NEW
Font size
WorksheetsECE Laws Volume 2
Total questions: 70
Worksheet time: 25mins
How many registered ECE/s are required to sign plans worth more than Php. 100,000
As stated in the National Building Code, _ sets of survey plans, design plans, specifications and other documents must be prepared, signed and seal by licensed and registered professionals including ECEs.
five
Electrical, mechanical, and electronics regulation code is the title of what chapter in the amended national building code?
Chapter 13
The board of ECE requires supervision of registered ECEs when MATV and CCTV systems exceeding the price of _ pesos are installed.
25,000
The board of ECE requires the supervision of registered ECEs when CATV systems above how much in pesos are installed?
50,000 pesos
25,000 pesos
75,000 pesos
100,000 pesos
The board of ECE requires the supervision of registered ECEs when Computer systems above how much in pesos are installed?
The board of ECE requires the supervision of registered ECEs when Telephone systems with more than how many lines are installed?
1
5
3
It is the board of ECE resolution that provides the implementing rules and regulations governing the practice of ECE in the Philippines on MATV, CATV,CCTV, Paging, Etc.
BECE Resolution #1
BECE Resolution #2
BECE Resolution #3
BECE Resolution #4
It is the department order that provides the rules and regulations governing the low power ship radiotelephone service in the Philippines.
Department Order No. 79
Department Order No. 97
Department Order No. 78
Department Order No. 87
As stated in DO 87, what is the maximum power output authorized for low power sip radio telephone stations?
10 watts
5 watts
100 watts
50 watts
5:00 AM to 9:00 AM
