Total questions: 25
Worksheet time: 4mins
Which Department Order corresponds to the “Concrete Pouring Permit” requirement?
D.O. 211, s. 2000
D.O. 211, s. 2001
D.O. 211, s. 2011
D.O. 211, s. 2010
Which Department Order amends D.O. 53, s. 2019 concerning calibration guidelines for DPWH testing equipment?
D.O. 211, s. 2000
D.O. 246, s. 2024
D.O. 184, s. 2022
D.O. 86, s. 2025
Which Department Order mandates the “Standardization of Materials Testing Forms” for DPWH offices?
D.O. 211 s. 2000
D.O. 246, s. 2024
D.O. 184, s. 2022
D.O. 86, s. 2025
What is the main scope of D.O. 211, s. 2000?
Standardizing concrete mix design
Requiring contractors to secure a permit before any concrete pouring
Environmental safeguards during concreting
Safety procedures for working at heights
Which Department Order outlines administrative actions for contracts with negative slippage?
D.O. 193, s. 2016
D.O. 193, s. 2006
D.O. 183, s. 2006
D.O. 191, s. 2016
What is the main purpose of D.O. 85, s. 2020?
To provide standardized templates for variation orders and time variance requests
Standardize geotagging for all DPWH civil works projects
Ensuring uniform test result formats across DPWH laboratories
To standardize the format and use of project logbooks in all DPWH projects
What is the main purpose of D.O. 246, s. 2024?
To provide standardized templates for variation orders and time variance requests
Standardize geotagging for all DPWH civil works projects
Ensuring uniform test result formats across DPWH laboratories
To standardize the format and use of project logbooks in all DPWH projects
What is the primary objective of D.O. 50, s. 2020?
To provide standardized templates for variation orders and time variance requests
Standardize geotagging for all DPWH civil works projects
Ensuring uniform test result formats across DPWH laboratories
To standardize the format and use of project logbooks in all DPWH projects
Which project stages require geotagged photos under D.O 85, s. 2020?
Upon Mobilization, Monthly progress, completion
Before project implementation, Upon Mobilization, Monthly progress, and completion
During construction and upon completion
Only during final acceptance
Which of the following actions, when committed by a Project Engineer during the use of the Project and Contract Management Application (PCMA), would be considered a serious offense?
Providing inconsistent information in the PCMA
Failing to generate and retain monthly reports
Entering erroneous data
No and/or Inconsistent NYS Reasons
Which of the following actions, when committed by a Monitoring Engineer during the use of the Project and Contract Management Application (PCMA), would be considered a serious offense?
Providing inconsistent information in the PCMA
Failing to generate and retain monthly reports
Entering erroneous data
No and/or Inconsistent NYS Reasons
Who is primarily responsible for ensuring the accuracy, timely updating, and quality of data reflected in the PCMA?
Resident Engineer
Monitoring Engineer
Project Engineer
Head of IOs
Who is responsible for ensuring that all contract details (from the CWA) and project/project component details (from the MYPS) are consistent prior to being set up in the PCMA?
Resident Engineer
Monitoring Engineer
Project Engineer
Head of IOs
Designated as the official source of a project's physical accomplishment
SWA
PCMA
QCP
JCF
It is the official monitoring system of all infrastructure (civil works) projects and contracts from 2016 onwards
SWA
PCMA
QCP
JCF
Who is responsible for ensuring that the status of the contracts assigned to them is updated in the PCMA?
Resident Engineer
Monitoring Engineer
Project Engineer
Head of IOs
Which DPWH Department order requires the use of standard forms to ensure uniformity of format in undertaking project documentation on various DPWH infrastructure projects?
D.O. 46, Series of 2022
D.O. 26, Series of 2022
D.O. 26, Series of 2016
D.O. 46, Series of 2016
What level of negative slippage triggers the issuance of a first warning letter to the contractor?
5%
10%
15%
Which Department Order governs the maintenance and management of project records in DPWH?
D.O. 193, s. 2016
D.O. 85, s. 2020
D.O. 211, s. 2000
D.O. 216, s. 2000
Forms used to record inspections at Milestones, Hold Points or Witness Points by the Contractor and the Engineer’s Representative.
SWA
PCMA
QCP
JCF
it specifies the minimum number of tests required for an item of work which corresponds to the quantities stated in the approved Program of Work of a project.
CQCA
Status of Test
QCP
Design Mix
A certificate that attests that the materials incorporated into the project works correspond to the quantity accomplished and conform with specifications.
SWA
CQCA
QCP
Material Test Result
It is a report of the updated on-file and balance number of tests of construction materials being used in the project
QCP
CQCA
SWA
Status of Test
Who is responsible for preparing the Quality Control Program (QCP) in a DPWH project?
Materials Engineer
Materials Engineer of the contractor
Project Engineer
Project Engineer of the contractor
Which DPWH issuance provides guidelines on the processing, approval, and reporting of the Contractor’s Safety and Health Program (CSHP)?
DPWH D.O. 421, Series of 2024
DPWH D.O. 124 Series of 2024
DPWH D.O. 241, Series of 2024
DPWH D.O. 214, Series of 2024