1.
What is the volume of one bag of cement?
a)
0.05 m³
b)
0.035 m³
c)
0.045 m³
d)
0.030 m³
2.
What is the percentage of contractor’s profit considered in estimation?
a)
5%
b)
7%
c)
10%
d)
12%
3.
In estimation, centage charges are also known as:
a)
Overhead charges
b)
Lump sum provision
c)
Supervision charges
d)
Material wastage
4.
Which estimate is made when additional works are added to the original project?
a)
Revised Estimate
b)
Supplementary Estimate
c)
Abstract Estimate
d)
Detailed Estimate
5.
What is the purpose of 'Tools and Plant' provision in estimate?
a)
For buying machinery and software
b)
For material testing
c)
For purchasing required construction tools
d)
For building supervision
6.
What is the percentage provided for electrification and water supply in building estimates?
a)
5%
b)
10%
c)
15%
d)
20%
7.
Which sanction confirms technical soundness and design feasibility?
a)
Administrative Sanction
b)
Expenditure Sanction
c)
Technical Sanction
d)
Project Approval
8.
Which of the following plans shows utility services and road layout?
a)
Elevation Plan
b)
Layout Plan
c)
Index Plan
d)
Site Plan
9.
Which component is used to calculate unit costs for estimation?
a)
Schedule of Rates
b)
IS 456 Code
c)
Tender Abstract
d)
Construction Manual
10.
Which term refers to the area used exclusively for horizontal and vertical circulation?
a)
Carpet Area
b)
Floor Area
c)
Plinth Area
d)
Circulation Area
11.
Which estimate includes a brief report, site plan, and approximate cost?
a)
Detailed Estimate
b)
Preliminary Estimate
c)
Revised Estimate
d)
Supplementary Estimate
12.
What does the Index Plan represent?
a)
Plinth Area layout
b)
Orientation of building
c)
Overall project scheme
d)
Interior layout
13.
Which of the following is a direct financial subdivision in estimation?
a)
Abstract
b)
Sub Head of Work
c)
Contractor’s Bill
d)
Valuation Summary
14.
What is the meaning of 'capital cost' in estimation?
a)
Cost of materials only
b)
Labor wages for 1 year
c)
Land cost only
d)
Total cost including external services
15.
Which estimate is required when scope of work is significantly changed?
a)
Technical Estimate
b)
Final Estimate
c)
Revised Estimate
d)
Provisional Estimate
16.
Which quantity represents temporary additions for specialist works?
a)
BOQ Quantity
b)
Prime Cost
c)
Provisional Sum
d)
Standard Quantity
17.
What is the out-turn of 12 mm cement plastering per mason per day?
a)
10 m²
b)
6 m²
c)
8 m²
d)
12 m²
18.
Which document in tendering contains blank columns for rates and amounts?
a)
BOQ
b)
Detailed Estimate
c)
Abstract Estimate
d)
Revised Estimate
19.
Which of the following is considered a lump sum item?
a)
Earthwork
b)
Sanitary fittings
c)
Brick masonry
d)
RCC slab
20.
Earnest Money Deposit (EMD) is generally what percent of the estimated cost?
a)
0.5% to 1%
b)
1.5% to 2%
c)
2.5% to 3%
d)
10%
21.
What is meant by 'Day Work' in estimation?
a)
Work done on daily wage basis
b)
Work charged per hour
c)
Item with estimated standard output
d)
Pre-measured contract job
22.
Which term is used for the amount spent in making the item including all cost heads?
a)
Price
b)
Cost
c)
Value
d)
Rate
23.
Which sanction is obtained from competent authority before incurring any expenditure?
a)
Expenditure Sanction
b)
Technical Sanction
c)
Administrative Sanction
d)
Project Sanction
24.
Which term refers to the output of a labour per day for a particular item?
a)
Work Charged
b)
Out-turn
c)
Abstract
d)
Quantity Book
25.
Which of the following best defines 'Prime Cost'?
a)
Total construction cost
b)
Cost of a specialized work
c)
Cost of item at supplier's shop only
d)
Contractor’s profit margin