

Which is the best order of steps to complete before removing equipment during

troubleshooting and maintenance.

a)

Replace fuses, open disconnects, isolate equipment

b)

Open ac and dc disconnects, check breakers, test voltages

c)

Open ac and dc disconnects, isolate equipment, test voltages

d)

Test voltages, check breakers, replace fuses

44.

How far above the roof should an extension ladder be?

a)

1:4 feet

b)

3 meters

c)

≥ 3ft

d)

< 3feet

45.

After it is determined that there is adequate space on the roof, what is the next

step?

a)

Shade analysis

b)

Connecting inter-module strings

c)

Sending proposal to customer

d)

Putting together a permit

46.

Of the following, which is the best benefit of a PV system for a homeowner?

a)

VAR support

b)

Demand response

c)

Self-consumption

d)

Backup power

47.

What would be most important to measure when comparing actual vs. expected

performance as part of commissioning a typical ground mounted PV system?

a)

Imp and Isc

b)

Isc and Voc

c)

Voc and Vsc

d)

Imp and Vmp

48.

Which battery voltage would minimize conductor costs the most?

a)

12V

b)

24V

c)

48V

d)

400V

49.

A PV source circuit requires an overcurrent protection device and the short circuit

current of the PV module is 12A. What size fuse would you use?

a)

12A

b)

10A

c)

15A

d)

20A

50.

What is more likely to have to be replaced the soonest?

a)

AC disconnect

b)

PV module

c)

Electronic Power Converter

d)

MC connectors

51.

What happens to a PV module when you short circuit it?

a)

The PV module can break and needs to be replaced

b)

Nothing much

c)

The voltage goes up

d)

The fuse bows or the bypass diode breaks

52.

Traditional American net-metering is when you get credit for the rate of

energy when you are exporting energy to the grid.

a)

Retail

b)

Wholesale

c)

Less than retail

d)

Less than wholesale

53.

How many silicon solar cells in series is best for charging a 12V lead-acid battery

if you are not using a MPPT charge controller?

a)

20

b)

36

c)

60

d)

72

54.

What is the use case for an interactive PV system on a rooftop that does not have

an energy storage system associated with it?

a)

Resilience in case of a power outage

b)

Extra current for loads

c)

Lower energy charges

d)

Demand charge reduction

55.

What is the proper slope of an extension ladder?

a)

1:3

b)

1:4

c)

1:5

d)

1:6

56.

What do you often see in a solar service agreement (SSA) to ensure system performance?

a)

Labor

b)

Remote monitoring

c)

Module 30-year warranty

d)

Rebate delineation

57.

Which level has the authority over enforcement of the NEC usually?

a)

State

b)

Federal

c)

NFPA

d)

Local

58.

What does a hydrometer measure?

a)

Water temperature

b)

Specific gravity of battery acid

c)

Lithium density

d)

Surfactant levels

59.

What is the NEC for?

a)

Practical safeguarding of electrical equipment

b)

Workplace safety for employees

c)

Safety for testing electrical equipment

d)

Practical safeguarding of persons and property

60.

A performance guarantee is:

a)

Something that can be spelled out in the fine print of a solar service agreement, such as a PPA or a solar lease and often tells a minimum of how much energy you should expect from your system.

b)

On the label of the module and guarantees that the solar module will make a certain amount of power in a specified amount of time, such as 20 years.

c)

On the datasheet of the module and guarantees that the solar module will make a certain amount of energy in a specified amount of time, such as 20 years.

d)

Covers solar module construction and components over a specified period of time, such as 20 years.

61.

A 50kW interactive PV system has 15% system losses in a location getting 5.4 peak sun hours per day average throughout the year. What would be the expected annual energy output?

a)

2 MWh

b)

44 kWh

c)

8.3 kWh

d)

83,768 kWh

62.

The interconnection of a PV system is approved by

a)

City

b)

County

c)

State

d)

Utility

63.

An off-grid installation has a 1HP pump that is on 10% of the time and a 20W light that is on 100% of the time. What is the energy use per month?

a)

54Wh

b)

68kW

c)

68kWh

d)

0.63 MWh

64.

Bypass diodes

a)

Reduce current

b)

Limit effects of shading

c)

Are wired in series with groups of solar cells and prevent reverse current

d)

Are in the combiner box

65.

To ensure electrical safety, which of the following should be done first?

a)

Open dc disconnect

b)

Open ac disconnect

c)

Close all disconnects

d)

Identify all power sources

66.

What part of the permit process addresses manufacturers’ warranties?

a)

Racking design

b)

PV plan sets

c)

Engineered drawings

d)

Equipment specifications

67.

For a supply-side connection, the output of the inverter is limited by

a)

Service entrance conductor ampacity

b)

Load side breaker ampacity

c)

PV dimension and quantity

d)

Locational irradiance

68.

What is the C rate of a 100Ah battery at 5A?

a)

5C or C/5

b)

0.05C or C/20

c)

500C or C/100

d)

100C or C/100

69.

Which PPE should be used when working at voltages over 600V?

a)

Insulated gloves

b)

Torque screwdriver

c)

Lifeline

d)

Pyranometer

70.

What power percentage of PTC is STC?

a)

75%

b)

156%

c)

108%

d)

25%