1.

The statutory requirements for the performance of a foul water drainage system are detailed in which one of the following?

a)

Water regulations

b)

Building regulations

c)

Construction regulations

d)

British Standard 8000

2.

Which of the following deals with gravity drainage systems inside buildings?

a)

BS EN 12056

b)

BS 6700

c)

BS EN 806

d)

Building regulation part L

3.

What building regulation document deals with drainage and waste disposal?

a)

Part F

b)

Part P

c)

Part H

d)

Part L

4.

What type of sanitary pipework system is shown in the diagram?

a)

Primary ventilated stack system

b)

Ventilated branch discharge system

c)

Modified one pipe system

d)

Secondary ventilated stack system

5.

What type of sanitary pipework system is shown in the diagram?

a)

Modified one pipe system

b)

Stub stack system

c)

Secondary ventilated stack system

d)

Primary ventilated stack system

6.

What type of sanitary pipework system is shown in the diagram?

a)

Primary ventilated stack system

b)

Stub stack system

c)

Ventilated branch discharge system

d)

Secondary ventilated stack system

7.

What type of sanitary pipework system is shown in the diagram?

a)

Modified one pipe system

b)

Ventilated branch discharge system

c)

Secondary ventilated stack system

d)

Stub stack system

8.

What type of sanitary pipework system is shown in the diagram?

a)

Stub stack system

b)

Primary ventilated discharge stack

c)

Rain water harvesting system

d)

Grey water harvesting system

9.

What is the minimum recommended dimension shown as X between the lowest branch connection and the invert of the drain to a 'two' storey property?

a)

450mm

b)

350mm

c)

600mm

d)

150mm

10.

What is the minimum recommended dimension shown as X between the lowest branch connection and the invert of the drain to a 'four' storey property?

a)

750mm

b)

450mm

c)

300mm

d)

600mm

11.

Which one of the following criteria must be observed when installing a stub stack system of sanitation pipework?

a)

Drain invert and ground floor level must not exceed 600 mm

b)

Drain invert and ground floor level must not exceed 1.8 m

c)

Drain invert and ground floor level must not exceed 1.3 m

d)

Drain invert and ground floor level must not exceed 900 mm

12.

Which one of the following criteria must be observed when installing a stub stack system of sanitation pipework?

a)

The highest waste connection allowed is 2.5 m above the invert of the drain

b)

The highest waste connection allowed is 1 m above the invert of the drain

c)

The highest waste connection allowed is 2 m above the invert of the drain

d)

The highest waste connection allowed is 1.5 m above the invert of the drain

13.

Which one of the following fittings should be used at the termination of a soil and vent pipe?

a)

Straight coupling

b)

Stand off pipe fastening

c)

Guarded bend

d)

Wire or plastic mesh cage

14.

Work is required on a below ground drainage system which has a primary ventilated stack system connected to it. Which of the following must be taken out of service during drainage operations?

a)

All sanitary fittings

b)

All WCs

c)

Bath only

d)

Wash basin only

15.

Which one of the following do sanitary appliances reduce?

a)

Water consumption

b)

Health

c)

Disease

d)

Cleanliness

16.

What is the minimum radius of the bend at the base of the soil and vent stack?

a)

300mm

b)

120mm

c)

450mm

d)

200mm

17.

What is the component that can be added to a remote branch for a single wash hand basin to prevent siphonage?

a)

Open air vent

b)

Automatic air vent

c)

Manual air vent

d)

Air admittance valve

18.

Which one of the following actions should be taken when removing a WC pan in a public toilet?

a)

Pour powerful disinfectant into the pan

b)

Make sure the work area is ventilated

c)

Flush the toilet at least three times

d)

Wear suitable hand protection

19.

Which one of the following types of PPE is most likely to be required when unblocking a section of drain pipe using drain rods?

a)

Rubber gloves

b)

Ear plugs

c)

Leather gloves

d)

Dust mask

20.

If foul water and sewage were to come into contact with a plumber's skin, the plumber could contract:

a)

Malaria

b)

Giardiasis

c)

Yellow fever

d)

Hepatitis

21.

A hand skin condition that can occur following repeated contact with chemicals is called?

a)

AIds

b)

Legionnaire's disease

c)

Hepatitis

d)

Dermatitis

22.

Working with drainage pipework can lead to what disease as a result of contact with rodent urine?

a)

Hepatitis

b)

Legionnaire's

c)

Weils

d)

Dermatitis

23.

What would be the best way to prevent a customer from using a sanitary appliance whilst work is being carried out on the soil stack?

a)

Isolate the incoming cold water

b)

Place warning notices on the appliances

c)

Write a letter to the customer

d)

Isolate the electrics in the property

24.

If an air admittance valve is located within some boxing, what is required to allow the valve to operate effectively?

a)

Only one appliance can be discharged at any one time

b)

Additional ventilation in the boxing

c)

The boxing must be sealed

d)

Access from the loft area

25.

What type of drainage system is shown in the image?

a)

Combined system

b)

Separate system

c)

Partially separate system

d)

Soakaway system

26.

What type of drainage system is shown in the image?

a)

Separate system

b)

Combined system

c)

Partially separate system

d)

Unvented system

27.

What type of drainage system is shown in the image?

a)

Separate system

b)

Combined system

c)

Partially separate system

d)

Stub stack system

28.

What is the minimum distance for X in the diagram?

a)

900mm

b)

450mm

c)

1200mm

d)

350mm

29.

What is the component mounted on the top of the pipe in the image shown?

a)

Cage

b)

Globe

c)

Ball

d)

AAV

30.

What is recommended to stop crossflow in a soil stack opposite a WC?

a)

Air admittance valve

b)

No connections for 200mm

c)

No connections for 100mm

d)

Boss strap

31.

When permanently decommissioning a hand basin what should be left in place?

a)

Hot and cold supply feeds turned off by isolation valves only

b)

No materials or fittings left in place

c)

Discharge waste pipe with trap attached

d)

Discharge waste pipe with no trap connected