SETTING OUT

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

What is the first step in building setting out procedure?

a)

Install profile boards

b)

Establish the frontage line and mark it on site

c)

Dig trenches

d)

Set column layout

2.

What does the frontage line represent?

a)

Road curb or center line reference

b)

The back wall position

c)

The height of building

d)

Roof slope indicator

3.

What is done after establishing the base line?

a)

Paint the floor

b)

Install steel bars

c)

Mark and check the main building lines

d)

Erect scaffolding

4.
  1. Which tool is used to mark building corners on the ground?

a)

Paint

b)

Stout Peg

c)

Rope

d)

Concrete Post

5.

Which equipment is used to measure long distances on site?

a)

Ruler

b)

Steel measuring tape

c)

Folding Meter

d)

Measuring Tape

6.
  1. What is the purpose of diagonal check during setting out?

a)

To set column height

b)

To align the roof slope

c)

To ensure corners are at right angles

d)

To confirm wall thickness

7.

After all angles and lengths are confirmed, what is the final step?

a)

Lay bricks

b)

Set up profile boards at each building corner

c)

Install electrical wiring

d)

Pour foundation

8.

Which line is closest to the road and allowed by local authorities?

a)

Base line

b)

Back line

c)

End wall line

d)

Wall center line

9.
  1. Which tool is commonly used to check right angles during setting out?

a)

Compass

b)

Spirit Level

c)

Crowbar

d)

Builders Square

10.
  1. What is used to mark exact reference points on the ground?

a)

Wooden Peg

b)

Rope

c)

Hammer

d)

Rebar

11.
  1. What tool is used to stretch and align layout lines between batter boards?

a)

Nail Gun

b)

Bolt Cutter

c)

Plumb Bob

d)

String Line

12.
  1. What tool is used to ensure a level line across profile boards?

a)

Spirit Level

b)

String Line

c)

Measuring Tape

d)

Plumb Bob

13.
  1. Which equipment is used to check vertical alignment during setting out?

a)

Plumb Bob

b)

Water Level

c)

Set Square

d)

Tape Measure

14.
  1. What is typically used to support the batter board structure?

a)

Rope

b)

Hammer

c)

Brace

d)

Nail

15.

What is the function of a batter board in the profile board setup?

a)

To support the base slab

b)

To hold strings that mark wall lines

c)

To anchor pegs

d)

To measure trench depth

16.

Which part of the profile board holds the batter board above ground?

a)

Stake

b)

Brace

c)

String

d)

Peg

17.

What is the purpose of the brace in a profile board?

a)

To create angles

b)

To mark the center line

c)

To measure distance

d)

To stabilize the batter board

18.

The string line tied across batter boards is used to mark:

a)

Door opening positions

b)

The center and outer wall lines

c)

The building roof level

d)

Plumbing locations

19.

Which tool is used to ensure all profile boards are level?

a)

Tape measure

b)

Hammer

c)

Spirit level

d)

Laser Cutter

20.

What must be done before setting up the profile boards?

a)

Build the walls

b)

Complete diagonal check

c)

Set up site hoarding

d)

Dig the foundation